Contract 32933: 1998-028-00 EXP TROUT CREEK WATERSHED IMPROVEMENT
Project Number:
Title:
Trout Creek Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Deschutes 100.00%
Contract Number:
32933
Contract Title:
1998-028-00 EXP TROUT CREEK WATERSHED IMPROVEMENT
Contract Continuation:
Previous: Next:
24542: 1998-028-00 EXP TROUT CREEK WATERSHED IMPROVEMENT
  • 37479: 1998-028-00 EXP IMPLEMENT TROUT CK WATERSHED RESTORE/ENHANCE
Contract Status:
Closed
Contract Description:
The focus of these efforts is on the implementation of the long-range action plan for the Trout Creek Watershed, in which those actions will improve fish and wildlife resources in the basin.  This project is located in portions of Wasco, Jefferson and Crook Counties, Oregon, that lie east of the Deschutes River, and generally north of Madras, south of Shaniko, and east of Mitchell, Oregon.  The latitude and longitude of Trout Creek at its confluence with the Deschutes River is; 44 degrees, 49 minutes and 18 seconds, North and 121 degrees 05 minutes and 13 seconds, West.  The latitude and longitude of the headwater area of Trout Creek is; 44 degrees, 30 minutes and 22 seconds North and 120 degrees, 33 minutes and 42 seconds West.

This project satisfies the goals listed in the Deschutes River Sub-basin Summary (Nelson, 2001), that portion of the draft Deschutes Subbasin Plan (2004) that addresses Trout Creek, and the Trout Creek Watershed Assessment (2003), and addresses four essential elements of the Oregon Plan for Salmon and Watersheds (Oregon Plan for Salmon and Watersheds, 1999): 1)  Coordinated agency programs, 2)  Community based actions, 3)  Monitoring and Evaluation, and 4)  Corrective changes (adaptive management and regulations).  This project also satisfies the objectives of Reasonable and Prudent Alternatives 150 and 153 of the 2000 FCRPS Biological Opinion calling for protection of riparian buffers by protecting high quality habitat and by leveraging the agricultural incentive programs.

The assessment follows the guidelines set in the Oregon Watershed Assessment Manual (Watershed Professionals Network, 1999).  Key components that assessment is: 1) Historical conditions, 2)  Channel habitat type classification, 3)  Hydrology and water use, 4)  Riparian and wetland conditions, 5)  Sediment sources, 6)  Channel modification, 7)  Water quality, and 8)  Fish and Wildlife habitat.  The proposed work also complements the work required in Trout Creek by FERC of PGE in the Re-licensing Settlement Agreement for the Pelton Round Butte Hydroelectric Project.

The long-range watershed restoration plan for Trout Creek will coordinate efforts of local landowners and private timber companies as well as state, federal, and tribal agencies to improve habitat conditions for fish and wildlife.  The plan would take a "top to bottom" approach.  The watershed assessment will be the key part of this plan and will describe potential problems, where they are located, and recommend way of resolving the issues and concerns.  A technical advisory committee made up of representatives from state, federal, and tribal agencies is being set up to develop scientifically sound restoration approaches.

Demonstration projects will also be implemented by this project.  For example, a need for immediate restoration efforts along Antelope and Trout Creeks exists.  Implementing these projects will demonstrate to local landowners what can be accomplished by working with the watershed council.  Landowners will be involved in projects throughout the watershed assessment/long-range watershed restoration planning process.

The Jefferson SWCD and the Oregon Department of Fish and Wildlife Trout Creek Project have been working cooperatively throughout the watershed assessment process.  The two groups will continue to work together developing the long-range action plan and seeing that habitat restoration projects are properly implemented.  This cooperation helps to leverage other funding sources, particularly the PGE Pelton Fund, Oregon Watershed Enhancement Board and the Deschutes Resource Conservancy, in habitat restoration projects in the Trout Creek Basin.

The costs of the proposed actions are shared with a number of other funding sources.  BPA will funded approximately twenty (20) percent of the habitat improvement work JCSWCD does in the Trout Creek Watershed this fiscal year.

Planned Projects:

All projects are designed to improve fish habitat, water quality and quantity in the Trout Creek basin.  Projects within the riparian zone that directly impact the stream will be conducted during the in-water work period (July 1 - October 31) as dictated by ODFW guidelines.  All projects will have landowner agreements and will be in compliance with all pertinent state and federal law, regulations and executive orders.  A Conservation Plan will be developed for all project conservation management units.  These plans will evaluate all pertinent resources and impacts.  

Antelope Creek Channel Habitat Improvement Project:

In 1965, after the flood of ‘64, the US Corps of Engineers (USACE) came to the Trout Creek Watershed and straightened the channel and constructed "flood control" berms on either side of the stream.  Subsequently, in the years that followed, the stream, with it's over widened channel started to erode the stream banks and adjacent agricultural fields.  This has also resulted in channel incision, decreasing the elevation of the water table and increasing the flashiness of the stream.

Presently, Antelope and Trout Creek have straightened, over wide channels that have lost connectivity to its floodplain.  Consequently, the habitat for ESA listed Mid-Columbia summer steelhead is in a degraded state.  The high width to depth ratio and lack of riparian vegetation found throughout the project area has resulted in elevated stream temperatures.  The proposed project will consist of constructing a new channel where needed and incorporating old stream channels where possible.  In addition, it will result in a reconnecting the floodplain and developing a new more robust riparian buffer.

On the Priday Site, the new channel will consist mostly of the Rosgen classification C4 stream type with some sections of B4 stream type.  The new channel will have the proper pattern, dimension and profile required to pass the appropriate size of sediment that is found in the streambed resulting in a stable stream channel.  Modified J-Hook vane structures will be strategically placed to maintain channel form and protect the stream banks from erosion until the riparian vegetation can get established.

Johnson Irrigation Improvement Project:

This project will consist of installing buried pipeline, connecting a sprinkler system to the diversion.  This project will eliminate over 2000 ft. of open ditch, conserving water.

Priday Irrigation Improvement Project:

This project will consist of installing buried pipeline, connecting two sprinkler systems to a diversion on Antelope Creek.  This project will improve irrigation efficiencies, using less water to properly irrigate the fields.

Nye Off-Site Water Facility:

This project will install two watering troughs, connecting them to a pre-existing water source.  This will allow livestock to water without getting in or near Trout Creek.
Account Type(s):
Expense
Contract Start Date:
04/01/2007
Contract End Date:
03/31/2008
Current Contract Value:
$139,245
Expenditures:
$139,245

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Produce BA For Antelope Creek Stream Project A: 165. Attain Environmental Coverage Habitat/Channel Realignment 05/15/2007 05/10/2007
Produce Design Specifications for Projects B: 175. Channel Habitat Improvement Plans - Priday Property 03/31/2008
Install Irrigation Pipeline C: 149. Johnson Irrigation Improvement Project 01/31/2008 01/25/2008
Install Irrigation Pipeline D: 149. Priday Irrigation Improvement Project 01/31/2008 03/26/2008
Install Fish Screen on Antelope Creek E: 69. Priday Irrigation Improvement Project 03/31/2008 03/26/2008
Replace Fish Screen on Antelope Creek F: 69. Priday Irrigation Improvement Project 03/31/2008
Install Off-Site Watering Facility G: 34. Nye Off-Site Watering Facility 10/31/2007
Annual Report Submitted I: 132. Annual Report 07/31/2007 07/31/2007
Project Managed J: 119. Manage Project 03/31/2008 03/31/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 34 Develop Alternative Water Source
  • 2 instances of WE 69 Install Fish Screen
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 149 Install Pipeline

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Attain Environmental Coverage Habitat/Channel Realignment 02/09/2007
B 175 Channel Habitat Improvement Plans - Priday Property 02/09/2007
C 149 Johnson Irrigation Improvement Project 03/18/2008
D 149 Priday Irrigation Improvement Project 03/18/2008
E 69 Priday Irrigation Improvement Project 03/18/2008
F 69 Priday Irrigation Improvement Project 03/18/2008
G 34 Nye Off-Site Watering Facility 03/11/2008
H 185 Periodic Status Reports for BPA 02/09/2007
I 132 Annual Report 02/09/2007
J 119 Manage Project 02/09/2007