Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 48256: 2010-034-00 EXP CCT-UPPER COLUMBIA - OKANOGAN- SPRING CHINOOK
Project Number:
Title:
Upper Columbia Spring Chinook and Steelhead Juvenile and Adult Abundance, Productivity and Spatial Structure Monitoring
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 5.00%
Methow 35.00%
Okanogan 25.00%
Wenatchee 35.00%
Contract Number:
48256
Contract Title:
2010-034-00 EXP CCT-UPPER COLUMBIA - OKANOGAN- SPRING CHINOOK
Contract Continuation:
Previous: Next:
n/a
  • 53112: 2010-034-00 EXP CCT-UPPER COLUMBIA - OKANOGAN - SPRING CHINOOK
Contract Status:
Closed
Contract Description:
This contract provides funding to expand BPA project # 2010-034-00 into the Okanogan subbasin to complete coverage of the entire Upper Columbia ESU for summer steelhead. The master project is part of a unique, well coordinated,  and standardized group of monitoring and evaluation program(s) that exist in the Upper Columbia River Basin.  Monitoring and evaluation programs are funded by a combination of  federal (BPA, BOR, USFWS), State, Tribal, and regional (PUDs) entities.  While all these various program contribute data to estimate VSP parameters for spring Chinook and summer steelhead, these programs also share common deficiencies related to precision and accuracy of the abundance estimates.  Existing M & E activities combined with recent advances in PIT tag technology provide an opportunity to improve the quality of the data generated in order to make proper management decisions concerning ESA listed species.  The overall objectives of the project are to: 1) evaluate precision and accuracy of the smolt monitoring methodology for both steelhead and spring Chinook , 2) estimate the proportion of hatchery steelhead in each primary population, 3) estimate the precision of redd counts for both steelhead and spring Chinook and 4) evaluate the accuracy of the steelhead spawning ground survey design.  We also intend to conduct a steelhead radio telemetry study to independently validate estimates generated from PIT tags and to estimate steelhead population characteristics (overwinter survival, number of redds per female).  These tasks address in part or fully the critical uncertainties identified under Supplementation in the Columbia River Basin Research Plan (2006-03) and steelhead population characteristics (abundance, productivity, and ratio of hatchery fish) under the Fish and Wildlife Program.  Additionally, all of the studies in this proposal are directly consistent with RPAs for the FCRPS BiOp.  In summary, this project seeks to build on the existing programs in all the subbasins and provide information and equipment needed for long term monitoring of VSP parameters with a known level of accuracy and precision. This contract will allow for inclusion of the Okanogan subbasins summer steelhead population to be a part of the relevant parts this experiment i.e. PITtag array deployment and development of precision and accuracy estimates, hatchery estimates, and enhanced age data collection.

WDFW will be the research lead for the project and obtain all necessary environmental compliance permits for the project which includes CR-142326. Andrew Murdoch will be the point of contact for WDFW.  Colville Confederated Tribes (CCT) will be the primary contractor for the Okanogan Basin; CR-142326.  John Arterburn is the point of contact for the CCT.

During the 2010 contract period we plan to accomplish the following tasks; 1) work with landowners to secure agreements to place PIT-tag arrays on private property to locate detection sites at the downstream extent of each sub-watershed, 2) Survey these properties and assess the best location for each PIT-tag array to be installed, 3) Install both permanent and temporary arrays prior to summer steelhead spawning activity (March) in 2011 and remove the temporary arrays once data collection has been completed, 4) Upload data to the PITAGIS database and trouble shoot these arrays to assure continuous data flow when operating, 5) Collect and assess critical age and origin data on upper Columbia summer steelhead.

WDFW will be the research lead for the project and will obtain all necessary environmental compliance permits under CR-136226 for the project which includes CR-142326. Andrew Murdoch will be the point of contact for WDFW.  Colville Confederated Tribes (CCT) will be the primary contractor for the Okanogan Basin.  John Arterburn is the point of contact for the CCT.
Account Type(s):
Expense
Contract Start Date:
07/01/2010
Contract End Date:
06/30/2011
Current Contract Value:
$85,521
Expenditures:
$85,521

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance documents provided under CR-136226 A: 165. E. compliance documents for this project provided under CR-136226 07/01/2010 07/01/2010
Project managed. Draft contracting package including SOW, LIB, & PI submitted to COTR B: 119. Manage and administer project 06/30/2011 06/30/2011
Conducted site specific assessments and developed landowner agreements C: 114. Conduct site specific assessments and develop landowner agreements 06/30/2011 06/30/2011
Aided WDFW in the installation of permanent PIT tag arrays D: 70. Aid WDFW in the installation of permanent in-stream PIT tag arrays in preselected locations 06/30/2011 06/30/2011
PIT tag recapture data uploaded E: 159. Upload PIT tag data to PTAGIS database 06/30/2011
Number and age of hatchery and wild steelhead based upon PIT tag detections estimated F: 162. Estimate the number and age of hatchery and wild steelhead 06/30/2011
Installed, operated, and removed temporary PIT tag antennas G: 70. Install temporary PIT tag arrays in preselected locations 06/30/2011 04/30/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 E. compliance documents for this project provided under CR-136226 07/01/2010
B 119 Manage and administer project 07/01/2010
C 114 Conduct site specific assessments and develop landowner agreements 07/01/2010
D 70 Aid WDFW in the installation of permanent in-stream PIT tag arrays in preselected locations 07/01/2010
E 159 Upload PIT tag data to PTAGIS database 07/01/2010
F 162 Estimate the number and age of hatchery and wild steelhead 07/01/2010
G 70 Install temporary PIT tag arrays in preselected locations 07/01/2010
H 185 Periodic Status Reports for BPA 07/01/2010
I 132 Submit Progress Report for the period (July 2010) to (June 2011) 07/01/2010