Project Number:
Title:
Umatilla Passage Operations and Maintenance (O&M)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Umatilla 100.00%
Contract Number:
24659
Contract Title:
198343600 EXP UMATILLA PASSAGE O&M
Contract Continuation:
Previous: Next:
19753: PI 198343600 UMATILLA PASSAGE O&M
  • 28839: 198343600 EXP UMATILLA PASSAGE O&M
Contract Status:
History
Contract Description:
PROJECT TITLE:  Umatilla Basin Fish Facilities Operation & Maintenance
PROJECT SPONSOR:  Westland Irrigation District, 77096 Highway 207, Echo, OR  97826
ADMINISTRATIVE CONTACT:  Mike Wick, wid.m.wick@eotnet.net
    P.O. Box 944, Hermiston, OR  97838
    541-667-2030 Office, 541-571-1200 Mobile, 541-667-2031 Fax
BUDGET PERIOD:  October 1, 2005 - September 30, 2006

PROJECT SCOPE:  Westland Irrigation District as contractor to Bonneville Power Administration (and West Extension Irrigation district, as subcontractor to WID), will provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record.

Job sites to be covered are:  Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility.

COORDINATION:  Contractor O & M personnel will coordinate with Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed.
Account Type(s):
Expense
Contract Start Date:
10/01/2005
Contract End Date:
09/30/2006
Current Contract Value:
$492,168
Expenditures:
$492,168

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Sarah Branum Bonneville Power Administration Yes COR stbranum@bpa.gov (503) 230-5115
Angela Dowling Bonneville Power Administration Yes Contracting Officer aldowling@bpa.gov (503) 230-3642
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Shannon Stewart Bonneville Power Administration Yes Env. Compliance Lead scstewart@bpa.gov (503) 230-5928
Mike Wick Westland Irrigation District Yes Contract Manager mwick@westlandirrigation.com (541) 667-2030


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
O&M at Stanfield Diversion Site complete A: 186. Stanfield Diversion Site O&M 09/30/2006 09/30/2006
O&M at Stanfield Ladder complete B: 186. Stanfield Ladder O&M 09/30/2006 09/30/2006
O&M at Feed Canal Diversion Site complete C: 186. Feed Canal Diversion Site O&M 09/30/2006 09/30/2006
O&M at Feed Canal Ladder complete D: 186. Feed Canal Ladder O&M 09/30/2006 09/30/2006
O&M at Westland Fish Screens and Diversion complete E: 186. Westland Fish Screens and Diversion O&M 09/30/2006 09/30/2006
O&M at Westland Juvenile Sampling Facility complete F: 61. Westland Juvenile Sampling Facility O&M 09/30/2006 09/30/2006
O&M complete for Westland Ladder and Hydraulic System for Gate Operation G: 186. Westland Ladder and Hydraulic System for Gate Operation O&M 09/30/2006 09/30/2006
O&M at Maxwell Diversion Site complete H: 186. Maxwell Diversion Site O&M 09/30/2006 09/30/2006
O&M at Three Mile Left Diversion Site complete I: 186. Three Mile Left Diversion Site O&M 09/30/2006 09/30/2006
O&M at WEID Diversion Fish By-Pass and Sampling Area complete J: 61. Fish By-Pass and Sampling Area at WEID Diversion O&M 09/30/2006 09/30/2006
O&M at Three Mile Right Ladder and Trap complete K: 186. Three Mile Right Ladder and Trap O&M 09/30/2006 09/30/2006
O&M at Three Mile Site Spawning Facility complete L: 61. Three Mile Site Spawning Facility O&M 09/30/2006 09/30/2006
O&M at Thornhollow Acclimation Site complete M: 61. Thornhollow Acclimation Site O&M 09/30/2006 09/30/2006
O&M at Pendleton Acclimation Site complete N: 61. Pendleton Acclimation Site O&M 09/30/2006 09/30/2006
O&M at Imeques Acclimation Site complete O: 61. Imeques Acclimation Site O&M 09/30/2006 09/30/2006
O&M at Minthorn Trapping Site complete P: 61. Minthorn Trapping Site O&M 09/30/2006 09/30/2006
O&M at South Fork of Walla Walla Spawning Site complete Q: 61. South Fork of Walla Walla Spawning Site O&M 09/30/2006 09/30/2006
Environmental compliance complete R: 165. Ensure project has environmental clearance from BPA 09/30/2006 09/30/2006
Final Annual Report for 2005 contract period S: 132. Prepare annual report 12/31/2005 12/31/2005

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
All Anadromous Fish
  • 9 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 8 instances of WE 61 Maintain Artificial Production Facility/Infrastructure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 186 Stanfield Diversion Site O&M
B 186 Stanfield Ladder O&M
C 186 Feed Canal Diversion Site O&M
D 186 Feed Canal Ladder O&M
E 186 Westland Fish Screens and Diversion O&M
F 61 Westland Juvenile Sampling Facility O&M
G 186 Westland Ladder and Hydraulic System for Gate Operation O&M
H 186 Maxwell Diversion Site O&M
I 186 Three Mile Left Diversion Site O&M
J 61 Fish By-Pass and Sampling Area at WEID Diversion O&M
K 186 Three Mile Right Ladder and Trap O&M
L 61 Three Mile Site Spawning Facility O&M
M 61 Thornhollow Acclimation Site O&M
N 61 Pendleton Acclimation Site O&M
O 61 Imeques Acclimation Site O&M
P 61 Minthorn Trapping Site O&M
Q 61 South Fork of Walla Walla Spawning Site O&M
R 165 Ensure project has environmental clearance from BPA
S 132 Prepare annual report
T 185 Quarterly reporting