Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 283: 1996-035-01 EXP YAKAMA RESERVATION WATERSHED PROJECT
Project Number:
Title:
Yakama Reservation Watershed Project
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
56662 REL 283
Contract Title:
1996-035-01 EXP YAKAMA RESERVATION WATERSHED PROJECT
Contract Continuation:
Previous: Next:
56662 REL 256: 1996-035-01 EXP YAKAMA RESERVATION WATERSHED PROJECT
  • 94526: 1996-035-01 EXP FY24 YAKAMA RESERVATION WATERSHED PROJECT
Contract Status:
Issued
Contract Description:
The Yakama Reservation Watershed Project has completed numerous restoration actions since 1996 in the Satus, Toppenish, and Ahtanum Watersheds-- all tributaries of the Yakima River.  These actions targeted ESA listed Middle Columbia Steelhead as well as other anadromous and resident fish species.  Under this contract, we intend to implement and design several projects to further enhance fish habitat.

Under the contract beginning April 1st, 2023, we will complete the following actions to enhance steelhead habitat:

-Remove a culvert / fish passage barrier, and replace with a bridge to allow access to 8 more miles of habitat for steelhead spawning and rearing
- screening of a ditch off of Toppenish Creek and prevent entrainment of steelhead at the location of the Lawrence Ditch
- Implement more phases of Beaver Dam Analogues to improve wetland meadow complexes
- Complete restoration designs (funded by BPA) for Pom Pom RM40, and designs for a new bridge and culverts (different funding sources) to allow appropriate floodplain connection and flow conveyance. Designs will outline restoration actions to improve up to 2.3 miles of Toppenish Creek, fish passage barrier removal, floodplain connection, riparian planting, fencing, and an increase in complexity leading to a self-sustaining environment.
- Designs for first of four identified reaches of Satus Creek to implement wood structures (engineered), and loose wood to increase complexity, access side channels, and increase floodplain connectivity to provide habitat for all life stages of steelhead.

In addition to these restoration actions and designs, we will continue to assist with instream minimum flow implementation, in-stream temperatures, fencing, and monitoring for adaptive management purposes.

CCR-48834
modification to add in $96,100 that had not been allocated in the original budget due to YRWP waiting on details to flush out the scope of work. YRWP now has those details to allocate the $96,100 to particular line items, such as:

1 -  a small contract to have assistance on data collection, interpretation, and presentation for juvenile steelhead in the Yakama Nation watersheds
2 - an on-call contract with a firm to assist with pre-design survey development, assist with additional surveys needed on restoration projects within the SOW, assist with presentation of restoration materials, and assist with vegetation plans
3 - adding funding to operations and equipment to purchase items for post restoration monitoring
4 - new line item for fencing at Simcoe west white swan to keep cattle out of the previously completed restoration project
5 - staff hours and cultural resource program time to complete section 106 on YRWP restoration projects
6 - line item for BPA staff time for support on the 3-way restoration project
Account Type(s):
Expense
Contract Start Date:
04/01/2023
Contract End Date:
03/31/2024
Current Contract Value:
$1,302,333
Expenditures:
$1,211,170

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Catherine Clark Bonneville Power Administration Yes Env. Compliance Lead cmclark@bpa.gov (503) 230-4240
Tom Elliott Yakama Confederated Tribes No Supervisor ellt@yakamafish-nsn.gov (509) 865-5121x6308
Loverne George Yakama Confederated Tribes Yes Administrative Contact geol@yakamafish-nsn.gov (509) 865-5121x6364
Tana Hoptowit Yakama Confederated Tribes Yes Administrative Contact hopt@yakamafish-nsn.gov (509) 865-5121x6318
Michelle O'Malley Bonneville Power Administration Yes COR mmomalley@bpa.gov (503) 230-5138
Jessica Power Bonneville Power Administration No CO Assistant jdpower@bpa.gov (503) 230-4023
Dallas Reed Yakama Confederated Tribes Yes Technical Contact reed@yakamafish-nsn.gov (509) 790-8596
Tim Resseguie Yakama Confederated Tribes Yes Technical Contact rest@yakamafish-nsn.gov (509) 945-7409
Shawna Warehime Yakama Confederated Tribes Yes Contract Manager wars@yakamafish-nsn.gov (509) 945-1259
Jesse Wilson Bonneville Power Administration Yes F&W Approver jcwilson@bpa.gov (503) 230-4506
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Completed Annual Report B: 132. Produce Project Annual Report for FY22 Mar22-Feb23 03/31/2024 04/01/2023
Effective implementation management and timely contract administration C: 119. Manage Restoration Projects 03/31/2024 03/31/2024
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish D: 114. Select habitat improvement actions and identify possible projects for next fiscal year 03/31/2024 03/31/2024
Environmental Compliance Complete E: 165. Environmental Compliance 03/31/2024 03/31/2024
Project databases that are maintained and up to date. F: 160. Update Project Database 03/31/2024 03/31/2024
5 Outreach Sessions Completed G: 99. Conduct field and classroom education at local schools 03/31/2024 03/31/2024
Disseminated Data. H: 161. Create informal summary reports and maps 03/31/2024 03/31/2024
Technical review and input provided to various policy and planning efforts. I: 122. Input to various Tribal planning and policy efforts 03/31/2024 03/31/2024
Outmigration estimate and other data from screw traps. J: 157. Operate rotary screw traps for steelhead 03/31/2024 03/31/2024
Complete three pass surveys in Satus and Ahtanum Creeks K: 157. Conduct steelhead and bull trout spawner surveys 03/31/2024 03/31/2024
Water temperature record L: 157. Collect water temperature data 03/31/2024 03/31/2024
Weekly manual discharge measurements M: 157. Collect discharge measurements 03/31/2024 03/31/2024
Redd distribution and adult abundance index N: 162. Analyze redd count data 03/31/2024 03/31/2024
Steelhead Outmigrant metrics O: 162. Analyze Steelhead Outmigrant Data 03/31/2024 03/31/2024
Ahtanum irrigation diversion managed P: 186. Assist with the operation of diversions and screens on Ahtanum Creek 03/31/2024 03/31/2024
Toppenish and Simcoe diversions managed Q: 186. Assist with operation of diversions and screens on Toppenish Creek 03/31/2024 03/31/2024
Functioning fences, wells, stock tanks, and habitat improvements R: 186. Maintain livestock wells/stock tanks/livestock fences/improved springs 03/31/2024 03/31/2024
Vegetation maintained S: 198. Maintain vegetation 03/31/2024 03/31/2024
Satus Wood replenishment Phase II Designs complete T: 175. Produce design for restoration at Satus Creek RM 25. 03/31/2024
Completed Designs for Pom Pom U: 175. Toppenish Creek RM 40 - Pom Pom Complete Restoration Designs 02/29/2024
Complete design set for Whatum Creek bridge V: 175. Whatum Creek Fish Passage Improvement 09/30/2023 04/20/2023
Install Beaver Dam Analogues W: 29. Install Beaver Dam Analogues: NF Logy Phase I 12/01/2023 09/29/2023
BDAs installed X: 29. Install Beaver Dam Analogues: Panther Creek Phase II 12/31/2023 09/29/2023
Lawrence Ditch Fish Screen Installed Y: 208. Lawrence Ditch Fish Screening 03/31/2024
Install Bridge (Remove Fish Passage Barrier) Z: 85. Whatum Creek Fish Passage Improvement 10/31/2023 09/25/2023

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 114 Identify and Select Projects
  • 3 instances of WE 175 Produce Design
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 2 instances of WE 162 Analyze/Interpret Data
  • 1 instance of WE 208 Irrigation Infrastructure Construction or Replacement
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 132 Produce Project Annual Report for FY22 Mar22-Feb23
C 119 Manage Restoration Projects
D 114 Select habitat improvement actions and identify possible projects for next fiscal year
E 165 Environmental Compliance
F 160 Update Project Database
G 99 Conduct field and classroom education at local schools
H 161 Create informal summary reports and maps
I 122 Input to various Tribal planning and policy efforts
J 157 Operate rotary screw traps for steelhead 04/01/2023
K 157 Conduct steelhead and bull trout spawner surveys 04/01/2023
L 157 Collect water temperature data 04/01/2023
M 157 Collect discharge measurements 04/01/2023
N 162 Analyze redd count data
O 162 Analyze Steelhead Outmigrant Data
P 186 Assist with the operation of diversions and screens on Ahtanum Creek 04/01/2023
Q 186 Assist with operation of diversions and screens on Toppenish Creek 04/01/2023
R 186 Maintain livestock wells/stock tanks/livestock fences/improved springs 04/01/2023
S 198 Maintain vegetation
T 175 Produce design for restoration at Satus Creek RM 25.
U 175 Toppenish Creek RM 40 - Pom Pom Complete Restoration Designs
V 175 Whatum Creek Fish Passage Improvement 09/01/2023
W 29 Install Beaver Dam Analogues: NF Logy Phase I 03/15/2022
X 29 Install Beaver Dam Analogues: Panther Creek Phase II
Y 208 Lawrence Ditch Fish Screening
Z 85 Whatum Creek Fish Passage Improvement