Contract 42421: 200711200 EXP TEANAWAY R. RIPARIAN ENHANC. AT JACK & INDIAN CK
Project Number:
Title:
Teanaway River Watershed Protection
Stage:
Closed
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
42421
Contract Title:
200711200 EXP TEANAWAY R. RIPARIAN ENHANC. AT JACK & INDIAN CK
Contract Continuation:
Previous: Next:
n/a
Contract Status:
History
Contract Description:
The Teanaway River Watershed Protection Project includes work to improve in-stream and riparian habitat, particularly in the North Fork Teanaway  River watershed.  Barrier removal projects are being conducted with the assistance of other programs and funding sources on two left bank tributaries of the North Fork, Jack Creek and Indian Creek. Both creeks intersect the NF Teanaway Road and the culverts at each of those intersections are barriers to fish passage because they are perched above the streambed significantly.   They will be replaced with three-sided box culvert (Jack Creek) and a pipe arch culvert (Indian Creek). Access will be provided to nearly 9 miles of habitat for salmonids including Steelhead, Spring Chinook, Coho, and Bull Trout. In conjunction with barrier removal, riparian habitat will be improved on 0.1 acres and six large woody debris structures will be installed, along with habitat boulders to improve in-stream habitat complexity.
The matching funds for construction include $534,000 from the Salmon Recovery Funding Board, $150,000 from the Western Federal Lands Highway Division, and $18,000 from the USFWS Partnership funds.  The final bid package is complete, as this project was bid in June 2008 however all bids were rejected due to lack of funds.  Certainty of success for a re-bid of the project, and construction in 2009, will be enabled by a $275,000 infusion from the Teanaway  River Watershed Project (200711200), as itemized in the attached Revised Line Item Budget (1/27/09).

The Jack Creek and Indian Creek culvert replacement projects came in under budget, leaving remaining funds.  On the mainstem Teanaway River, due to the January 2009 flood event, the grade control structures associated with two pump stations (Red Bridge Road and Lambert Road) were severely damaged. Work is underway with multiple stakeholders to assist the irrigators with repairs at these sites that allow for fish passage as well as diversion of irrigation water. KCCD used local funds to complete conceptual designs and conduct a meeting with the irrigators and other stakeholders in March 2010. All efforts are now focused on construction during the 2010 summer months.  Matching funds will be necessary for construction to occur.

CCR 21325 Update - For the Red and Lambert Bridge passage fixes, matching funding for implementation fell through.  Also, alternative design concepts have been suggested and need to be reviewed. Therefore, this contract is being extended through November 2011.  This will allow the design issues to be resolved and allow resources - including other cost share funds and USBR in-kind services - to be coordinated for a summer 2011 construction season.
Account Type(s):
Expense
Contract Start Date:
02/25/2009
Contract End Date:
09/30/2012
Current Contract Value:
$213,319
Expenditures:
$213,319

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Dawn Boorse Bonneville Power Administration No Env. Compliance Lead drboorse@bpa.gov (503) 230-5678
David Gerth Kittitas Conservation Trust Yes Supervisor kct@inlandnet.com (509) 649-2951
Anna Lael Kittitas County Conservation District Yes Contract Manager anna.lael@kccd.net (509) 925-3352x7
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jay Marcotte Bonneville Power Administration Yes COR jgmarcotte@bpa.gov (503) 230-3943
Sherry Swanson Kittitas County Conservation District Yes Administrative Contact sherry-swanson@conservewa.net (509) 925-3352x6
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Managed Project - B: 119. Manage Project 02/25/2009 02/25/2009
Attach Progress Report in Pisces C: 132. Submit Progress Report for the period March 1, 2009 to September 30, 2009 07/15/2009 09/30/2009
Habitat Features Installed D: 29. Jack Creek - LWD and Boulders 08/31/2009 09/04/2009
Habitat Features Installed E: 29. Indian Creek - LWD and Boulders 09/15/2009 09/24/2009
Replace Jack Creek Culvert F: 184. Jack Creek Culvert Replacement 09/15/2009 09/04/2009
Replace Indian Creek Culvert G: 184. Indian Creek Culvert Replacement 09/30/2009 09/24/2009
Trees and shrubs installed H: 47. Jack Creek and Indian Creek- Plant Vegetation 12/18/2009 12/18/2009
Final Drawings and Specifications I: 175. Final drawings and specs for Red and Lambert Bridge projects 08/31/2012
Rock Weirs and Rock Barbs J: 186. Repair grade controls at Red and Lambert bridges 09/28/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 119 Manage Project 02/09/2007
C 132 Submit Progress Report for the period March 1, 2009 to September 30, 2009 02/09/2007
D 29 Jack Creek - LWD and Boulders 04/03/2008
E 29 Indian Creek - LWD and Boulders 04/03/2008
F 184 Jack Creek Culvert Replacement 04/03/2008
G 184 Indian Creek Culvert Replacement 04/03/2008
H 47 Jack Creek and Indian Creek- Plant Vegetation 04/03/2008
I 175 Final drawings and specs for Red and Lambert Bridge projects 02/25/2009
J 186 Repair grade controls at Red and Lambert bridges