Resident Fish above Chief Joseph and Grand Coulee Dams
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Columbia Upper 100.00%
Contract Number:
26360
Contract Title:
1997-004-00 RESIDENT FISH STOCK STATUS ABOVE CHIEF JOE AND COULEE
Contract Continuation:
Previous: Next:
21744: PI 1997-004 RESIDENT FISH STOCK STATUS ABOVE CHIEF JOE AND GRAND
  • 31471: 1997-004-00 RESIDENT FISH STOCK STATUS ABOVE CHIEF JOE AND COULEE
Contract Status:
Closed
Contract Description:
WE's A-N, AP Kalispel Tribe of Indians
WE's O-AA Washington Department of Fish and Wildlife
WE's AB-AJ Spokane Tribe of Indians
WE's AK-AO Colville Confederated Tribes

Goals:
Assess current fishery conditions in the Blocked Area, above Chief Joseph and Grand Coulee Dams, by conducting baseline habitat surveys of tributary streams, lakes, and reservoirs and assessing the stocks and status of all resident fish species known to exist in those water bodies.  

Compile fisheries, habitat, and water quality data into a unified database.  The Blocked Area fisheries information housed in a central location allows managers to view the entire system while making management decisions, rather than basing decisions on isolated portions of the system.

Recommend and implement management actions based on research results.

Background:  
The project Resident Fish Stock Status Above Chief Joseph and Grand Coulee Dams (also known as the Joint Stock Assessment Project; JSAP), developed in 1997, is a cooperative project designed and guided jointly by fisheries managers in the Blocked Area; the Kalispel Tribe of Indians, Washington Department of Fish and Wildlife (WDFW), Spokane Tribe of Indians, and the Colville Confederated Tribes.   The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System.  These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River.

In order to perform joint stock assessment, the participants needed to develop a central database of fisheries related data for the Blocked Area that would be accessible to all Blocked Area managers.  Initial development of the database involved collecting all existing data, and storing them in various electronic formats at the Kalispel Tribe JSAP office in Spokane, WA.  Data gaps were identified and new investigations were initiated to fill those gaps.  A Unified JSAP Database was constructed in 2002, incorporating all data compiled for the Blocked Area to date into a Microsoft SQL Server 2000 database.  

In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated in the Unified JSAP Database, it was necessary to develop standardized methodologies between the JSAP fisheries managers.  Common collection and analytical methodologies were developed in 1999, and revised in 2002.  Since 1999, the project has been addressing some of the identified data gaps throughout the Blocked Area.  

Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation.  Specific projects include migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of seven streams and four lakes on the Spokane Indian Reservation.  These projects were completed through 2000.  Assessments of the Little Spokane River and its tributaries, tributaries to the Pend Oreille River, lakes throughout Pend Oreille County, and water bodies within and near the Spokane Indian Reservation were conducted in 2001, 2002, and 2003.  

In 2004, WDFW and the Kalispel Tribe identified as a priority the need to assess the current warmwater fishery conditions of the Box Canyon Reservoir, Pend Oreille River.  A standardized electrofishing, gillnetting, and fyke netting survey was conducted following the WDFW Standard Fish Sampling Guidelines for Washington State Ponds and Lakes (Bonar et al. 2000).  Additionally, baseline stream habitat, fish distribution, and abundance were determined for the Skookum Creek watershed, remaining tributaries in the Middle Spokane and Little Spokane watersheds, and upper Tshimikain Creek in 2004.    

In 2005, The Kalispel Tribe initiated a radiotelemetry study of northern pike in the Box Canyon Reservoir, Pend Oreille River to determine seasonal distribution, migration patterns and timing, habitat use, and locate potential spawning areas.  Tracking 25 tagged fish will continue into the summer of 2006.  Littoral and limnetic surveys of Deer and Loon lakes were completed in 2005.  WDFW personnel aided the Lake Roosevelt White Sturgeon Recovery project conducting white sturgeon stock assessments in 2004 and 2005.  Spokane Arm Lake Roosevelt tributary surveys were completed to determine baseline stream habitat conditions, fish distribution, and critical low flow conditions.

In 2006, the project will complete the Harvey Creek kokanee spawning run monitoring.  Monitoring of the spawning run (2002-2006) is being conducted to establish trend data for the population, which was identified as a priority by regional managers due the relatively high variability in run sizes observed in previous years.  The run is monitored annually using a weir-style trap from early October through mid to late December.  Data collected during kokanee spawn monitoring includes species, length, weight, sex, reproductive condition, and fecundity.  The Kalispel Tribe will continue investigating the status of northern pike in the Pend Oreille River by conducting a diet analysis, a mark-recapture population estimate, and a recruitment study, in addition to continuing the tracking study through summer 2006.  A burbot stock assessment protocol will be developed for eastern Washington lakes, using CPUE, and the status of burbot stocks in Bead, Marshall, and Sullivan lakes will be determined.  A statistical model of redband rainbow trout presence as a function of stream habitat will be developed to help managers prioritize conservation and enhancement activities.  Work will continue on adfluvial spawner use of tributaries to the Spokane Arm of Lake Roosevelt and baseline habitat conditions of those tributaries.  Data from all collection activities, as well as the compilation of current and historical Colville Tribe fisheries, habitat, and water quality data will be submitted to the JSAP database manager for inclusion in the JSAP UDB.  

Location:  
The Joint Stock Assessment Project area (Blocked Area) covers 9.3 million acres with elevations ranging from 1000 feet above mean sea level to 7200 feet above mean sea level.  The project boundary is defined as all water body areas lying upstream of Chief Joseph Dam on the Columbia River System within the State of Washington.  Although the Blocked Area extends north and east into Canada and Idaho, respectively, the project area includes only the portion in Washington State at this time.  The northern and eastern boundaries lie within the Northern Rocky Mountains, while the southern and western boundaries lie within the volcanic soils of the Columbia Plateau.
Account Type(s):
Expense
Contract Start Date:
03/01/2006
Contract End Date:
02/28/2007
Current Contract Value:
$523,931
Expenditures:
$523,931

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Todd Andersen Kalispel Tribe Yes Technical Contact tandersen@knrd.org (509) 447-7245
Jason Connor Kalispel Tribe Yes Technical Contact jconnor@knrd.org (509) 447-7285
Terry Holtcamp Jr Bonneville Power Administration Yes Contracting Officer taholtcamp@bpa.gov (503) 230-3518
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Joe Maroney Kalispel Tribe Yes Contract Manager jmaroney@knrd.org (509) 447-7272
Jason Olson Kalispel Tribe Yes Technical Contact jolson@knrd.org (509) 447-7290
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625
Nancy Weintraub Bonneville Power Administration Yes Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373
Lorraine Wood Kalispel Tribe No Administrative Contact lwood@kalispeltribe.com (509) 445-1147x1239


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Sampling plans, schedules, and field maps. A: 174. Develop detailed sampling plans, schedules, and field maps 04/30/2006 04/27/2006
Northern pike location, habitat use and preference, receiver accuracy data prepared for analysis. B: 157. Track northern pike in the Box Canyon Reservoir, Pend Oreille River. 10/30/2006 12/21/2006
Mark-recapture data prepared for analysis C: 157. Conduct mark-recapture study of northern pike in the Box Canyon Reservoir, Pend Oreille River. 12/31/2006 11/23/2006
Northern pike diet data prepared for analysis. D: 157. Conduct a diet analysis of northern pike in the Box Canyon Reservoir, Pend Oreille River. 02/28/2007 02/23/2007
Northern pike spawning data prepared for analysis E: 157. Sample potential spawning areas for successful northern pike reproduction 12/31/2006 11/23/2006
Raw data, statistical summaries, and final report F: 157. Examine zooplankton productivity within the Box Canyon Reservoir, Pend Oreille River 02/28/2007
Temporary weir installed to collect spawning kokanee in Harvey Creek G: 70. Install and move Harvey Creek kokanee monitoring trap and weir 01/15/2007 12/21/2006
Individual and population data for analysis H: 157. Monitor the Harvey Creek kokanee spawning run. 01/15/2007 12/21/2006
Analyzed data to be reported in 2006 JSAP Annual Report. I: 162. Data analysis 12/30/2006
Final Annual Report (2005) and Draft Annual Report (2006) J: 132. Annual Report 02/28/2007
SOW Package, subcontracts with WDFW, STI, CCT, EWU, financial estimates and administrative requests K: 119. Develop SOW Package and manage subcontracts associated with the project 11/30/2006 12/01/2006
Coordination meeting L: 118. Conduct coordination meeting between all project participants. 10/30/2006 11/13/2006
Scientific collection permits M: 165. Obtain scientific collection permits 01/30/2007 01/25/2007
Interactive web-enabled JSAP UDB. N: 160. Maintain-update the JSAP Unified Database (UDB) and website 02/28/2007 02/28/2007
Permit to install and operate the temporary kokanee weir on Harvey Creek. O: 165. Renew the WDFW Hydraulic Project Approval permit for the Harvey Creek weir. 06/05/2006 10/02/2006
SOW Package, accrual estimates, administration, management of on the ground activities P: 119. Manage and administer WDFW portion of project implementation. 02/28/2007 02/28/2007
Study plans. Q: 156. Develop study plans for burbot stock assessment and Harvey Creek kokanee spawn monitoring 09/30/2006 09/15/2006
Temporary weir installed to collect spawning kokanee in Harvey Creek R: 70. Install and move Harvey Creek kokanee monitoring weir. 01/15/2007 12/22/2006
Individual and population data for analysis. S: 157. Conduct standardized burbot stock assessment surveys on Sullivan, Bead, and Marshall lakes. 01/15/2007 12/29/2006
Individual and population data for analysis T: 157. Monitor the Harvey Creek kokanee spawning run. 01/15/2007 12/29/2006
Database contents available to regional managers U: 159. Transfer certified data in currently stored in an MS Access database to the JSAP UDB and StreamNet 02/28/2007 02/28/2007
An MS Access database system with data, queries, forms, and reports and an updated JSAP UDB. V: 160. Update and maintain an MS Access-based database system for WDFW JSAP data 11/30/2006
Analyzed data for a research report. W: 162. Analysis of stock assessment survey and spawn monitoring data. 01/31/2007 02/22/2007
Scientific journal article manuscript. X: 183. Produce manuscript and submit to scientific journal 02/28/2007
3 quarterly progress reports Y: 141. Quarterly Progress Reports-WDFW 12/31/2006 01/05/2007
3 quarterly progress reports Z: 141. Quarterly Progress Reports-Spokane Tribe 12/31/2006 12/29/2006
3 quarterly progress reports AA: 141. Quarterly Progress Reports-Colville Tribe 12/31/2006 12/29/2006
Landowner permission AB: 118. Securing landowner permission 10/31/2006 10/31/2006
Raw data characterizing adfluvial spawning grounds and critical low flow stages AC: 157. Collect fishery and habitat data according to implementation plans 11/30/2006 11/30/2006
Analyzed data for Annual Report AD: 162. Analysis of stream habitat, fish, and water quality/quantity data. 01/31/2007 02/22/2007
Work element based SOW package, financial estimates AE: 119. Develop SOW package and other administrative requests 02/28/2007 12/08/2006
Compilation of data in Excel spreadsheets for incorporation into database AF: 160. Compile and enter current habitat and fisheries data for inclusion in JSAP UDB. 02/28/2007 02/28/2007
Completing 2006 sampling permit requirement; Applying for 2007 sampling permit. AG: 165. Obtain and report on scientific collection permits. 01/30/2007 01/26/2007
Compilation of data in MS Access database AH: 160. Compile and enter current habitat and fisheries data into JSAP compatible database 02/28/2007 02/28/2007
Electronic conversion of all historical field data AI: 157. Organize files of historical data and enter into computerized database 02/28/2007 02/28/2007
Model describing redband rainbow trout distribution. AJ: 156. Develop statistical model of redband rainbow trout distribution 11/30/2006 12/22/2006
Implementation Plans for spring, summer and fall sampling. AK: 156. Develop implementation plans 05/31/2006 05/31/2006
SOW Package, accrual estimates, administration AL: 119. Develop Scope of Work package and manage subcontract with the Kalispel Tribe 02/28/2007 02/28/2007

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Bass, Largemouth (Micropterus salmoides)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Bass, Smallmouth (M. dolomieu)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Burbot (Lota lota)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Catfish (Ictalurus spp.) [OBSOLETE]
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Carp, Common (Cyprinus carpio) [OBSOLETE]
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Crappie, Black (Pomoxis nigromaculatus) [OBSOLETE]
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Crappie, White (P. annularis) [OBSOLETE]
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Cutthroat Trout, Westslope (O. c. lewisi)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Freshwater Mussels
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Kokanee (Oncorhynchus nerka)
  • 2 instances of WE 70 Install Fish Monitoring Equipment
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Perch, Yellow (Perca flavescens) [OBSOLETE]
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Pike, Northern (Esox lucius) [OBSOLETE]
  • 1 instance of WE 174 Produce Plan
  • 5 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Pikeminnow, Northern (Ptychocheilus oregonensis) [OBSOLETE]
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Brown (Salmo trutta) [OBSOLETE]
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Brook (Salvelinus fontinalis)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Lake (S. namaycush) [OBSOLETE]
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Rainbow (Oncorhynchus mykiss)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Interior Redband (O. mykiss gairdnerii)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Walleye (Stizostedion vitreum) [OBSOLETE]
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Whitefish, Mountain (Prosopium williamsoni)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 174 Develop detailed sampling plans, schedules, and field maps
B 157 Track northern pike in the Box Canyon Reservoir, Pend Oreille River.
C 157 Conduct mark-recapture study of northern pike in the Box Canyon Reservoir, Pend Oreille River.
D 157 Conduct a diet analysis of northern pike in the Box Canyon Reservoir, Pend Oreille River.
E 157 Sample potential spawning areas for successful northern pike reproduction
F 157 Examine zooplankton productivity within the Box Canyon Reservoir, Pend Oreille River
G 70 Install and move Harvey Creek kokanee monitoring trap and weir
H 157 Monitor the Harvey Creek kokanee spawning run.
I 162 Data analysis
J 132 Annual Report
K 119 Develop SOW Package and manage subcontracts associated with the project
L 118 Conduct coordination meeting between all project participants.
M 165 Obtain scientific collection permits
N 160 Maintain-update the JSAP Unified Database (UDB) and website
O 165 Renew the WDFW Hydraulic Project Approval permit for the Harvey Creek weir.
P 119 Manage and administer WDFW portion of project implementation.
Q 156 Develop study plans for burbot stock assessment and Harvey Creek kokanee spawn monitoring
R 70 Install and move Harvey Creek kokanee monitoring weir.
S 157 Conduct standardized burbot stock assessment surveys on Sullivan, Bead, and Marshall lakes.
T 157 Monitor the Harvey Creek kokanee spawning run.
U 159 Transfer certified data in currently stored in an MS Access database to the JSAP UDB and StreamNet
V 160 Update and maintain an MS Access-based database system for WDFW JSAP data
W 162 Analysis of stock assessment survey and spawn monitoring data.
X 183 Produce manuscript and submit to scientific journal
Y 141 Quarterly Progress Reports-WDFW
Z 141 Quarterly Progress Reports-Spokane Tribe
AA 141 Quarterly Progress Reports-Colville Tribe
AB 118 Securing landowner permission
AC 157 Collect fishery and habitat data according to implementation plans
AD 162 Analysis of stream habitat, fish, and water quality/quantity data.
AE 119 Develop SOW package and other administrative requests
AF 160 Compile and enter current habitat and fisheries data for inclusion in JSAP UDB.
AG 165 Obtain and report on scientific collection permits.
AH 160 Compile and enter current habitat and fisheries data into JSAP compatible database
AI 157 Organize files of historical data and enter into computerized database
AJ 156 Develop statistical model of redband rainbow trout distribution
AK 156 Develop implementation plans
AL 119 Develop Scope of Work package and manage subcontract with the Kalispel Tribe
AM 185 Periodic Status Reports for BPA