Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 41658: 200850300 EXP FACTORS LIMITING OKANAGAN & WENATCHEE SOCKEYE
Project Number:
Title:
Studies into Factors Limiting the Abundance of Okanagan and Wenatchee Sockeye Salmon
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 1.00%
Methow 1.00%
Okanogan 49.00%
Wenatchee 49.00%
Contract Number:
41658
Contract Title:
200850300 EXP FACTORS LIMITING OKANAGAN & WENATCHEE SOCKEYE
Contract Continuation:
Previous: Next:
n/a
  • 46375: 2008-503-00 EXP FACTORS LIMITING OKANAGAN & WENATCHEE SOCKEYE
Contract Status:
Closed
Contract Description:
This project seeks to expand our knowledge on the factors limiting production of Okanogan and Wenatchee sockeye salmon stocks.  A primary factor affecting the Okanogan stock is believed to be survival upstream of Wells Dam.  To quantify this mortality, this project will fund PIT tag detection antennas at McIntyre Dam on the Okanogan River as well as a Vertical Diversion Structure upstream of Osoyoos Lake.  In addition, an acoustic tag antenna network will be developed upstream of Wells Dam.  Sockeye will be PIT tagged at the Bonneville Dam adult fish facility (as part of another MOA project, Upstream Migration Timing) as well as at the Wells Dam east bank fish trap.  Sockeye will also be acoustic tagged at Wells Dam.  Between the acoustic and PIT tags, Okanogan sockeye salmon mortality will be partitioned by reach upstream of Wells Dam and we hope to then be able to correlate survival with river and lake conditions, hopefully allowing survival to be increased through better Okanagan River management.  

This project will also standardize smolt abundance estimation methodologies between the two stocks by conducting annual hydroacoustic surveys of Lake Wenatchee to compare with those being conducted in Osoyoos Lake.  Given that the strength of the Wenatchee run relative to the Okanogan run has greatly declined in recent years, a plan for further Wenatchee sockeye research will be developed.

This project will expand our Upstream Migration Studies project (2008-518-00) by funding deployment of PIT tag detection antennas as well as an acoustic tag network in the Okanagan Basin.  This will allow sockeye salmon to be tracked through the Okanogan Basin, thereby allowing us to extend our migration survival estimates into the Okanogan River.  We also will be able to determine where in the Okanogan River-Osoyoos Lake mortality is occurring, which may then allow for the development of different river management actions to reduce this mortality.  It is hoped that, depending on where mortality is occurred, better flow management techniques to optimize adult survival can be developed.  The PIT tag network we develop as part of this project may also improve data on steelhead and Chinook use of the Canadian portion of the Okanogan Basin.
Account Type(s):
Expense
Contract Start Date:
04/01/2009
Contract End Date:
03/31/2010
Current Contract Value:
$239,137
Expenditures:
$239,137

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Ensure environmental compliance requirements are complete A: 165. Complete environmental compliance requirements 03/31/2010 03/31/2010
PIT Tag detection system at Okanagan River Vertical Control Structure B: 70. Install PIT tag detection at Okanagan River Vertical Control Structure 03/31/2010 03/31/2010
Evaluation of the feasibility of installing a PIT tag detection system at McIntyre Dam C: 70. Evaluate feasibility of installing PIT tag detection at McIntyre Dam 01/29/2010 03/31/2010
Install an acoustic network in the Okanogan Basin D: 70. Install Okanogan River Acoustic Network 07/01/2009 07/07/2009
Wells Dam acoustic tagging E: 158. Acoustic tag adults at Wells Dam East Bank Adult trap 07/31/2009 07/20/2009
Collect acoustic tag data F: 157. Collect acoustic tag data 10/31/2009 10/31/2009
Sockeye migration mortality and timing analysis G: 162. Sockeye migration mortality and timing 02/01/2010 03/31/2010
Osoyoos Lake and Lake Wenatchee smolt abundance data H: 157. Collect smolt abundance data from acoustic trawl surveys 03/31/2010 03/31/2010
Over-winter smolt abundance of Okanagan and Wenatchee sockeye salmon I: 162. Compare Wenatchee and Osoyoos Lake hydroacoustic data 03/31/2010 03/31/2010
Report results J: 161. Share project information 03/31/2010
Wenatchee stock assessment plan K: 174. Wenatchee stock assessment plan 03/31/2010 03/31/2010
Sockeye Symposium L: 99. AFS sockeye symposium 03/31/2010 03/31/2010
Complete all project management and administrative activities for the project O: 119. Project administration 03/31/2010 03/31/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sockeye (O. nerka) - Lake Wenatchee ESU
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Sockeye (O. nerka) - Okanogan River ESU
  • 3 instances of WE 70 Install Fish Monitoring Equipment
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete environmental compliance requirements 02/09/2007
B 70 Install PIT tag detection at Okanagan River Vertical Control Structure 02/09/2007
C 70 Evaluate feasibility of installing PIT tag detection at McIntyre Dam 02/09/2007
D 70 Install Okanogan River Acoustic Network 02/13/2009
E 158 Acoustic tag adults at Wells Dam East Bank Adult trap 02/09/2007
F 157 Collect acoustic tag data 02/09/2007
G 162 Sockeye migration mortality and timing 02/09/2007
H 157 Collect smolt abundance data from acoustic trawl surveys 01/12/2010
I 162 Compare Wenatchee and Osoyoos Lake hydroacoustic data 02/09/2007
J 161 Share project information 02/09/2007
K 174 Wenatchee stock assessment plan 02/09/2007
L 99 AFS sockeye symposium 02/09/2007
M 132 Submit Progress Report for the period Apr 2009 to Mar 2009 02/09/2007
N 185 Periodic Status Reports for BPA 02/09/2007
O 119 Project administration 02/09/2007