Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 44456: 200301200 EXP PROTECT SHILLAPOO WILDLIFE AREA
Project Number:
Title:
Shillapoo Wildlife Mitigation
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Lower Columbia Columbia Lower 100.00%
Contract Number:
44456
Contract Title:
200301200 EXP PROTECT SHILLAPOO WILDLIFE AREA
Contract Continuation:
Previous: Next:
39620: 200301200 EXP PROTECT SHILLAPOO WILDLIFE AREA
  • 50061: 2003-012-00 EXP PROTECT SHILLAPOO WILDLIFE AREA
Contract Status:
Closed
Contract Description:
The Shillapoo Wildlife Area (SWA) was initially approved as a BPA wildlife mitigation project in 1996 and was re-approved for funding in 2002 as part of the Northwest Power Planning Council's (NWPPC) Provincial/Sub-Basin Planning Process.  This project is located in the Lower Columbia Province (Lake River Sub-Basin) and partially addresses wildlife losses due to adverse impacts caused by construction of Bonneville, The Dalles and John Day dams.  Land acquisition and management programs to meet mitigation objectives have been under way since 1996 on the SWA.  Continued operation, maintenance and enhancement activities funded by BPA are necessary to maintain and enhance wildlife habitat benefits and to ensure BPA's mitigation obligation is met.

Ongoing Maintenance and enhancement work includes restoration of approximately 650 acres of wetland plant communities within the drained Shillapoo Lakebed and management/enhancement of other smaller wetland basins throughout the wildlife area. This primary enhancement focus is envisioned to provide wintering habitat for Canada geese, other waterfowl and sandhill cranes while increasing the overall habitat and wildlife diversity in the area.

Tree and shrub planting will occur along approximately 1 3/4 miles of riparian zone on the west bank of Lake River and in other areas to restore or improve riparian habitat.  Some of these areas require that exotic vegetation (usually Himalayan Blackberry) be removed prior to planting making these projects multiple year endeavors.  Tree planting will also occur in selected wetland and Oak habitat to improve habitat conditions for indicator species including Great Blue Heron, Yellow Warbler, mink and other species.

Other ongoing maintenance activities include fence maintenance, noxious weed and brush control, and waterfowl forage improvements much of which is accomplished largely though agreements with cooperating farmers.  Water levels are also managed and moist soil management practices are employed in wetland basins where enhancement has occurred to reduce reed canary grass cover in order to create favorable conditions for native plants.
Account Type(s):
Expense
Contract Start Date:
10/01/2009
Contract End Date:
09/30/2010
Current Contract Value:
$205,954
Expenditures:
$205,954

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Completed Surveys and Consultation A: 165. Environmental Reviews and/or Consultation 09/30/2010 09/30/2010
North Unit Cells (2) restored B: 181. Shillapoo Lake North Impoundments 09/30/2010
Seeded Pasture C: 22. Rehabilitate or Overseed Pasture 06/01/2010 05/07/2010
Mowed pastures and planted cover crops D: 22. Goose Forage Management 09/30/2010 09/30/2010
Maintained plants E: 22. Maintain Planted Trees and Shrubs 09/30/2010 09/30/2010
Disked Basins F: 53. Moist Soil Management 09/30/2010 09/30/2010
Weeds Controlled G: 53. Control Noxious Weeds and Other Undesirable Plants 09/30/2010 09/30/2010
Site Cleared H: 53. Buckmire Slough Site Prep/Clearing 09/30/2010 09/30/2010
Completed Fence I: 40. North Basin Fence 09/30/2010
Completed Fence J: 40. Lake River Fence 09/30/2010
Completed Fence K: 40. "Old Slough" Fence 09/30/2010
Trees Planted L: 47. North Unit old ag site (Oak habitat) 05/30/2010 03/15/2010
Trees Planted as needed M: 47. South Unit (old rookery site) 04/30/2010 03/15/2010
Trees and Shrubs Planted N: 47. Lake River Riparian Zone 04/30/2010 03/15/2010
Trees Planted O: 47. South Unit (Buckmire Slough) 04/30/2010
Clear Travel Routes P: 38. Improve Interior Roads and Travel Routes in Support of Other Activities 09/30/2010 09/30/2010
Maintained Water Management Structures Q: 186. Operate and Maintain Wetland Management Facilities (including pumps) 09/30/2010 09/30/2010
Fences Maintained R: 186. Maintain, Repair or Replace Existing Fences as Needed for Management Purposes 09/30/2010 09/30/2010
Debris Removed S: 27. Remove Debris, Litter and Other Materials as Required 09/30/2010 09/30/2010
Monitoring Information and Data Gathered T: 157. Habitat Monitoring, and Photo-Point Documentation 09/30/2010
Waterfowl surveys conducted U: 157. Monitor Waterfowl Use associated with habitat treatments 04/15/2010 04/15/2010
Habitat Data and treatment information compiled V: 162. Compile and summarize wetland plant community data 09/30/2010 09/30/2010
Waterfowl Use Data Compiled W: 162. Compile and Summarize Waterfowl Use Data 08/30/2010
Use Monitored/Managed X: 188. Monitor and Manage Public and Other Uses 09/30/2010 09/30/2010
Construction Completed Y: 98. Storage Building 09/30/2010
Administrative Tasks/Required Training Completed Z: 119. Conduct Administrative Activities to Operate, Enhance and Maintain Shillapoo Wildlife Area 09/30/2010 09/30/2010
Management Plan Update Completed AA: 174. Management Plan Update 05/30/2010 05/30/2010
Attach Progress Report in Pisces AC: 132. Submit Progress Report for the period Oct 2009 to Sep 2010 09/30/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 3 instances of WE 22 Maintain Vegetation
  • 1 instance of WE 27 Remove Debris
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 38 Improve Road for Instream Habitat Benefits
  • 3 instances of WE 40 Install Fence
  • 4 instances of WE 47 Plant Vegetation
  • 3 instances of WE 53 Remove Vegetation
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 98 Other
  • 1 instance of WE 174 Produce Plan
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Reviews and/or Consultation 02/09/2007
B 181 Shillapoo Lake North Impoundments 02/09/2007
C 22 Rehabilitate or Overseed Pasture 08/17/2009
D 22 Goose Forage Management 08/17/2009
E 22 Maintain Planted Trees and Shrubs 08/17/2009
F 53 Moist Soil Management 11/30/2009
G 53 Control Noxious Weeds and Other Undesirable Plants 11/30/2009
H 53 Buckmire Slough Site Prep/Clearing 02/15/2010
I 40 North Basin Fence 08/17/2009
J 40 Lake River Fence 10/15/2009
K 40 "Old Slough" Fence 08/17/2009
L 47 North Unit old ag site (Oak habitat) 08/17/2009
M 47 South Unit (old rookery site) 08/17/2009
N 47 Lake River Riparian Zone 08/17/2009
O 47 South Unit (Buckmire Slough) 02/15/2010
P 38 Improve Interior Roads and Travel Routes in Support of Other Activities 08/17/2009
Q 186 Operate and Maintain Wetland Management Facilities (including pumps) 11/30/2009
R 186 Maintain, Repair or Replace Existing Fences as Needed for Management Purposes 11/30/2009
S 27 Remove Debris, Litter and Other Materials as Required 08/17/2009
T 157 Habitat Monitoring, and Photo-Point Documentation 04/18/2007
U 157 Monitor Waterfowl Use associated with habitat treatments 02/09/2007
V 162 Compile and summarize wetland plant community data 02/09/2007
W 162 Compile and Summarize Waterfowl Use Data 02/09/2007
X 188 Monitor and Manage Public and Other Uses 02/09/2007
Y 98 Storage Building 10/01/2009
Z 119 Conduct Administrative Activities to Operate, Enhance and Maintain Shillapoo Wildlife Area 02/09/2007
AA 174 Management Plan Update 02/09/2007
AB 185 Periodic Status Reports for BPA 02/09/2007
AC 132 Submit Progress Report for the period Oct 2009 to Sep 2010 02/09/2007