Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 39392: 1991-061-00 EXP SWANSON LAKES WILDLIFE AREA O&M
Project Number:
Title:
Swanson Lake Wildlife Mitigation
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Crab 100.00%
Contract Number:
39392
Contract Title:
1991-061-00 EXP SWANSON LAKES WILDLIFE AREA O&M
Contract Continuation:
Previous: Next:
34925: 1991-061-00 EXP SWANSON LAKES WILDLIFE AREA O&M
  • 44566: 1991-061-00 EXP SWANSON LAKES WILDLIFE AREA O&M
Contract Status:
Closed
Contract Description:
The Swanson Lakes Wildlife Area (SLWA) was initially approved as a wildlife mitigation project in 1992 and was re-approved for operations and maintenance (O&M) funding in 2002 under the Sub-basin Planning Process for the Columbia Plateau Province. This project partially addresses adverse impacts caused by the construction of Chief Joseph and Grand Coulee hydroelectric dams. On the Swanson Lakes Wildlife Area, wildlife habitat enhancement efforts to meet mitigation objectives have been performed between 1993 and 2006, with enhancements completed as of 2006. Continued operation and maintenance activities funded by BPA are necessary to maintain wildlife habitat benefits and to ensure BPA's mitigation obligation is met. These activities are essential to further the goal of the Washington Department of Fish and Wildlife (WDFW) to protect shrubsteppe and other habitats necessary to recover and sustain local and region-wide populations of Columbian sharp-tailed grouse.

Management actions planned for FY09 include continued weed control, and management of extant shrubsteppe and riparian habitats, both  pre-existing and restored or enhanced sites, to maintain current HU values at SLWA. This may include activities such as replanting shrubs and trees lost to unexpected mortality, and inter-seeding restored grasslands if needed.

Roads, fences, parking areas, signs, and the kiosk will be maintained, repaired and replaced as needed. Debris and garbage will be removed and disposed of. Facilities, vehicles, and equipment will be maintained; one 14-year-old vehicle is scheduled for replacement in FY09, as it was not replaced as planned in FY 08.

Other tasks listed in the contract will be performed as needed.
Account Type(s):
Expense
Contract Start Date:
10/01/2008
Contract End Date:
09/30/2009
Current Contract Value:
$205,725
Expenditures:
$205,725

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Juli Anderson Washington Department of Fish and Wildlife (WDFW) Yes Contract Manager juli.anderson@dfw.wa.gov (509) 641-2241
Sheri Combs Washington Department of Fish and Wildlife (WDFW) Yes Administrative Contact sheri.combs@dfw.wa.gov (360) 664-4993
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Sandra Fife Bonneville Power Administration Yes COR safife@bpa.gov (503) 230-3678
Mike Finch Washington Department of Fish and Wildlife (WDFW) Yes Technical Contact mike.finch@dfw.wa.gov (509) 636-2344
Brenda Heister Bonneville Power Administration Yes Contracting Officer bsheister@bpa.gov (503) 230-3531
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Nancy Weintraub Bonneville Power Administration Yes Interested Party nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Deliverable: Receipt of environmental compliance clearance from BPA A: 165. Environmental compliance documentation 10/31/2008 10/31/2008
Maintenance of extant/restored shrubs/trees, and shrubsteppe and grassland habitat B: 22. Maintain extant/restored vegetation 09/30/2009 09/30/2009
Noxious weeds and undesirable vegetation controlled C: 22. Weed control 09/30/2009 09/30/2009
Functional boundary fencing and gates D: 186. Maintain fences and gates 09/30/2009 09/30/2009
Maintained roads, culverts, parking areas, signs, and kiosk E: 188. Maintain roads, culverts, parking areas and signs 09/30/2009 09/30/2009
Land leased from WDNR, and hay lease maintained with lessee F: 92. Maintain leases 09/30/2009 09/30/2009
Public use on SLWA monitored G: 157. Monitor recreational use on SLWA 09/30/2009 09/30/2009
Safe, functional buildings and wells H: 186. Maintain facilities 09/30/2009 09/30/2009
Administrative duties/professional development/licensing. Coordinated and responsive actions I: 119. General project administration 09/30/2009 09/30/2009
Fire suppression contracted, PILT, Weed Assessment Payments J: 119. Coordinate payments for fire protection contracts, PILT and weed assessments 09/30/2009 09/30/2009
Annual report of FY 09 activities K: 132. Submit Progress Report for the period October 2008 through September 2009 09/30/2009 09/30/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 2 instances of WE 22 Maintain Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 92 Lease Land
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental compliance documentation 02/09/2007
B 22 Maintain extant/restored vegetation 08/29/2008
C 22 Weed control 08/29/2008
D 186 Maintain fences and gates 08/29/2008
E 188 Maintain roads, culverts, parking areas and signs 08/29/2008
F 92 Maintain leases 08/29/2008
G 157 Monitor recreational use on SLWA 08/29/2008
H 186 Maintain facilities 08/29/2008
I 119 General project administration 02/09/2007
J 119 Coordinate payments for fire protection contracts, PILT and weed assessments 02/09/2007
K 132 Submit Progress Report for the period October 2008 through September 2009 02/09/2007
L 185 Periodic Status Reports for BPA 02/09/2007