This page presents detailed associations and definitions for this Work Element. Information on how this Work Element is being used in BPA field work is also included.

Work Element 44: Enhance Nutrients in Water Bodies - Published

Collapse All    Expand All   
WE Name:
  44. Enhance Nutrients in Water Bodies (Nutrient Enhancement)
Work Category:
  Habitat - Habitat Improvement
Status:
  Active
Owner:
  Timmie Mandish
Definition:
  Addition of fish carcasses, or direct nutrient introduction methods to improve biological diversity in streams, rivers, or lakes.
Effective Dates:
  FY2005 to <no end date>
Work Phase:
  construction/implementation
Sort Sequence:
  5.11
Focal Species Required:
  Yes
Foundational Work Element:
  No
RM&E Metadata Required:
  No
Supports Katz:
  Yes
  • (Metric 1718 - 14.3 - Nutrient Enrichment - Carcass Placement)
  • (Metric 1719 - 14.2 - Nutrient Enrichment - Carcass Analog)
  • (Metric 1720 - 14.1 - Nutrient Enrichment - Fertilizer)
  • (Metric 1721 - 14.1 - Nutrient Enrichment - Fertilizer)
  • (Metric 1548 - 14.1 - Nutrient Enrichment - Fertilizer - Association expired)
Note:
  <none>
Back To TopAssociated Work Elements
Associated Work Elements:
 
Back To TopDeliverables
Deliverable Status:
  Required
Default Deliverable Desc:
  Improved Stream Chemical Composition
Deliverables:
 
  • Improved biological diversity
Back To TopRules and Examples
Rules and Examples:
 
Back To TopMilestones
Milestones:
 
  • Environmental compliance requirements complete
    On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff (completion can be based on pre-existing environmental documentation from BPA).

  • Develop nutrient/fertilizer enhancement management plan

  • Obtain nutrients/fertilizer (salmon carcasses, organic/inorganic nutrients)

  • Determine location(s) where nutrients/fertilizer should be added to system

  • Determine method(s) to add nutrients/fertilizer to system (by human or automated)

  • Add nutrients to system

8 Metrics Associated With Work Element: 44. Enhance Nutrients in Water Bodies

Metric Katz Metric Association Status Last Comment Date Last Comment By Unit Type FY Start FY End Required / Optional Included in PI
1523: Average width of treatmentNoActivenumber2010RequiredNo
1548: # of lbs of fertilizer addedYesExpirednumber20102010RequiredNo
1387: # of miles of stream with improved complexityNoExpirednumber20102010RequiredNo
1570: # of miles of stream treated with nutrientsNoActivenumber2010RequiredNo
1718: # of lbs of salmonid carcass fertilizer addedYesActivenumber2011RequiredNo
1719: # of lbs of carcass analog/fish meal brick fertilizer addedYesActivenumber2011RequiredNo
1720: # of lbs of liquid fertilizer addedYesActivenumber2011RequiredNo
1721: # of lbs of other nutrient fertilizer addedYesActivenumber2011RequiredNo
Rationale:
Back To TopLocation Guidance
Location Required:
  Yes
Number of Locations:
  1 - 100
Location Guidance:
  Identify point at each enhancement site. You may enter more than one point for this work element. If a location already exists in Pisces, click the "Link" button to synchronize locations.
Back To TopEnvironmental Compliance
Applicability and status of the following environmental compliance requirements can be found on the Environmental Compliance tab for that work element in your SOW for all 2007 contracts forward. BPA’s Environmental staff will update and maintain this information in Pisces in real time, so that you can check the status of environmental compliance on your project at any time.

Note: Many of the fields are set to auto-load in Pisces, but the settings will be reviewed by BPA’s Environmental staff prior to the contract being finalized, and may be revised depending on the specific circumstances.

  • National Environmental Policy Act (NEPA)
    NEPA coverage for this work element will be determined by BPA’s Environmental staff and could include an Environmental Impact Statement (EIS), Environmental Assessment (EA), Record of Decision to an existing EIS, or Categorical Exclusion.

  • Endangered Species Act (ESA)
    ESA consultation is typically required for this work element.

  • National Historic Preservation Act (NHPA)
    NHPA Section 106 consultation is typically not required for this work element.

  • Public Involvement
    Public involvement is typically required for this work element. The contractor should work with BPA Environmental staff to document previous or ongoing outreach efforts associated with this work or to develop a public involvement plan.

Reports that Use this Work Element

This work element and its metrics are used in measures in the following reports. These PDF reports are generated dynamically, always showing you the most up to date information. Most of them also have links to download the underlying data sets to structured text or Excel format.

Stats and Overview

Number of active contracts using Work Element #44 by FY
Top 5 BPA Project Managers using this Work Element:
(by number of current contracts)
Gregory Baesler (Inactive) 3
Jonathan McCloud 3
Roy Beaty 2
Virgil Watts III 2
Jan Brady 1
Average Work Element Budget:$104,060
Average Duration:8 months