SOW Report
Contract 41723: 2003-017-00 EXP ISEMP/CASCADIA CD WENATCHEE R. COORD/DATA COLLECT
Project Number:
Title:
Integrated Status and Effectiveness Monitoring Program (ISEMP)
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
41723
Contract Title:
2003-017-00 EXP ISEMP/CASCADIA CD WENATCHEE R. COORD/DATA COLLECT
Contract Continuation:
Previous: Next:
36719: 2003-017-00 EXP ISEMP/CASCADIA CD WENATCHEE R. COORD/DATA COLLECT
  • 46464: 2003-017-00 EXP ISEMP - CASCADIA CONS. DIST/COORD & DATA COLLECT
Contract Status:
Closed
Contract Description:
Water Quality Monitoring, Habitat Survey Assistance and Coordination in the Wenatchee and Entiat River Subbasins

AMENDMENT
This contract was amended to include funding support for a new position at the Cascadia Conservation District which is essential to the successful implementation of the Entiat Intensively Monitored Watershed (IMW).  The Entiat IMW is called for under the 2008 BiOp RPA 57.1 and seeks to determine whether a suite of instream habitat actions designed to improve habitat for listed salmonids and steelhead are effective.  The ISEMP has designed an implementation and monitoring experimental design for the Entiat IMW that calls for habitat restoration actions to be implemented in a spatially and temporally explicit manner.  This approach to action implementation and monitoring will require significant coordination, facilitation and support for the many agencies and stakeholders involved in restoring the Entiat River and the need for a person to head up this coordination effort was recognized by all those involved.  It was agreed that such a position should be housed at the CCD, with support from multiple agencies involved in the Entiat IMW, including the U.S. Bureau of Reclamation, Bonneville Environmental Foundation, and the ISEMP.  ISEMP will help support this position in FY2009 with $24,000.

This contract is one of several contracts that will implement this project.  The FINAL REPORT for this contract will contain data that will 1) be submitted to NOAA FISHERIES (also a contractor under this project) and 2) be submitted to BPA as a contract final report according to the terms of this contract.

This contract will support the overall project in the following manner:

The Cascadia Conservation District (CCD) collects water quality data (temperature, dissolved oxygen, turbidity, pH, conductivity, and nutrients) at five locations in the Wenatchee River subbasin.  The objective of the data will be to track changes that result from implementing other projects intended to benefit fish and wildlife species.   In addition to collecting water quality data, the District offers support to other agencies as part of the larger project in the form of landowner coordination and agency coordination.  Specifically, the District coordinates outreach to private landowners, and facilitates landowners and cooperating agencies getting the appropriate information based on the needs of each entity (agency or private landowners).  For landowner coordination during habitat and snorkel surveys, private sites on the list are identified and appropriate landowners along these sections of stream are contacted by the District to ensure agency staff access will be possible and allowed by the landowner.  The purpose of the survey is explained to the landowner and permission to access the stream at specific locations is requested. A database is developed for the survey and maps are created of each site for the appropriate agency conducting the survey.  The District serves as the contact point for questions from landowners about the purpose of the survey and for any special requirements specific landowners may have for agency staff to be aware of during the visit to a private site.  The work under this contract is coordinated through Terraqua, Inc. and NOAA Fisheries, entities that also implement actions under this project.
Account Type(s):
Expense
Contract Start Date:
03/01/2009
Contract End Date:
02/28/2010
Current Contract Value:
$76,862
Expenditures:
$76,862

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
David Byrnes Bonneville Power Administration Yes COR dmbyrnes@bpa.gov (503) 230-3171
Israel Duran Bonneville Power Administration No Env. Compliance Lead induran@bpa.gov (503) 230-3967
Peggy Entzel Cascadia Conservation District No Supervisor peggye@cascadiacd.org (509) 436-1601
Chris Jordan National Oceanic and Atmospheric Administration Yes Technical Contact chris.jordan@noaa.gov (541) 754-4629
Kate Koenig Cascadia Conservation District Yes Technical Contact kate.koenig@wa.nacdnet.net (509) 664-9355
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Pamela Nelle Terraqua, Inc. Yes Administrative Contact pamela@terraqua.biz (509) 885-8143
Michael Rickel Cascadia Conservation District Yes Contract Manager miker@cascadiacd.org (509) 436-1601x103
Sarah Rudback Cascadia Conservation District Yes Technical Contact sarah.rudback@wa.nacdnet.net (509) 664-0274
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Carol (VC) Volk Volk Consulting Yes Interested Party volkconsulting@gmail.com (206) 240-0301
Michael Ward Terraqua, Inc. Yes Interested Party mike@terraqua.biz (509) 486-2426
Nancy Weintraub Bonneville Power Administration No Interested Party nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance A: 165. Environmental Compliance 04/01/2009 04/01/2009
Operate and maintain Hydrolabs. B: 157. Water Quality Data collection in the Wenatchee watershed 02/28/2010 02/28/2010
Submit quality controlled water quality data to Upper Columbia Data Steward C: 161. RM&E Data Management 02/28/2010 02/28/2010
Communicate Coordination of Entiat habitat restoration project monitoring D: 157. Entiat habitat restoration project monitoring 02/28/2010 02/28/2010
Summary list of all survey sites identified E: 157. Habitat Survey Outreach 10/28/2009 09/30/2009
Site coordination and outreach products F: 157. Interagency coordination and outreach 02/28/2010 02/28/2010
SOW, reports and documents to maintain contract G: 119. CCD Integrated Status & Effectiveness Monitoring 02/28/2010 02/28/2010
Final (annual) report to NOAA Fisheries and BPA H: 132. Submit CCD final (annual) report for the period of performance 02/28/2010 02/28/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 02/09/2007
B 157 Water Quality Data collection in the Wenatchee watershed 01/31/2009
C 161 RM&E Data Management 02/09/2007
D 157 Entiat habitat restoration project monitoring 02/09/2007
E 157 Habitat Survey Outreach 02/09/2007
F 157 Interagency coordination and outreach 02/09/2007
G 119 CCD Integrated Status & Effectiveness Monitoring 02/09/2007
H 132 Submit CCD final (annual) report for the period of performance 02/09/2007
I 185 Periodic Status Reports for BPA 02/09/2007