SOW Report
Contract 26758: 200601100 EXP COLUMBIA BASIN SMOLT MONITORING PROGRAM
Project Number:
Title:
Smolt Monit & Fish Pass Data
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
26758
Contract Title:
200601100 EXP COLUMBIA BASIN SMOLT MONITORING PROGRAM
Contract Continuation:
Previous: Next:
n/a
Contract Status:
History
Contract Description:
Since the early 1980's, the Bonneville Power Administration (BPA) and others in the Region have funded work completed by the Fish Passage Center (FPC).  The Center provided daily information and analysis for various State, Federal, Tribal and local agencies to serve as the basis for Operational Requests associated with the Federal Columbia River Power System (FCRPS).

In November 2005, the US Congress passed legislation (House Report 109-275), which forbids BPA from making additional obligations in support of the FPC.  However, the work/studies previously completed by the Center have been valuable to the regional Fish and Wildlife Managers.  As specified in the House Report, the work will be transferred to other existing and capable entities in the region with a continuity of the activities.  

BPA has a three pronged approach to this; Battelle will provide under a separate agreement non-routine technical analysis and a forum for coordination and peer review.  CBFWA has been requested to provide coordination services for FPAC.  PSMFC under this agreement will provide the following activities as defined by BPA in a December 2005 solicitation.

The work is to:

1. Manage real-time database of smolt monitoring (and related) data.
2. Perform routine analysis and reporting and make that information available on the internet.
3. Coordinate implementation of the Smolt Monitoring Program.

Details are included in the following Statement of Work report in this document.
Account Type(s):
Expense
Contract Start Date:
03/01/2006
Contract End Date:
02/28/2007
Current Contract Value:
$0
Expenditures:

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Tracy Hauser Bonneville Power Administration Yes COR tlhauser@bpa.gov (503) 230-4296
Pam Kahut Pacific States Marine Fisheries Commission No Administrative Contact pam_kahut@psmfc.org (503) 595-3100
Rosemary Mazaika Bonneville Power Administration Yes F&W Approver rxmazaika@bpa.gov (503) 230-5869
Carter Stein Pacific States Marine Fisheries Commission Yes Technical Contact carters@psmfc.org (503) 595-3100
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Dona Watson Fish Passage Center Yes Administrative Contact dwatson@fpc.org (503) 230-4099
Nancy Weintraub Bonneville Power Administration No Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
ESA Section 10 Applications and Permits A: 165. SMP/GBT Environmental permitting and reporting 12/30/2006
Fishway Inspections B: 118. Fishway Inspections at Mainstem Columbia FCRPS & Mid Columbia PUD Dams 02/28/2007
SMP Coordination C: 118. Smolt Monitoring Program Coordination 02/28/2007
Proper dissemination of data and routine analysis D: 161. Provide data and analysis 02/28/2007
Successfully maintain data bases E: 160. Maintain long term data bases 02/28/2007
SMP Data Verification F: 159. Smolt Monitoring Program Site & other data 02/28/2007
SMP Remote Sites G: 156. SMP & Gas Bubble Trauma Sites 02/28/2007
Maintain CBSMP Library H: 161. CBSMP Library 02/28/2007
FY07 Funding Package - Submit 1st draft to COTR I: 119. Project/Contract Administration 02/28/2007
Relocate CBSMP J: 119. Move CBSMP offices to PSMFC Building 08/05/2006
CBSMP Annual Reports K: 132. Columbia Basin Smolt Monitoring Program Annual Reports 11/30/2006

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 SMP/GBT Environmental permitting and reporting
B 118 Fishway Inspections at Mainstem Columbia FCRPS & Mid Columbia PUD Dams
C 118 Smolt Monitoring Program Coordination
D 161 Provide data and analysis
E 160 Maintain long term data bases
F 159 Smolt Monitoring Program Site & other data
G 156 SMP & Gas Bubble Trauma Sites
H 161 CBSMP Library
I 119 Project/Contract Administration
J 119 Move CBSMP offices to PSMFC Building
K 132 Columbia Basin Smolt Monitoring Program Annual Reports
L 185 Periodic Status Reports for BPA