Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 30651: 1991-071-00 EXP SNAKE RIVER SOCKEYE SALMON HABITAT AND LIMNOLOG
Project Number:
Title:
Snake River Sockeye Captive Propagation
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
30651
Contract Title:
1991-071-00 EXP SNAKE RIVER SOCKEYE SALMON HABITAT AND LIMNOLOG
Contract Continuation:
Previous: Next:
26989: 1991-071-00 EXP SNAKE RIVER SOCKEYE SALMON HABITAT AND LIMNOLOGIC
  • 35490: 200740200 EXP SNAKE RIVER SOCKEYE SALMON HABITAT AND LIMNOLOGICAL
Contract Status:
History
Contract Description:
Goal: To assess habitat limitations as it pertains to Snake River sockeye salmon Oncorhynchus nerka preservation and recovery, to implement activities necessary to increase and\or reestablish O. nerka productivity in nursery areas in the historic range of Snake River sockeye salmon, and to investigate fish community dynamics in lake nursery areas, including interactions between resident and anadromous O. nerka in present or potential Sawtooth Valley production areas.  We collaborate with the IDFG to determine release strategies, and assess fish performance from introduction into the lakes up through smolt migration.
Project objectives include: 1) monitor limnological parameters of the Sawtooth Valley lakes to assess lake productivity; 2) monitor sockeye salmon smolt migration from the captive rearing program release of juveniles into Pettit and Alturas lakes;  3) reduce the number of mature kokanee spawning in Fishhook Creek and Alturas Lake Creek; 4) monitor spawning kokanee escapement and estimate fry recruitment in Fishhook, Alturas Lake, and Stanley Lake creeks; 5) conduct sockeye and kokanee salmon population surveys; 6) evaluate potential competition and predation between stocked juvenile sockeye salmon and a variety of fish species in Redfish, Pettit, and Alturas lakes; and 7) assist IDFG with captive broodstock production activities.
Account Type(s):
Expense
Contract Start Date:
12/01/2006
Contract End Date:
11/30/2007
Current Contract Value:
$311,404
Expenditures:
$198,324

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Gregory Baesler Bonneville Power Administration Yes COR gdbaesler@bpa.gov (503) 230-7637
Andre Kohler Shoshone-Bannock Tribes No akohler@sbtribes.com (208) 239-4566
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Michelle O'Malley Bonneville Power Administration No Env. Compliance Lead mmomalley@bpa.gov (503) 230-5138
Doug Taki Shoshone-Bannock Tribes Yes Contract Manager dtaki@sbtribes.com (208) 239-4568
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Shannell Ward Shoshone-Bannock Tribes No Administrative Contact shannell.ward@sbtribes.com (208) 478-3821
Pam Waterhouse Shoshone-Bannock Tribes No Administrative Contact pwaterhouse@sbtribes.com (208) 478-3819


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Contract package (SOW, budget and property inventory) A: 119. Preparation of FY08 Pisces SOW 11/30/2007 10/01/2007
NEPA compliance, NOAA and IDEQ permit reports submitted B: 165. NEPA clearance for FY06/FY07, NOAA/DEQ Permits 11/30/2007 10/01/2007
Installation of both traps completed C: 70. Install screw trap on Alturas Lake Creek and juvenile weir on Pettit Lake Creek 04/21/2007 04/18/2007
Complete data collection for all limnological and biological variables D: 157. Complete data collection for all limnological and biological variables 11/30/2007 11/07/2007
Attend and Participate in TOC meetings E: 189. Regional Coordination 11/24/2007 11/28/2007
Fertilization of selected lakes F: 44. Nutrient Enhancement 10/20/2007 10/05/2007
Complete all milestones G: 162. Provide recommendations on lake fertilization and fish stocking. 11/30/2007 11/30/2007
Finish tagging of all pre-release juvenile sockeye salmon H: 158. Assist IDFG personnel with PIT tagging of juvenile sockeye salmon. 10/26/2007 09/26/2007
monitor sockeye salmon competition I: 190. Control Sockeye Salmon Competition 10/31/2007 10/03/2007
Submission to BPA as a technical report J: 183. Prepare submit Journal Article 11/30/2007
Submit Annual Progress Report to BPA on time. K: 132. Produce annual report. 08/15/2007 07/31/2007

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 44 Enhance Nutrients in Water Bodies
  • 1 instance of WE 183 Produce Journal Article
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Preparation of FY08 Pisces SOW 02/09/2007
B 165 NEPA clearance for FY06/FY07, NOAA/DEQ Permits 02/09/2007
C 70 Install screw trap on Alturas Lake Creek and juvenile weir on Pettit Lake Creek 08/14/2007
D 157 Complete data collection for all limnological and biological variables 08/14/2007
E 189 Regional Coordination 02/09/2007
F 44 Nutrient Enhancement 08/14/2007
G 162 Provide recommendations on lake fertilization and fish stocking. 02/09/2007
H 158 Assist IDFG personnel with PIT tagging of juvenile sockeye salmon. 08/14/2007
I 190 Control Sockeye Salmon Competition 08/14/2007
J 183 Prepare submit Journal Article 02/09/2007
K 132 Produce annual report. 02/09/2007
L 185 Periodic Status Reports for BPA 02/09/2007