| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Patterson Big Springs Creek #3 Flow Enhancements | A: 119. Manage and administer projects within this contract | 08/31/2009 | 08/31/2009 | |
| Produce environmental compliance documentation | B: 165. Provide BPA with all necessary permits and documents | 07/15/2009 | 09/30/2008 | |
| Produce Design and/or Specifications | C: 175. Produce Design and/or Specifications | 08/31/2009 | 08/31/2009 | |
| Irrigation Equipment and partial installation of equipment | D: 150. Purchase sprinkler equipment for PBSC #3 Project | 07/31/2009 | 05/22/2009 | |
| Attach Progress Report in Pisces | F: 132. Submit Progress Report for the period Sept 08 thru Aug 09 | 08/31/2009 | 08/26/2009 | |
| Reconnect Duck Creek to it's Historic Channel | G: 30. Reconnect Duck Creek to it's historic channel | 08/31/2009 | ||
| Remove P-9 Structure from Pahsimeroi | H: 84. Remove P-9 Structure from Pahsimeroi | 08/15/2009 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
| Sockeye (O. nerka) - Snake River ESU (Endangered) |
|
| Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 119 | Manage and administer projects within this contract | 02/09/2007 | ||||||
| B | 165 | Provide BPA with all necessary permits and documents | 02/09/2007 | ||||||
| C | 175 | Produce Design and/or Specifications | 02/09/2007 | ||||||
| D | 150 | Purchase sprinkler equipment for PBSC #3 Project | 08/15/2008 | ||||||
| E | 185 | Periodic Status Reports for BPA | 02/09/2007 | ||||||
| F | 132 | Submit Progress Report for the period Sept 08 thru Aug 09 | 02/09/2007 | ||||||
| G | 30 | Reconnect Duck Creek to it's historic channel | 08/04/2009 | ||||||
| H | 84 | Remove P-9 Structure from Pahsimeroi | 08/04/2009 |