| Viable Restoration Projects Developed To Assist In The Attainment Of Project Goal |
A: 114. Habitat Restoration Project Development |
|
01/31/2010 |
01/31/2010 |
| NEPA Compliance Requirements Complete For Habitat Restoration Projects To Be Implemented |
B: 165. Obtain Environmental Compliance |
|
01/31/2010 |
01/31/2010 |
| Revegetate Disturbed Ground For Habitat Restoration Projects |
C: 47. Assist With Revegetate Disturbed Ground On Antelope Creek Project - Priday Property |
|
05/31/2009 |
04/30/2009 |
| Develop Fencing Design & Vegetation Restoration Plan For Willowdale Project |
D: 175. Develop Fencing Design & Vegetation Restoration Plan For Willowdale Project |
|
01/31/2010 |
01/31/2010 |
| Develop Off Channel Water Sources For Livestock (If Identified) |
E: 34. Develop Offsite Water Sources For Livestock |
|
01/31/2010 |
01/31/2010 |
| Monitor Trout Creek Basin Riparian Exclosures |
F: 26. Monitor Exclosures |
|
01/31/2010 |
01/31/2010 |
| Maintained Fences & Water Gaps |
G: 186. Maintain Riparian Corridor Fence |
|
01/31/2010 |
01/31/2010 |
| Maintained Bank Stabilization Structures |
H: 186. Maintain Bank Stabilization Structures |
|
01/31/2010 |
01/31/2010 |
| Maintained Instream Structures |
I: 186. Maintain Instream Structures |
|
01/31/2010 |
01/31/2010 |
| Repaired/Maintained Off Channel Water Development Sites |
J: 186. Repair/Maintain Off Channel Water Development Sites |
|
01/31/2010 |
01/31/2010 |
| Document Physical Habitat Changes In Response To Restoration Actions Funded By BPA |
K: 157. Document The Changes Of Habitat Restoration Practices in the Trout Creek basin. |
|
01/31/2010 |
01/31/2010 |
| Basin Wide Redd Counts |
L: 157. Adult Redd Counts |
|
06/15/2009 |
06/15/2009 |
| Post Monitoring Of Major Channel Habitat Improvement Project |
M: 157. Post Monitoring Each Phase (10 Miles ) Of Channel Habitat Improvement Reaches |
|
01/31/2010 |
01/31/2010 |
| Technical Assistance Provided |
N: 122. Provide Technical Assistance and Input |
|
01/31/2010 |
01/31/2010 |
| Develop Monitoring & Evaluation Plan For The Trout Creek Basin |
O: 156. Develop RM&E Plan & Funding Sources For Trout Creek Monitoring Plan |
|
01/31/2010 |
|
| Stream Water Temperature Monitored |
P: 157. Monitor Stream Water Temperature in the Trout Creek Basin |
|
01/31/2010 |
01/31/2010 |
| Data Captured In Two Data Bases (One For Adults & One for Juveniles) |
Q: 157. Monitor Smolt Production & Adult Escapement |
|
01/31/2010 |
01/31/2010 |
| Exclude Hatchery Summer Steelhead From Wild Trout Creek Stock |
R: 190. Remove/Exclude Hatchery Summer Steelhead |
|
06/30/2009 |
06/30/2009 |
| Summer Steelhead Smolts PIT Tagged |
S: 158. PIT Tag Outmigrant Summer Steelhead To Estimate Run Size |
|
09/30/2009 |
09/02/2009 |
| PIT Tag Data Submitted To PTAGIS |
T: 159. Submit & Acquire PIT Tag Data To/From PTAGIS |
|
06/30/2009 |
06/30/2009 |
| ESA Listed Mid Columbia Summer Steelhead Monitored |
U: 162. Analyze Adult Summer Steelhead Escapement & Summer Steelhead Smolt Out-migrant Estimates |
|
01/31/2010 |
01/31/2010 |
| Annual Report For Performance Period 2/1/08 - 1/31/09 |
W: 132. Annual Report |
|
10/31/2009 |
10/31/2009 |
| Manage & Administer Project |
X: 119. Manage & Administer Project |
|
01/31/2010 |
01/31/2010 |