Contract 23799: 1998-019-00 EXP WIND RIVER WATERSHED
Project Number:
Title:
Wind River Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Wind 100.00%
Contract Number:
23799
Contract Title:
1998-019-00 EXP WIND RIVER WATERSHED
Contract Continuation:
Previous: Next:
5480: 1998-019-00 WIND RIVER WATERSHED
  • 28164: 1998-019-00 EXP WIND RIVER WATERSHED-UNDERWOOD
Contract Status:
History
Contract Description:
This contract supports and is part of the Wind River Watershed Project, initiated in 1998.  The project's focus is on restoration of Wind River steelhead.  In 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia river as "threatened" under the Endangered Species Act.  In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical.  Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery/restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative.  Project participants are the Underwood Conservation District, US Geological Survey, US Forest Service, and Washington Department of Fish and Wildlife.  

This contract continues UCD support and participation in the project.  UCDs efforts include facilitation of the Wind River Watershed Council, the Wind River Technical Advisory Committee, education outreach to schools and the public, monitoring of water quality, and on-the-ground restoration work.  

This contract proposal involves
-Facilitation of both the Wind River Watershed Council and Wind River/White Salmon River Technical Advisory Group
-Continuous monitoring of water temperature at sites throughout the Wind River Watershed
-Water chemistry monitoring for low-level nutrients, in cooperation with the USGS Columbia River Research Laboratory
-Monitoring of past vegetation management work
-Planting of 2000 trees and weed removal from 5 acres
-Planning for the Middle Wind project south of Beaver Campground, involving installation of engineered logjams and related revegetation on about 1/2 mile of the Wind River, owned by Hollis/Misner families and the US Forest Service.  This work may be in conjunction with a US Forest Service Title II Grant.
-Additional project planning in the Wind River Watershed
-Technical Assistance to landowners
-Reporting and Administration of this BPA Contract
Account Type(s):
Expense
Contract Start Date:
07/01/2005
Contract End Date:
06/30/2006
Current Contract Value:
$64,622
Expenditures:
$64,622

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
COPY: Deliverable complete A: 118. Facilitate Wind River Watershed Council 06/30/2006 06/29/2006
COPY: Deliverable complete B: 118. Facilitate Wind River/White Salmon Technical Advisory Committee (TAC) 05/01/2006 04/21/2006
COPY: Deliverable complete C: 157. Water Temperature Monitoring 06/01/2006
COPY: Deliverable complete D: 157. Water Chemistry Monitoring 12/01/2005 02/13/2006
COPY: Deliverable complete E: 157. Vegetation Monitoring 06/30/2006 06/29/2006
COPY: Deliverable complete F: 114. Identify Wind River Watershed Projects 06/05/2006 03/16/2006
COPY: Deliverable complete G: 175. Engineering Plan 03/15/2006 04/11/2006
COPY: Deliverable complete H: 47. Tree and shrub planting 05/01/2006 03/31/2006
COPY: Deliverable complete I: 53. Weed Removal 06/30/2006 04/24/2006
COPY: Deliverable complete J: 2. Ensure environmental compliance for projects 03/31/2006 03/31/2006
COPY: Deliverable complete K: 99. Outreach and Education 06/01/2006 06/01/2006
COPY: Deliverable complete L: 99. Technical Assistance 05/01/2006 05/01/2006
COPY: Deliverable complete M: 119. Administration 06/30/2006 06/30/2006
COPY: Deliverable complete N: 132. Produce annual report for BPA 09/30/2005 09/08/2005

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 118 Facilitate Wind River Watershed Council
B 118 Facilitate Wind River/White Salmon Technical Advisory Committee (TAC)
C 157 Water Temperature Monitoring
D 157 Water Chemistry Monitoring
E 157 Vegetation Monitoring
F 114 Identify Wind River Watershed Projects
G 175 Engineering Plan
H 47 Tree and shrub planting
I 53 Weed Removal
J 2 Ensure environmental compliance for projects
K 99 Outreach and Education
L 99 Technical Assistance
M 119 Administration
N 132 Produce annual report for BPA
O 185 Quarterly reports