Contract 47609: 200811100 EXP TWIN LAKES ENHANCEMENT
Project Number:
Title:
Twin Lakes Enhancement
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Intermountain Columbia Upper 100.00%
Contract Number:
47609
Contract Title:
200811100 EXP TWIN LAKES ENHANCEMENT
Contract Continuation:
Previous: Next:
n/a
  • 52300: 2008-111-00 EXP TWIN LAKES ENHANCEMENT
Contract Status:
History
Contract Description:
North and South Twin Lakes suffer from poor growth and high mortality of stocked salmonids.  As a result of five years of study it was determined that the primary problem was that trout were limited to a narrow band of water during summer stratification because water temperatures in the epilimnion were too high and the hypolimnion was anoxic.  In 2008 a hypolimnetic oxygenation system was installed in North Twin and operated briefly.  In 2009 the oxygenation system was operated from mid May to Mid October.  Dissolved oxygen levels in the hypolimnion were kept between 5mg/l and 7mg/l.  Fish movements were monitored in both North Twin (oxygenated) and South Twin (unoxygenated as a control) throughout the summer by acoustic tracking, hydroacoustics and gill nets.  Fish were found to utilize the hypolimnion in North Twin but not in South Twin.

This project expands upon the initial study.  In 2010 North Twin Lake will again be oxygenated and South Twin will remain unoxygenated and used as a control.  Oxygen levels will be continually monitored in both lakes throughout the summer.  Numerous other water quality parameters will be measured in both lakes and fish movements, growth, condition factors and mortality will be tracked.

A hypolimnetic water oxygenation system will be constructed and tested in South Twin but it will only be operated long enough to ensure that it is working properly.  The oxygenation systems in both North and South Twin Lakes will be operated throughout the water stratification period in both lakes in 2011.
Account Type(s):
Expense
Contract Start Date:
04/01/2010
Contract End Date:
03/31/2011
Current Contract Value:
$517,602
Expenditures:
$517,602

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Produce environmental compliance documentation A: 165. Produce environmental compliance 04/01/2010 04/01/2010
Purchase liquid oxygen and inject into the hypolimnion of North Twin Lakwe B: 98. Purchase oxygen and inject into North Twin Lake 10/15/2010 10/15/2010
Construct and install South Twin Lake hypolimnetic oxygenation system C: 98. Construct hypolimnetic oxygenation system in South Twin Lake 10/30/2010 09/30/2010
Water and sediment quality monitoring D: 157. Water Quality Monitoring 10/31/2010 10/31/2010
Monitor dissolved oxygen E: 157. Dissolved oxygen monitoring 03/31/2011 11/30/2010
Funding Package - Submit draft to COTR F: 119. Manage and administer project 01/01/2011 03/15/2011
Analysis of water quality, fish and invertebrate data. G: 162. Analyze and interpret data 03/31/2011 03/31/2011
Attach Progress Report in Pisces I: 132. Progress Report 03/31/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Interior Redband (O. mykiss gairdnerii)
  • 2 instances of WE 98 Other
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce environmental compliance 04/01/2010
B 98 Purchase oxygen and inject into North Twin Lake 04/01/2010
C 98 Construct hypolimnetic oxygenation system in South Twin Lake 04/01/2010
D 157 Water Quality Monitoring 04/01/2010
E 157 Dissolved oxygen monitoring 04/01/2010
F 119 Manage and administer project 04/01/2010
G 162 Analyze and interpret data 04/01/2010
H 185 Periodic Status Reports for BPA 04/01/2010
I 132 Progress Report 04/01/2010