Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 32668: 2007-065-00 EXP ISCC LITTLE SALMON HABITAT RESTORATION
Project Number:
Title:
Little Salmon Habitat Restorat
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
32668
Contract Title:
2007-065-00 EXP ISCC LITTLE SALMON HABITAT RESTORATION
Contract Continuation:
Previous: Next:
n/a
Contract Status:
History
Contract Description:
Project/Contract History:

The Salmon Subbasin Management Plan identified the Little Salmon River as severely impacted in terms of hydrology and habitat fragmentation (Northwest Power and Conservation Council, 2004).  Implementation of this project will address objective 12 rehabilitate connectivity, strategy 12A1 reconnect waterways, of the Salmon Subbasin Management Plan. The Squaw Creek culvert replacement project was identified in 2005 by the US Bureau of Reclamation liaison biologist assigned to the Little Salmon River to coordinate conservation measures for the 2004 remand version of the FCRPS Biological Opinion.  Both this project and contract will be initiated and fully completed in the 2007 calendar year.

Culvert Replacement Contract Fiscal Year 2007 Summary:

This contract will remove an existing perched culvert at stream mile 2.0 in Squaw Creek, tributary to the Little Salmon River, approximately 2.3 miles southwest of Riggins, Idaho and replace it with a bottomless arch culvert.  The contract will also include rehabilitation of a tributary channel that enters Squaw Creek over the stream bank immediately above the culvert to be replaced which will reconnect the tributary to itself and to Squaw Creek.  The project has been designed, costs estimated, permits and environmental compliance completed by the US Bureau of Reclamation' s Pacific Northwest Region Design Group Boise and Grangeville, Idaho staff as part of Reclamation' s implementation of conservation measures program. The request for Bonneville Power Administration funding is needed to comply with the non-federal cost share requirement for the Idaho Pacific Coast Salmon Recovery Fund portion of project funding. Construction is scheduled to begin July 30, 2007 and it is estimated that the instream portion of the project will last at most two weeks.  A fish salvage operation will be conducted by volunteers coordinated by the Reclamation liaison biologist prior to the dewatering of the stream.  

A subcontractor will be retained for construction, the Idaho County Roads Department will manage the project, Reclamation will provide engineering and biological assistance during construction, Idaho Department of Fish and Game will conduct pre and post construction fish surveys, and the Idaho Soil Conservation Commission will assist Idaho County with funding contract administration. The culvert will be maintained by the county roads department as part of their transportation system.   No funding will be requested beyond 2007 for this project.  Other funding for this project has also been secured from the following: The Idaho Pacific Coast Salmon Recovery Fund through the Idaho Office of Species Conservation ($92,000), American Rivers - NOAA Fisheries ($15,000), and The Idaho Fish and Wildlife Foundation ($5,000).
Account Type(s):
Expense
Contract Start Date:
05/01/2007
Contract End Date:
11/30/2007
Current Contract Value:
$65,000
Expenditures:
$65,000

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Mickey Carter Bonneville Power Administration No Env. Compliance Lead macarter@bpa.gov (503) 230-5885
John Dilts Idaho County No Contract Manager icroads@camasnet.com (208) 926-4471
Randy Doman Idaho County No Supervisor rdoman@idahocounty.org (208) 983-2751
Rose Gehring Idaho County No Administrative Contact rgehring@idahocounty.org (208) 983-2751
Janet Hohle Idaho Soil Conservation Commission Yes Technical Contact jhohle@agri.state.id.us (208) 882-4960x111
Theresa Hughes Bonneville Power Administration Yes Contracting Officer tchughes@bpa.gov (503) 230-5341
David Kaplowe Bonneville Power Administration Yes COR djkaplowe@bpa.gov (503) 230-5365
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental compliance documentation submitted to BPA A: 165. Provide environmental compliance documentation to BPA 07/01/2007 05/16/2007
Install bottomless arch culvert B: 184. Replace Squaw Creek culvert 08/31/2007 09/20/2007
Accrual estimate and supervised project implementation C: 119. General management and administration 09/30/2007 09/06/2007
Final FY 07 report uploaded to the BPA website D: 132. Submit Final Project Report for the period 5/1/07-11/30/07 11/30/2007 12/10/2007

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Provide environmental compliance documentation to BPA 02/09/2007
B 184 Replace Squaw Creek culvert 02/09/2007
C 119 General management and administration 02/09/2007
D 132 Submit Final Project Report for the period 5/1/07-11/30/07 02/09/2007
E 185 Periodic Status Reports for BPA 02/09/2007