Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 33328: 2007-394-00 EXP ID WATERSHED HABITAT RESTORATION-LEMHI
Project Number:
Title:
Upper Salmon Basin Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
33328
Contract Title:
2007-394-00 EXP ID WATERSHED HABITAT RESTORATION-LEMHI
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
The project scope is to implement action items to maintain, enhance and restore fish habitat and fish passage in the Lemhi sub-basin area within the administrative boundaries of the Bureau of Reclamation as directed under the 2000 and 2004 National Marine Fisheries Service's  BiOp's for the continued operation of the Federal Columbia River Power System.

Implementation of measures funded under this plan will achieve the objective of the Northwest Power Planning Council's Strategy for Salmon Recovery, the National Marine Fisheries Service Salmon Recovery Plan in terms of stabilizing and improving habitat for anadromous fish and the "Four Governors Salmon Recovery Recommendations for Salmon Recovery".

Migratory and habitat connectivity across the watershed's valley bottom areas is of high importance to ecologically-based restoration efforts because the tributary sub-watersheds tend to be dominated by federal lands and often provide habitat strongholds for native species of fish and wildlife.

Key habitat limitations in the watershed's bottomland areas include migration problems associated with irrigation push up dams,  unscreened irrigation diversions, and streambed sedimentation. Addressing these limitations may offer an opportunity to enhance the watershed's anadromous salmonids and will clearly benefit other native species of salmonids, other fish, and wildlife.  

In the past, the primary opportunity for addressing these problems in the Lemhi watershed has been through the Lemhi Soil and Water Conservation District (LSWCD) and the Upper Salmon Basin Watershed Project (USBWP) and their receipt of technical assistance from the Bureau of Reclamation to implement actions on non-federal land.   BPA's efforts to re-negotiate mutually acceptable contracts with the LSWCD and USBWP for continued implementation of BPA funded projects have been unsuccessful.   In the Lemhi watershed, the Bureau of Reclamation is available to continue providing technical support to BPA and implement measures identified for funding under this plan.   Sponsorship  tasks to be completed by Reclamation include project planning, coordination, design, inspection, and contract administration.

The goal of the projects identified is to improve anadromous fish passage in both specific local reaches and the overall aquatic health of the Lemhi sub-basin.  Implementation of identified projects will further the enhancement of the watershed by maintaining and/or restoring balance with watershed processes, restoring geomorphic diversity, reducing bank erosion, lowering summer temperatures, and improving fish habitat..
Account Type(s):
Expense
Contract Start Date:
06/01/2007
Contract End Date:
05/31/2008
Current Contract Value:
$7,446
Expenditures:
$7,446

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jan Brady Bonneville Power Administration Yes COR jebrady@bpa.gov (503) 230-4514
Mickey Carter Bonneville Power Administration No Env. Compliance Lead macarter@bpa.gov (503) 230-5885
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Al Simpson US Bureau of Reclamation (BOR) Yes Contract Manager jsimpson@usbr.gov (208) 756-6054
Lesa Stark US Bureau of Reclamation (BOR) No Supervisor ljstark@pn.usbr.gov (208) 383-2260


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Funding Package - Submit draft to COTR A: 119. Routine administration of contract 03/31/2008 10/01/2007
All EC, permits, etc provided to BPA B: 165. All environmental compliance documents 08/01/2007 07/23/2007
Complete diversion modifications C: 84. L-3AO Diversion Modification 09/21/2007 09/21/2007
Complete diversion modification D: 84. L-44 Diversion Modification 08/22/2007 08/13/2007
Complete repair of S 11-12 wing dam diversion E: 84. S 11-12 Diversion Modification 06/15/2007 06/15/2007
Final report uploaded to the BPA website G: 132. Submit Annual Report for the period June 1, 2007 through May 31, 2008 04/30/2008 04/30/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 84 Remove/Install Diversion
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 84 Remove/Install Diversion
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 3 instances of WE 84 Remove/Install Diversion
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 84 Remove/Install Diversion
Trout, Bull (S. confluentus) (Threatened)
  • 3 instances of WE 84 Remove/Install Diversion

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Routine administration of contract 02/09/2007
B 165 All environmental compliance documents 02/09/2007
C 84 L-3AO Diversion Modification 02/09/2007
D 84 L-44 Diversion Modification 07/09/2007
E 84 S 11-12 Diversion Modification
F 185 Periodic Status Reports for BPA 02/09/2007
G 132 Submit Annual Report for the period June 1, 2007 through May 31, 2008 02/09/2007