Contract 32463: 200739800 CAP YAKIMA TRIB/PASS&FLOW- YTAHP
Project Number:
Title:
Yakima Basinwide Tributary Passage and Flow
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
32463
Contract Title:
200739800 CAP YAKIMA TRIB/PASS&FLOW- YTAHP
Contract Continuation:
Previous: Next:
n/a
  • 37460: 2007-398-00 CAP YAKIMA TRIBUTARY PASSAGE/HABITAT (YTAHP)
Contract Status:
Closed
Contract Description:
The Yakima Tributary Access and Habitat Program (YTAHP) works on Yakima River tributaries to re-establish fish passage, screen diversions, increase in-stream flow and enhance riparian and in-stream habitat.  Section 2.1.2 of the Yakima Subbasin Plan Supplement (Nov.26,2004. pg.8) speaks to limiting factors in the Yakima Subbasin and attributes the declines of aquatic species to “low flows; obstruction to fish migration and entrainment; diminished habitat quantity, quality and diversity; high temperatures; altered sediment transport; and degraded channel stability”.  (Yakima Sub-basin map page 14)

YTAHP developed from a number of groups engaged in watershed management, and/or habitat restoration within the Yakima River Basin. These groups include the Washington State Department of Fish and Wildlife, Kittitas County Conservation District, North Yakima Conservation District, Kittitas County Water Purveyors, the Yakama Nation, and Ahtanum Irrigation District. The US Bureau of Reclamation and the Yakama Nation participate in the development of many YTAHP projects.  The South Central Washington Resource Conservation and Development Council administers the program at the local level.

YTAHP has concentrated on tributaries upstream of Union Gap where salmonids are known to have occurred historically.  Streams have been surveyed for fish passage barriers, analyzed for screening of diversions, and assessed for habitat quality using WDFW’s  Salmonid Screening, Habitat Enhancement, and Restoration (SSHEAR) protocol. The SSHEAR assessments provide index numbers to facilitate prioritization of passage and screening projects; YTAHP participants also bring practical knowledge and local perspective, including land ownership and water rights, to the table. Projects are not prioritized strictly by SSHEAR index numbers, rather, the merits of each project are discussed by YTAHP participants in consideration of technical difficulty, funding availability, timing relative to agricultural and fish concerns, landowner/irrigator willingness to participate, and the likelihood of accomplishing a given project.

In general, projects on tributaries are prioritized sequentially, moving upstream from the confluence with the Yakima River; as projects are completed, the regained habitat is connected to the mainstem and available to anadromous fish.  At times projects may appear out of sequence but do fit in the context of multi-year planning.
Account Type(s):
Capital
Contract Start Date:
04/01/2007
Contract End Date:
03/31/2008
Current Contract Value:
$742,553
Expenditures:
$670,890

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Dawn Boorse Bonneville Power Administration No Env. Compliance Lead drboorse@bpa.gov (503) 230-5678
Edgar Harrell Washington Resource Conservation and Development Yes Contract Manager ytahp@nwinfo.old (509) 454-5736x128
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jay Marcotte Bonneville Power Administration Yes COR jgmarcotte@bpa.gov (503) 230-3943
Dave Myra Washington Resource Conservation and Development Yes Supervisor ytahp@scwrcd.org (509) 454-5736x128
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Program administration by YTAHP subcontractors A: 119. Work by YTAHP subcontractors to manage YTAHP projects 03/31/2008 03/31/2008
Final report uploaded to the BPA website B: 132. Submit Annual Report 03/31/2008
Project final design and engineering services D: 175. Project design / engineering 03/28/2008 03/28/2008
Permitting services E: 165. Permitting 03/31/2008 03/31/2008
Pott dam removal F: 85. Pott dam removal/modification 03/28/2008 12/14/2007
Pipeline installed G: 149. Fagalde/Wilson pipeline 03/28/2008
Siphon installed H: 80. Currier/ EWC siphon 02/01/2008 03/31/2008
Remove diversion I: 84. Durand Diversion 03/28/2008
Trees and shrubs planted J: 47. Ellensburg Treatment Plant planting 07/27/2007 06/29/2007
Pump Screen installed P: 69. Christensen pump screen 10/01/2007 10/01/2007
Pump screen installed Q: 69. Wonderland Campers Assoc. pump screen 10/31/2007 05/15/2007
Pump screen installed R: 69. Riley pump screen 09/28/2007 10/01/2007
Pump screen installed S: 69. Kisner pump screen 09/28/2007 10/01/2007
Pump screen installed T: 69. Mifflin pump screen 03/28/2008 03/28/2008
Pump screen installed U: 69. Site 8 pump sceen 03/28/2008 10/01/2007
Pump screen installed V: 69. Site 9 pump screen 10/26/2007 11/15/2007
Pump screen installed W: 69. Site 10 pump screen 07/20/2007 07/27/2007
Pipeline installed X: 149. Cowiche Creek Water Users Association 03/28/2008
Instream Habitat Improvements Y: 29. Schneider, Green, Wilkinson Habitat 11/09/2007 10/19/2007
.33 miles of fencing installed. Z: 40. Schneider, Green, Wilkinson Fence 03/14/2008 03/14/2008
Remove diversion barrier AA: 84. Remove Boyd Brown diversion 03/28/2008
Install measuring device. AB: 148. Boyd Brown diversion 06/29/2007 06/29/2007
Pump screen installed AD: 69. Hannah Nurse pump screen 11/02/2007 11/15/2007

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 84 Remove/Install Diversion
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 10 instances of WE 69 Install Fish Screen
  • 1 instance of WE 80 Install Siphon
  • 1 instance of WE 84 Remove/Install Diversion
  • 3 instances of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 148 Install Flow Measuring Device
  • 2 instances of WE 149 Install Pipeline

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Work by YTAHP subcontractors to manage YTAHP projects 02/09/2007
B 132 Submit Annual Report 02/09/2007
C 185 Periodic Status Reports for BPA 02/09/2007
D 175 Project design / engineering 02/09/2007
E 165 Permitting 02/09/2007
F 85 Pott dam removal/modification 04/12/2007
G 149 Fagalde/Wilson pipeline 02/09/2007
H 80 Currier/ EWC siphon 10/23/2007
I 84 Durand Diversion 02/09/2007
J 47 Ellensburg Treatment Plant planting 02/09/2007
K 85 Lower Lust Diversion Dam 02/09/2007
L 184 Fines Fish Passage 01/29/2008
M 69 Fines Diversion Fish Screen 01/29/2008
N 148 Fines diversion (Wide Hollow Creek) 01/29/2008
O 29 Fines diversion instream habitat 02/09/2007
P 69 Christensen pump screen 07/31/2007
Q 69 Wonderland Campers Assoc. pump screen 10/30/2007
R 69 Riley pump screen 08/01/2007
S 69 Kisner pump screen 08/01/2007
T 69 Mifflin pump screen 07/31/2007
U 69 Site 8 pump sceen 02/09/2007
V 69 Site 9 pump screen 10/31/2007
W 69 Site 10 pump screen 07/31/2007
X 149 Cowiche Creek Water Users Association 06/26/2007
Y 29 Schneider, Green, Wilkinson Habitat 07/10/2007
Z 40 Schneider, Green, Wilkinson Fence 07/10/2007
AA 84 Remove Boyd Brown diversion 04/27/2007
AB 148 Boyd Brown diversion 04/27/2007
AC 85 North Ahtanum Gauging station 02/09/2007
AD 69 Hannah Nurse pump screen 10/31/2007