SOW Report
Contract 41895: 2003-013-00 EXP GRAYS RIVER WATERSHED ASSESS (CREST)
Project Number:
Title:
Grays River Watershed Assessment
Stage:
Closed
Area:
Province Subbasin %
Columbia River Estuary Grays 100.00%
Contract Number:
41895
Contract Title:
2003-013-00 EXP GRAYS RIVER WATERSHED ASSESS (CREST)
Contract Continuation:
Previous: Next:
36924: 2003-013-00 EXP GRAYS RIVER WATERSED ASSESS (CREST)
Contract Status:
History
Contract Description:
The Columbia River Estuary Task Force (CREST) is collaborating with the Pacific Northwest National Laboratory (PNNL) on implementation of the Grays River Restoration Project (BPA Project 200301300).  The Grays River is vitally important to the recovery of Lower Columbia River (LCR) chum salmon because it currently has the most viable population remaining in the LCR region.  The Grays River watershed is also important to the recovery of salmon and steelhead in the LCR ecosystem.  Today, numbers of naturally spawning salmon and steelhead have declined to levels far below historical numbers because of habitat limiting factors that include but are not limited to the lack of habitat connectivity, diversity, channel stability, riparian function and altered stream flow conditions.  The objective of this project is to restore habitat-forming processes to enhance salmon and steelhead populations in the Grays River, following recommendations developed during the FY04-06 BPA-sponsored Grays River Watershed Assessment (BPA Project # 2003-013-00).  Specifically, this project will be the first step in restoring channel structure and function that will increase instream habitat diversity, channel stability, and riparian integrity in the critical response reach upstream and adjacent to critical salmon spawning areas of the Grays River.  The major component of this strategy is the planning, design, installation, and monitoring of engineering modifications to the channel (including the potential use of engineered logjams (ELJ)) that will rejuvenate historic channel and floodplain processes.  Additional restoration measures include reforesting the riparian corridor to enhance future large woody debris recruitment and investigation of conservation activities within ecologically critical areas.  These activities include land acquisition and levee removal to protect critical areas and reconnect floodplain areas.  Finally, monitoring integrated with restoration activities is proposed to evaluate restoration effectiveness and allow for adaptive management of future restoration treatments in the project area as well as other degraded watersheds in the Lower Columbia River.

The scope of work for the FY09 year will include finalization of design and beginning of the implementation phase. The fiscal period's implementation will include in-water and floodplain structures intended to increase habitat, roughness, and refuge as well as other listed habitat enhancements for salmonids during high and low flows.
Account Type(s):
Expense
Contract Start Date:
05/15/2009
Contract End Date:
05/14/2010
Current Contract Value:
$336,808
Expenditures:
$336,808

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance complete for on-the-ground work B: 165. Complete necessary in-stream regulatory permitting & other EC 09/01/2009 07/16/2009
Funding Package - Submit draft to COTR C: 119. Project Management and Coordination 05/14/2010 05/14/2010
Watershed/Floodplain Education D: 99. Community Education and Involvement 05/14/2010 05/14/2010
Final Design Documents and As-Built E: 175. Construction Engineering Oversight 02/16/2010 09/30/2009
Seven (7) Instream Structures F: 29. Increase instream salmon habitat quality and complexity 10/30/2009 08/31/2009
Promote Channel Migration in Morphologically Preferred Area G: 30. Promote Channel Migration in Morphologically Preferred Area 10/30/2009 08/31/2009
Final report uploaded to Pisces H: 132. Submit Annual Report for the period (5-15-09) to (5-14-10) 05/01/2010 05/14/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 175 Produce Design
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 175 Produce Design
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 175 Produce Design
Cutthroat Trout, Coastal (O. c. clarkii) - Southwest Washington/Columbia River ESU
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 165 Complete necessary in-stream regulatory permitting & other EC 02/09/2007
C 119 Project Management and Coordination 02/09/2007
D 99 Community Education and Involvement 02/09/2007
E 175 Construction Engineering Oversight 03/23/2009
F 29 Increase instream salmon habitat quality and complexity 06/25/2009
G 30 Promote Channel Migration in Morphologically Preferred Area 06/25/2009
H 132 Submit Annual Report for the period (5-15-09) to (5-14-10) 02/09/2007