Contract 47427: 2009-001-00 EXP ACCORD EXPANDED MULTI-SPECIES ACCLIMATION
Project Number:
Title:
Upper Columbia Spring Chinook and Steelhead Acclimation
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Columbia Cascade Methow 50.00%
Wenatchee 50.00%
Contract Number:
47427
Contract Title:
2009-001-00 EXP ACCORD EXPANDED MULTI-SPECIES ACCLIMATION
Contract Continuation:
Previous: Next:
41799: 2009-001-00 EXP EXPAND MULTI-SPECIES ACCLIMATION WENATCHEE/METHOW
  • 51636: 2009-001-00 EXP EXPANDED MULTI-SPECIES ACCLIMATION
Contract Status:
Closed
Contract Description:
This acclimation project proposes to further develop acclimation for upper Columbia steelhead and spring Chinook by developing new semi-natural ponds similar to what has been uniquely successful in the Mid-Columbia Coho Restoration Project (BPA Project #19-96-04000).  This would involve utilizing the existing PUD/Federal mitigation production in the region that is currently doing either direct stream plants or single point, large releases and expand/refine those releases by adding additional acclimation releases in known habitat reaches within the Wenatchee and Methow watersheds.   This strategy will enhance the goals of recovery for these two listed stocks.

Since a comprehensive plan has already been complied through the efforts of YN staff and sub-contracted work from ANCHOR Environmental and been successfully accepted through the ISRP/NPCC processes, the FY10 contracting period will focus on preparing site(s) for on-the-ground operations as soon as the spring of 2011 in both the Methow and Wenatchee basins.  Primary objectives for this project in 2010-2011 is to beginning implementing steelhead acclimation at Rohlfing's Pond in the Wenatchee Basin as well as design, construct and acclimate spring Chinook within the Twisp River at Lincoln's Pond in the Methow Basin.  YN will continue with various field studies and site data collection, if not already completed, to determine if potential, identified rearing sites will have the ability to rear these species of concern and at what level.  Management throughout this whole process will be key in implementation.
Account Type(s):
Expense
Contract Start Date:
05/01/2010
Contract End Date:
01/31/2011
Current Contract Value:
$129,091
Expenditures:
$129,091

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Bruce Hollen Bonneville Power Administration No Interested Party bahollen@bpa.gov (503) 230-5756
Tana Hoptowit Yakama Confederated Tribes No hopt@yakamafish-nsn.gov (509) 865-5121x6318
Cory Kamphaus Yakama Confederated Tribes Yes Technical Contact kamc@yakamafish-nsn.gov (509) 548-9413x102
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Keely Murdoch Yakama Confederated Tribes Yes Technical Contact murk@yakamafish-nsn.gov (509) 548-2206
Thomas Scribner Yakama Confederated Tribes Yes Contract Manager scrt@yakamafish-nsn.gov (503) 331-9850
Paul Ward Yakama Confederated Tribes No Supervisor warp@yakamafish-nsn.gov (509) 949-4129
Lisa Wright Bonneville Power Administration Yes Env. Compliance Lead lswright@bpa.gov (503) 230-4047


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Final Site List compliance for acclimation B: 165. Final site list compliance for acclimation 01/31/2011 01/31/2011
Data Collection and Analysis C: 157. Collect Water Quality Data 01/31/2011 01/31/2011
Funding Package - Submit draft to COTR D: 119. Manage Expanded Acclimation Project 11/01/2010 11/01/2010
Stakeholder Coordination E: 191. Coordination of Plan with Regional Stakeholders 01/31/2011 01/31/2011
Annual comprehensive report to cover activities from 3/1/09 to 12/31/10 F: 132. Progress report delivering accomplishments through the CY09 01/31/2011
Develop/expansion of a acclimation pond G: 35. Develop a pond within the Methow basin on the Twisp River-Lincoln Pond 11/01/2010 11/01/2010
PIT tag spring Chinook and/or steelhead H: 158. tag up to 30K steelhead and/or spring Chinook in the Wenatchee and Methow basins 01/31/2011 12/20/2010
acclimate spring Chinook and/or steelhead I: 56. potentially acclimate spring Chinook or steelhead within this contract period 01/31/2011
well installed at Lincoln Pond J: 171. Production well installed at Lincoln Pond 09/01/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 56 Acclimate Juvenile Fish
  • 1 instance of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 35 Develop Pond
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 05/01/2010
B 165 Final site list compliance for acclimation 05/01/2010
C 157 Collect Water Quality Data 05/01/2010
D 119 Manage Expanded Acclimation Project 05/01/2010
E 191 Coordination of Plan with Regional Stakeholders 05/01/2010
F 132 Progress report delivering accomplishments through the CY09 05/01/2010
G 35 Develop a pond within the Methow basin on the Twisp River-Lincoln Pond
H 158 tag up to 30K steelhead and/or spring Chinook in the Wenatchee and Methow basins
I 56 potentially acclimate spring Chinook or steelhead within this contract period
J 171 Production well installed at Lincoln Pond