Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 40909: 2007-402-00 EXP SNAKE RIVER SOCKEYE SALMON HABITAT AND LIMNOLOGIC
Project Number:
Title:
Snake River Sockeye Captive Propagation
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
40909
Contract Title:
2007-402-00 EXP SNAKE RIVER SOCKEYE SALMON HABITAT AND LIMNOLOGIC
Contract Continuation:
Previous: Next:
35490: 200740200 EXP SNAKE RIVER SOCKEYE SALMON HABITAT AND LIMNOLOGICAL
  • 45080: 2007-402-00 EXP SHO BAN SNAKE RIVER SOCKEYE HABITAT
Contract Status:
Closed
Contract Description:
Goal: To assess habitat limitations as it pertains to Snake River sockeye salmon Oncorhynchus nerka preservation and recovery, to implement activities necessary to increase and\or reestablish O. nerka productivity in nursery areas in the historic range of Snake River sockeye salmon, and to investigate fish community dynamics in lake nursery areas, including interactions between resident and anadromous O. nerka in present or potential Sawtooth Valley production areas.  We will collaborate with the IDFG to determine release strategies, and assess fish performance from introduction into the lakes up through smolt migration.
Project objectives include: 1) monitor limnological parameters of the Sawtooth Valley lakes to assess lake productivity; 2) monitor sockeye salmon smolt migration from the captive rearing program release of juveniles and eyed-eggs into Pettit and Alturas lakes;  3) reduce the number of mature kokanee spawning in Fishhook Creek and Alturas Lake Creek; 4) monitor spawning kokanee escapement and estimate fry recruitment in Fishhook and Alturas Lake creeks; 5) conduct sockeye and kokanee salmon population surveys; 6) evaluate potential competition and predation between stocked juvenile sockeye salmon and a variety of fish species in Pettit, and Alturas lakes; and 7) assist IDFG with captive broodstock production activities.
Account Type(s):
Expense
Contract Start Date:
12/01/2008
Contract End Date:
11/30/2009
Current Contract Value:
$388,083
Expenditures:
$388,083

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Gregory Baesler Bonneville Power Administration Yes COR gdbaesler@bpa.gov (503) 230-7637
Chad Colter Shoshone-Bannock Tribes No Supervisor ccolter@sbtribes.com (208) 239-4553
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Andrew Montano Bonneville Power Administration No Env. Compliance Lead ammontano@bpa.gov (503) 230-4145
Michelle O'Malley Bonneville Power Administration No Interested Party mmomalley@bpa.gov (503) 230-5138
Doug Taki Shoshone-Bannock Tribes Yes Contract Manager dtaki@sbtribes.com (208) 239-4568
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Shannell Ward Shoshone-Bannock Tribes No Administrative Contact shannell.ward@sbtribes.com (208) 478-3821
Pam Waterhouse Shoshone-Bannock Tribes No Administrative Contact pwaterhouse@sbtribes.com (208) 478-3819


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
NEPA compliance, NOAA and IDEQ permit reports submitted B: 165. NEPA clearance for FY06/FY07, NOAA/DEQ Permits 11/30/2009 11/25/2009
Complete collection of all limnological variables C: 157. Complete data collection for all limnological variables 11/24/2009 11/19/2009
Evaluate sockeye salmon smolt migrations D: 157. Evaluate sockeye salmon smolt migration from Pettit and Alturas lakes 07/08/2009 07/08/2009
Complete all adult spawning and hydroacoustic surveys E: 157. Estimate O. nerka populations in three Sawtooth Valley lakes. 11/14/2009 11/13/2009
Complete all milestones F: 162. Provide recommendations on lake fertilization and fish stocking. 11/30/2009 11/25/2009
Fertilization of selected lakes G: 44. Nutrient Enhancement 10/28/2009 10/14/2009
Monitor sockeye salmon competition H: 190. Control Sockeye Salmon Competition 10/31/2009 10/23/2009
Attend and Participate in TOC meetings I: 189. Regional Coordination 11/30/2009 11/18/2009
Submission to BPA as a technical report J: 183. Prepare submit Journal Article 11/30/2009
Contract package (SOW, budget and property inventory) K: 119. Preparation of FY09 Pisces SOW 11/30/2009 11/30/2009
Attach Progress Report in Pisces L: 132. Submit Progress Report for the period 1.01.2008 to 12.31.2008 08/15/2009 08/07/2009
Produce design for Pettit Lake Creek Weir modification M: 175. Produce design for Pettit Lake Creek Weir modification 06/26/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 44 Enhance Nutrients in Water Bodies
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 183 Produce Journal Article
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 165 NEPA clearance for FY06/FY07, NOAA/DEQ Permits 02/09/2007
C 157 Complete data collection for all limnological variables 09/09/2008
D 157 Evaluate sockeye salmon smolt migration from Pettit and Alturas lakes 09/09/2008
E 157 Estimate O. nerka populations in three Sawtooth Valley lakes. 09/09/2008
F 162 Provide recommendations on lake fertilization and fish stocking. 02/09/2007
G 44 Nutrient Enhancement 09/09/2008
H 190 Control Sockeye Salmon Competition 09/09/2008
I 189 Regional Coordination 02/09/2007
J 183 Prepare submit Journal Article 02/09/2007
K 119 Preparation of FY09 Pisces SOW 02/09/2007
L 132 Submit Progress Report for the period 1.01.2008 to 12.31.2008 02/09/2007
M 175 Produce design for Pettit Lake Creek Weir modification 02/09/2007