Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 31887: 1996 077 05 MEADOW CREEK WATERSHED RESTORATION
Project Number:
Title:
Meadow Creek Watershed Restoration
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
31887
Contract Title:
1996 077 05 MEADOW CREEK WATERSHED RESTORATION
Contract Continuation:
Previous: Next:
26504: 1996 077 05 MCCOMAS MEADOWS WATERSHED RESTORATION
  • 36698: 1996-077-05 EXP NPT MEADOW CREEK WATERSHED RESTORATION
Contract Status:
History
Contract Description:
Contract History:
The Restore McComas Meadows/Meadow Creek Watershed project (1996-077-05) has been an on-going project of the Nez Perce Tribe Fisheries Watershed Program since 1996.  This project is being completed in cooperation with the Nez Perce National Forest (NPNF).  The ultimate goal of the project is to restore the physical and biological characteristics of the watershed to provide quality habitat for anadromous and resident fish species that support the historical, cultural and economic practices of the Nez Perce Tribe.  The Meadow Creek watershed contains proposed critical habitat for listed species steelhead trout and potential critical habitat for bull trout; it has moderate habitat potential for spring Chinook salmon.  Restoration in this watershed focuses on restoring riparian processes by addressing increased water temperatures, increased sedimentation, cattle grazing affects, fish passage issues, and noxious weed infestations.  Previously completed contract work includes 3 culvert replacements, 20 miles of road decommissioning, installation of riparian vegetation cages, over 22,000 riparian trees planted, installation and maintenance of 5 miles of fence, re-contouring of the McComas Meadow ditch, and continued monitoring and evaluation and revegetation surveys.

Summary of 2007-2008 Contract Work:
This project is part of the Nez Perce National Forest-Nez Perce Tribe Watershed Restoration Partnership with in kind contributions from the Nez Perce National Forest.   Funding, in the amount of $ 144,785 was approved by the Idaho Office of Species Conservation Pacific Coast Salmon Recovery Fund as a share to this project. This year's new contract work will include:

A) Technical review for road decommissioning-
Road densities in the Meadow Creek watershed are 4.6 miles per square mile, the highest road density in the South Fork Clearwater subbasin (USDA Forest Service 1998).  15 miles of roads within Orchard Creek will be decommissioned by re-contouring roads back to natural topography and de-compacting landing areas which will reduce surface erosion and sediment delivery to streams.  The Forest Service (Nez Perce National Forest) will decommission these roads under a separate contract with BPA, and the Nez Perce Tribe will assist in bid package preparation, contractor selection, technical oversight and final inspection.  The work will include removal of culverts, installation of waterbars, re-sloping water crossings to natural gradient, or full recontour of the road prism.  

B) habitat restoration-
Restore 2.0 miles of stream that is negatively impacted by roads within Orchard Creek.  This project proposes to re-vegetate the riparian zone and selected upland areas with native vegetation, including, but not limited to willow, hawthorn, pine and alder.  Re-vegetation of the riparian zone will increase bank stability while shading the water and reducing stream temperatures to levels suitable for anadromous fish spawning and rearing.  Streamside vegetation also makes available woody debris recruitment for habitat and cover within the stream.  In FY 07 we will plant an estimated 9,000 native trees within the Orchard Creek watershed.  Species of trees to be planted include serviceberry, ocean spray, hawthorn, ponderosa pine, Douglas fir, and redosier dogwood.

C) riparian planting-
Re-vegetation efforts have been going on in McComas Meadows since 2000 and have been successful.  However, Meadow Creek and its tributaries within McComas Meadows consist of over four miles of stream length, which was practically devoid of vegetation in the 1990s.  Additional plantings are warranted to provide a healthy, functioning riparian zone that provides shade to the stream, which will reduce lethal stream temperatures.  In FY 07 we will plant an estimated 2,500 native riparian trees within the McComas Meadow area.  Species of trees to be planted include Drummond willow, Thinleaf Alder, Aspen, and Red osier dogwood.

D) fence maintenance-
Five miles of fence were constructed in 1997 of wooden posts and a combination of rails and four-strand barbed wire to isolate and protect McComas Meadows.  Due to heavy snow loads, annual maintenance is required to maintain a properly functioning fence that protects riparian and stream habitat.

E) continued monitoring and evaluation-
Project effectiveness monitoring:  A monitoring protocol for culvert replacements will track the status of habitat within and around the culvert, as well as the stream channel's reaction to the newly installed culvert.  Monitoring for culvert replacements includes fish surveys above and below culverts, channel grade, in-culvert substrate, and profile measurements. A report on the success of previously and newly installed culverts will be completed.  Culvert replacement monitoring has been ongoing since 2005.  Per the protocol, culvert replacement monitoring in Meadow Creek is scheduled for the Storm Creek and the Covert Creek culverts for FY 07.

F) completion of design for future road decommissioning and riparian restoration-
Designs are a cooperative effort between the NPT and the NPNF.  The Forest Service and the Tribe gather the necessary field data and establish project staking and identification in the field.   Generally the NPNF takes the lead, and the Nez Perce Tribe reviews and approves all designs before being solicited for bids on construction and restoration projects.  Road decommissioning and the associated habitat restoration will reduce surface erosion and sediment delivery to streams and increase bank stability while shading the water and reducing stream temperatures.   The Meadow Creek Phase II project has been previously proposed and identified for treatment.  Designs will be completed during this contract cycle, and implementation will follow in the next two years, FY 08 and FY 09.

Project effectiveness monitoring:  The Nez Perce National Forest and the Nez Perce Tribe have developed a monitoring plan for decommissioned roads.  Data is used to monitor success and for suggesting improvements that could be made.  The annual monitoring plan has established numerous monitoring sites for all roads that have been obliterated and establishes a timetable for subsequent monitoring.  Specifically in Meadow Creek evaluation of approximately 20 miles of obliterated roads is accomplished by collecting monitoring data at four different sample sites as shown in the WE location.  Data collected for Road Obliteration Monitoring and Evaluation includes the following: locate and evaluate new mass failures, record and evaluate points of surface erosion, evaluate re-vegetation coverage and succession to native plants, measure stream channel restoration and adjustment, and, evaluate whether the treatment applied was appropriate for the land type.  Periodic monitoring has been done at these sites since FY 2004 per the protocol.

Status and Trend Monitoring: A monitoring protocol for selected stream habitat reaches will track the status and trend of Meadow Creek. Information will be collected on fish abundance and distribution, macro-invertebrates, flow, temperature, sediment composition, and habitat parameters to include channel morphology, valley width index, Wolman Pebble counts, cobble embeddedness, large woody debris, bank stability, and riparian condition and density.  This data will be summarized into a monitoring report, showing trends of conditions as a result of watershed restoration activities.  Five reaches on Meadow Creek are scheduled for monitoring in FY 07.  Monitoring for some of the parameters at these reaches began in FY 1997 and periodic monitoring has occurred annually since 1997.
Account Type(s):
Expense
Contract Start Date:
03/01/2007
Contract End Date:
02/29/2008
Current Contract Value:
$228,566
Expenditures:
$228,566

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration No Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Stephanie Bransford Nez Perce Tribe No Technical Contact stephanieb@nezperce.org (208) 983-0675
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Mark Johnson Nez Perce Tribe Yes Contract Manager markj@nezperce.org (208) 621-3561
David Kaplowe Bonneville Power Administration Yes COR djkaplowe@bpa.gov (503) 230-5365
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Heidi McRoberts Nez Perce Tribe Yes Contract Manager heidim@nezperce.org (208) 621-3548
Michelle Roberts US Forest Service (USFS) No Technical Contact mmroberts@fs.fed.us (208) 983-4091
Emmit Taylor, Jr. Nez Perce Tribe No Supervisor emmitt@nezperce.org (208) 621-3544
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance documentation submitted to BPA. A: 165. Provide environmental compliance information to BPA for projects on Forest Service Lands 05/31/2007 05/31/2007
Technical review completed B: 122. Provide Technical Review for the Orchard Creek Road Removal 11/30/2007 10/25/2007
Riparian re-vegetation complete C: 47. Plant riparian vegetation - Orchard Creek 11/30/2007 10/15/2007
Riparian re-vegetation complete D: 47. Plant riparian vegetation - McComas Meadows 02/29/2008 12/15/2007
Cages inspected and relocated E: 22. Protect hawthorne trees within McComas Meadows 09/30/2007 06/25/2007
Fence maintenance completed F: 186. Maintain Fence 12/30/2007 10/15/2007
Culvert data collected G: 157. Collect Data on Culverts that have been Replaced 11/30/2007 10/04/2007
Road data collected H: 157. Collect Data on Roads that were Removed 11/30/2007 10/12/2007
Habitat data collected I: 157. Stream Habitat Data Collection in Meadow Creek Watershed 02/29/2008 02/08/2008
2007 reports complete J: 162. Meadow Creek Data Analysis 02/29/2008 02/29/2008
Designs and cost estimates for Phase II road removal K: 175. Designs for Meadow Creek Phase II Road Decommissioning 02/29/2008 02/01/2008
FY 08 SOW package and accrual estimate L: 119. Management, Coordination and Communication 01/31/2008 02/15/2008
Final FY 06 and FY 07 annual reports uploaded to the BPA website M: 132. Annual Report 02/29/2008 02/29/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Provide environmental compliance information to BPA for projects on Forest Service Lands 02/09/2007
B 122 Provide Technical Review for the Orchard Creek Road Removal 02/09/2007
C 47 Plant riparian vegetation - Orchard Creek 05/10/2007
D 47 Plant riparian vegetation - McComas Meadows 02/09/2007
E 22 Protect hawthorne trees within McComas Meadows 02/09/2007
F 186 Maintain Fence 02/09/2007
G 157 Collect Data on Culverts that have been Replaced 02/09/2007
H 157 Collect Data on Roads that were Removed 02/09/2007
I 157 Stream Habitat Data Collection in Meadow Creek Watershed 02/09/2007
J 162 Meadow Creek Data Analysis 02/09/2007
K 175 Designs for Meadow Creek Phase II Road Decommissioning 02/09/2007
L 119 Management, Coordination and Communication 02/09/2007
M 132 Annual Report 02/09/2007
N 185 Periodic Status Reports for BPA 02/09/2007