SOW Report
Contract 36326: 200739600 CAP FINAL DESIGN BERG-WILL & OLD LOWDEN SCREENS
Project Number:
Title:
Walla Walla Basinwide Tributary Passage and Flow
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
36326
Contract Title:
200739600 CAP FINAL DESIGN BERG-WILL & OLD LOWDEN SCREENS
Contract Continuation:
Previous: Next:
n/a
  • 43565: 200902600 CAP CONSTRUCT-OLD LOWDEN-BERGEVIN WILLIAMS CONSOLIDATN
Contract Status:
Closed
Contract Description:
Fish screens and fish passage were identified in the Walla Walla Subbasin Plan as  critical limiting factors that must be addressed to achieve recovery of ESA-listed Mid-Columbia steelhead and bull trout and ensure the success of reintroduced spring Chinook salmon in the Walla Walla Basin.  Consistent with the recommendations of the Subbasin Plan, Gary James, CTUIR Fisheries Program Manager, proposed under 1996-011-00 the design and construction of adult passage and juvenile screening facilities at the Old Lowden diversion (RM 29.3) and the Bergevin-Williams diversion (RM 31.6), both of which are located on the Walla Walla River.  Project 1996-011-00 was subsequently combined with 2 other capital projects into 2007-396-00.

These diversions have a negative effect on adult anadromous fish passage during the irrigation season when heavy equipment is used to push up temporary gravel dams to divert water from the Walla Walla River into the Old Lowden ditch and Bergevin-Williams ditch for irrigation.  They also have a negative effect on juvenile anadromous fish survival due to the use of non-compliant fish screens.  Potential may exist to consolidate one or both of these diversions with the state-of-the-art Garden City/Lowden 2 diversion (BPA funded project sponsored by CTUIR) which was constructed in 2000.  Work under this contract will include a feasibility study that will allow engineers and stakeholders to develop the best possible conceptual plans for the diversions, completion of engineered plans, specifications and an engineer’s cost estimate as well as acquisition of environmental permits/clearances and construction easements.

It should be noted that WWCCD plans to design pipeline projects for the Old Lowden ditch and the Bergevin-Williams ditch concurrently with this diversion design effort.   Our intention is to conduct the diversion design effort pipeline design effort in parallel as much as possible to ensure compatibility of the two systems.
Account Type(s):
Capital
Contract Start Date:
01/15/2008
Contract End Date:
08/31/2009
Current Contract Value:
$135,461
Expenditures:
$135,461

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Audrey Ahmann Walla Walla County Conservation District (SWCD) Yes Contract Manager audrey.ahmann@wwccd.net (509) 522-6340x107
Sarah Branum Bonneville Power Administration Yes COR stbranum@bpa.gov (503) 230-5115
Brenda Heister Bonneville Power Administration Yes Contracting Officer bsheister@bpa.gov (503) 230-3531
Rick Jones Walla Walla County Conservation District (SWCD) Yes Supervisor rick.jones@wwccd.net (509) 522-6340x110
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Lisa Marko MacLellan Bonneville Power Administration No Env. Compliance Lead lmmarko@bpa.gov (503) 230-4047
Jennifer Stolz Bonneville Power Administration No Interested Party jpstolz@bpa.gov (503) 230-3233


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Conceptual plans for Old Lowden and Bergevin-Williams diversions A: 174. Produce Conceptual Plan for Old Lowden & Berg Williams 10/31/2008 10/30/2008
Constructible plan for Bergevin Williams B: 175. Produce Design and Specs for Bergevin Williams 06/30/2009 06/30/2009
Constructible plan for Old Lowden C: 175. Produce Design and Specs for Old Lowden 06/30/2009 06/30/2009
Documentation and assistance to support BPA's Environmental Compliance Group D: 165. Environmental Compliance for two sites 08/31/2009 08/31/2009
Project management & administrative work complete F: 119. Manage and Administer Projects 08/31/2009 08/31/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 174 Produce Plan
  • 2 instances of WE 175 Produce Design
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 174 Produce Plan
  • 2 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 174 Produce Conceptual Plan for Old Lowden & Berg Williams 02/09/2007
B 175 Produce Design and Specs for Bergevin Williams 02/09/2007
C 175 Produce Design and Specs for Old Lowden 02/09/2007
D 165 Environmental Compliance for two sites 02/09/2007
E 185 Periodic Status Reports for BPA 02/09/2007
F 119 Manage and Administer Projects 02/09/2007
G 132 No annual report due under this contract 02/09/2007