Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 27853: 1992 026 01 FLY CREEK STREAM RESTORATION PROJECT PHASE I
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
27853
Contract Title:
1992 026 01 FLY CREEK STREAM RESTORATION PROJECT PHASE I
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
PROJECT OBJECTIVES and PROJECT DESCRIPTION:

Introduction/Existing Conditions:

In the 1980s, log weirs were constructed perpendicular to the stream flow in Fly Creek to create pool habitat.  Pools that were created are typically wide and shallow with very little cover and complexity.  Log weirs have resulted in streambank erosion, creation of a wide and shallow stream channel with very little habitat complexity, and creation of a passage barrier to juvenile salmonids. Average bankfull width within the project area is approximately 25 feet.

This section of Fly Creek has very few pieces of large wood due to historic land use activities which included splash damming. Fly Creek contains spawning and rearing habitat for Snake River steelhead.

Project Objectives:

• Provide juvenile fish passage
• Prevent lateral channel and streambank erosion
• Reduce channel width
• Create habitat complexity in pools

Species Occurrence:  

Fly Creek contains spawning and rearing habitat for Snake River steelhead listed as threatened under the Federal Endangered Species Act.

Benefits:  

This project will improve water quality, improve riparian and floodplain function, enhance fish habitat diversity and complexity, and restore structural elements to the stream channel.
Account Type(s):
Expense
Contract Start Date:
06/01/2006
Contract End Date:
09/30/2006
Current Contract Value:
$19,930
Expenditures:
$19,930

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Teena Ballard US Forest Service (USFS) Yes Contract Manager tballard@fs.fed.us (541) 962-8571
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Lyle Kuchenbecker Grande Ronde Model Watershed Foundation No Interested Party lyle@grmw.org (541) 663-0570
Brad Lovatt US Forest Service (USFS) Yes Supervisor blovatt@fs.fed.us (541) 962-8590
Coby Menton Grande Ronde Model Watershed Foundation No Interested Party rcoby@grmw.org (541) 426-0389
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Jeff Oveson Grande Ronde Model Watershed Foundation No Interested Party jeff@grmw.org (541) 663-0570
Jesse Steele Grande Ronde Model Watershed Foundation No Interested Party jesse@grmw.org (541) 663-0570
Connar Stone Grande Ronde Model Watershed Foundation No Interested Party connar@grmw.org (541) 663-0570
Nancy Weintraub Bonneville Power Administration No Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373
Dorothy Welch Bonneville Power Administration Yes COR dwwelch@bpa.gov (503) 230-5479


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Complete environmental compliance process A: 165. Produce environmental compliance documentation 06/15/2006 06/15/2006
Complete project administration B: 119. Project administration 09/30/2006
Coordination with GRMW as needed - may not include all Deliverable Specs C: 118. Coordinate with the GRMW as specified in the GRMW-BPA MOU 09/30/2006 09/30/2006
Complete Log Weir Modification/Removal and Large Wood Additions D: 29. Enhance approximately 2.0 miles of Fly Creek 09/30/2006 09/30/2006
Complete Implemention Monitoring E: 157. Conduct project implementation monitoring 09/30/2006 09/30/2006
Project Completion Report G: 132. Project Completion Report 09/30/2006

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce environmental compliance documentation
B 119 Project administration
C 118 Coordinate with the GRMW as specified in the GRMW-BPA MOU
D 29 Enhance approximately 2.0 miles of Fly Creek
E 157 Conduct project implementation monitoring
F 185 Periodic Status Reports for BPA
G 132 Project Completion Report