Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 48620: 2007-249-00 EXP EVAL OF LIVE CAPTURE GEAR
Project Number:
Title:
Evaluation of Live Capture Gear
Stage:
Closed
Area:
Province Subbasin %
Columbia Cascade Okanogan 40.00%
Mainstem - 60.00%
Contract Number:
48620
Contract Title:
2007-249-00 EXP EVAL OF LIVE CAPTURE GEAR
Contract Continuation:
Previous: Next:
42689: 2007-249-00 EXP EVAL OF LIVE CAPTURE GEAR
Contract Status:
History
Contract Description:
This contract is designed to protect at-risk salmon stocks from ESA listing while simultaneously strengthening the Tribes' ability to successfully harvest and process hatchery-origin salmon for consumption by the Tribal membership.  

Selective harvest gear types were tested and evaluated during the summer and fall of both 2008 and 2009, at sites where they could be effectively operated, and where additional information collected during the assessment (e.g., public input, on-site operational assessments, literature) supported or detracted from their potential use.  Evaluation of these gears continues in 2010.  

1. Purse seine.  A commercial sized vessel outfitted with the appropriate seine, brailing system, and holding tanks was used successfully in 2009 and the Tribes purchased the boat during the off-season.  This was proven to be a suitable method for use in the main-stem Columbia between Brewster and Chief Joseph Dam. This method could potentially capitalize upon fish schooling in the vicinity of the Okanogan River that are staging for ascent to the spawning grounds. Selective fishing using a purse seine operation has been tested by Fisheries and Oceans Canada and is gaining increased attention as an effective sorting process in weak stock fisheries. A lower Columbia River commercial fishing company (Kuller Fish Company) was contracted in 2008 and 2009  and fished successfully in the Wells Pool (Lake Pateros) near the Okanogan River confluence. This gear achieved both a high catch per unit effort (CPUE) of target species (Summer/Fall Chinook and sockeye salmon) and very high immediate release survival of non-target species (Natural-Origin Summer/Fall Chinook and NOR steelhead). This gear will be used again in 2010 with operations expanded to include broodstock collection, live-capture and release of ESA listed Spring Chinook and Steelhead (early Summer and late Fall).

2.             Tangle net.  This method continues to be investigated as a replacement for the gill nets currently used by independent Tribal fishermen.  Tangle nets can be used effectively in both the mainstem Columbia River and in the Okanogan River. They need constant attention in order to “hot pick” them, and their CPUE might be relatively low. Evaluation in 2008 resulted in fairly high CPUE when fished where fish are concentrated, but the immediate release mortality was much higher than in the beach seine and purse seine operations.

3. Beach seine. This method has proven to be an effective method for live capture, selective harvest for broodstock in the local area. The relatively high CPUE, low by-catch, site suitability, and ease of operation appear to fit the needs of the Colville Tribe.

4.             Weir. This method shows good potential as a method for live capture, selective harvest in the Okanogan near Chiliwist Creek (see Nass et al. 2006). Weirs are a common tool used in fisheries research, broodstock collection, and subsistence harvest. The ability to effectively capture live fish and release non-target fish with high post-release survival is certain though not without criticism. Design, engineering, feasibility and environmental compliance have been the focus in previous years and are continuing in 2010.  Significant cost share is being investigated for the future as the MOA funding is not adequate to fulfill all requirements for implementation.  

Next priority gears include hoop nets, dip nets, and pound nets.

5. Hoop/Dip nets (including deployment off of riverside platforms). Hoop nets and dip nets are presently used in the lower Columbia and tributaries in subsistence fisheries. They have the positive aspect of being used by individual fishermen in fish staging areas in proximity to a dam (e.g., In-Lieu/Fishing Access Sites used in Zone 6). Therefore, they need to be evaluated for use near Chief Joseph Dam. Other locations in the Okanogan River where fish are concentrated into narrow passage areas may also be suitable (e.g., Chiliwist Creek, McAllister and Janas rapids, McLaughlin Falls, below Enloe Dam). Land ownership, access and potential for scaffold construction will continue to be evaluated and these gears will be implemented where feasible.

6. Pound net.  This method shows good potential as a method for live capture, selective harvest in the Okanogan River. Successful establishment of pound nets or modified reef net gear could lead to an effective and continuous passive live capture, selective harvest gear for the Colville Tribes. However, detailed information regarding proper placement of this gear must be done to ensure that appropriate conditions are available,  Significant cost share is being investigated to offset the high cost of driving the pilings necessary for the installation of pound net gear.

Additionally, time and effort will be spent on creating the necessary infrastructure to safely handle fish at time of harvest and then store the fish for up to one year.  This will include renovation of the boat access at Mosquito Park for simplified loading of ice and offloading of fish from the purse seine vessel; purchase and installation of commercial ice machine(s), walk in freezer(s), and vacuum packaging equipment including all the necessary accessories at a newly renovated building for fish processing at the PSIS campus.   A $50,000 Tribal In-Kind cost share is being offered up by the Colville Business Council to show a monetary commitment by the Colville Tribes in furthering this project.  


The Colville Confederated Tribes are employing the following five principles in developing live-capture selective fishing strategies in the Upper Columbia River:

1) Selective harvest to protect species listed under the federal Endangered Species Act (ESA): Upper Columbia River Spring Chinook (Oncorhynchus tshawytscha) and Steelhead (Oncorhynchus mykiss). The Colville Confederated Tribes (CCT) intend to use selective harvest methods to protect salmon stocks listed under the federal Endangered Species Act (ESA) (i.e. Upper Columbia River Spring Chinook and Upper Columbia River steelhead), while providing harvest of un-listed species (Upper Columbia River Summer Chinook, Fall Chinook, and Sockeye) for tribal utilization. The harvest of abundant stocks, while at the same time catching and successfully releasing live listed species by using live-capture harvest gears and revival technologies, will continue to be tested and refined during this test phase (2008-2010). The evaluation (test) phase will include analysis of efficiency of capture techniques, evaluation of fish release condition, and education of tribal fishermen in selective harvest technologies. Specifically, the CCT plan to test large fishing gears (purse seine, beach seine and weir) in addition to smaller more individual-use gears (tangle nets, dip nets and hoop nets) in order to determine the efficacy of harvest and live-release gears.  Catch-per-unit effort will be analyzed in order to determine the methods with the highest catch rates of un-listed species; while at the same time determining the release condition of listed species. Associated with these live-capture gears will be the use of revival (recovery) devices (boxes with circulating water) and potentially, tagging of released fish for post-release “recapture” in spawning ground surveys, creel surveys, and subsequent re-capture in the gears themselves to further investigate post-release fish condition.  The problem with using mark-recapture is the confounding impacts of tagging and releasing fish, resulting in uncertainty about whether the live-capture gear and catching technique results in mortality, or the tagging operation. A public education and training program aimed at instructing tribal members on live-capture techniques (fish handling, determination of which fish to release, and assistance in tag recoveries) will be conducted. Volunteer channels as a live-capture harvest method will also be evaluated, once the proposed Chief Joseph Dam Salmon Hatchery Project is built (i.e., fish ladder and holding trap).

2) Selective harvest to protect natural-origin recruits (NOR) – to prevent future listings: Upper Columbia River summer Chinook and fall Chinook (Oncorhynchus tshawytscha) and Upper Columbia River Sockeye salmon (Oncorhynchus nerka). These selective harvest live-capture gear strategies and evaluations will also be applied to other species that are not listed under the federal ESA (Upper Columbia River summer and fall Chinook, and sockeye salmon). The Tribes wish to protect naturally-producing fish of these un-listed stocks for broodstock needs and natural productivity, increasing pNOB (proportion of natural-origin fish in the broodstock) in addition to preventing future listings under the federal ESA.

3) Modern with traditional. Preserving and restoring the tribal salmon fishery resource is on equal footing with preserving and restoring tribal culture. Salmon fishing is a fundamental aspect of Colville tribal culture, but has been significantly diminished, primarily due to the construction and operation of large hydroelectric dams that have eliminated salmon from the vast majority of the Tribes traditional fishing areas. With the massive reduction of salmon, and hence salmon fishing, a significant part of the Tribal culture has been hindered. The Tribes are resolute to preserve and re-establish this significant and central aspect of their historical culture. The Tribes intend to use traditional techniques, fused with modern applications, in order to protect and re-build the salmon resource and a significant part of the Tribal culture. Most of the traditional salmon fishing techniques and gears the CCT have used since time immemorial are well suited for selective harvest.  The CCT have used live capture techniques for thousands of years – primarily fish baskets, dip nets and weirs with traps. These techniques, modernized, along with new live-capture gears such as fish wheels and seines will be evaluated for harvest efficiency and release condition of natural-origin and listed fish.  Although non-selective and lethal spear fishing is traditional, this method has not been used for several generations, and will not be evaluated as a live-capture technique.  Methods such as snagging and gillnetting are more modern techniques presently used in the limited tribal salmon fishery, and although the Tribes are cognizant that this method will continue to exist for securing the tribal harvest allocation, the Tribes are likewise encouraged that positive education and outreach to inform and train the membership in new fused with old techniques is anticipated to be highly effective in order to increase harvest opportunities while at the same time preserving and re-establishing culturally significant techniques.

4) Secure harvest allocation (“Agreement between the Confederated Tribes of the Colville Reservation and the Washington Department of Fish and Wildlife on Jointly managed salmon and steelhead populations”). In June of 2007 the CCT and Washington Department of Fish and Wildlife entered into a formal harvest agreement on jointly managed salmon and steelhead populations (Agreement).  Pursuant to the government-to-government relationship between the Colville Tribes and the State of Washington, the Agreement develops formal recognition of the rights of the Colville Tribes to an opportunity to harvest a fair share of the salmon and steelhead originating from the Colville Reservation, the former North Half thereof, and all Reservation and North Half boundary waters.  The Agreement recognizes the critical need to ensure that spawning escapement goals are achieved for the salmon and steelhead populations of the upper Columbia basin, along with the partnership of the CCT and the WDFW in managing tribal and non-tribal salmon and steelhead fisheries on and adjacent to the Colville Reservation and North Half. It is the intent of both parties to develop annual fisheries that achieve allocation objectives and full utilization of each parties share. It is the intent of the CCT to use live-capture, selective fishing techniques and gears to increase the Tribes’ salmon harvest capacity in order to fully utilize their harvest allocation. Thus, this evaluation of live-capture gears is of paramount importance to the CCT to protect the salmon resource, the Tribal fishery, and its culture for current and future generations.

5) Linkage of selective fishing to Chief Joseph Hatchery  Program. The development and deployment of live-capture, selective fishing gear is critical to the successful operation of the Chief Joseph Hatchery Program (CJHP).  First, selective harvesting will allow the Colville Tribes to reap the ceremonial and subsistence benefits of Chinook propagation provided by the CJHP without endangering the status of other, depressed fish species that may be co-mingling with the marked, hatchery-origin Chinook.  Second, selective fishing is essential to remove a high proportion of hatchery Chinook originating from the CJHP and the significant numbers of stray hatchery Chinook from downriver programs.  This method will significantly decrease pHOS (the proportion of hatchery-origin fish on the spawning grounds). The harvest of hatchery Chinook and allowing the natural escapement of natural-origin Chinook will increase and preserve the diversity and viability of the Okanogan summer/fall Chinook population.

CCT during the first 6 months of this contract, CCT will review long-term fish storage to determine the extent to which this is the responsibility of the BPA funding.
Account Type(s):
Expense
Contract Start Date:
06/01/2010
Contract End Date:
07/31/2011
Current Contract Value:
$692,627
Expenditures:
$692,627

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Mickey Carter Bonneville Power Administration Yes Env. Compliance Lead macarter@bpa.gov (503) 230-5885
Dale Clark Colville Confederated Tribes Yes Technical Contact dale.clark@colvilletribes.com (509) 422-7508
Darcy Edwards Colville Confederated Tribes No Administrative Contact darcy.edwards@colvilletribes.com (509) 634-2114
Billy Gunn Colville Confederated Tribes Yes Administrative Contact billy.gunn@colvilletribes.com (509) 422-7740
Keith Kutchins Upper Columbia United Tribes (UCUT) No Interested Party keith@ucut-nsn.org (509) 209-2411
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Terri Mail Colville Confederated Tribes Yes Administrative Contact terri.mail@colvilletribes.com (509) 634-2124
Cindy McCartney Colville Confederated Tribes Yes Administrative Contact cindy.mccartney@colvilletribes.com (509) 634-2112
Joe Peone Colville Confederated Tribes No Supervisor joe.peone@colvilletribes.com (509) 634-2113
Michael Rayton Colville Confederated Tribes Yes Contract Manager michael.rayton@colvilletribes.com (509) 422-7434
Shannon Riper D J Warren and Associates, Inc. Yes Interested Party shannon.riper@djwassociates.com (541) 929-4639
David Roberts Bonneville Power Administration Yes COR daroberts@bpa.gov (503) 230-4511
Norma Sanchez Colville Confederated Tribes No Administrative Contact norma.sanchez@colvilletribes.com (509) 634-2109
Tom Sargent Colville Confederated Tribes No Interested Party tom.sargent@colvilletribes.com (509) 634-2853
Perf Tester Bonneville Power Administration No perftester@bpa.gov (123) 123-1234
Kimberly Upham Bonneville Power Administration Yes Interested Party kaupham@bpa.gov (503) 230-3196
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Dan Warren D J Warren and Associates, Inc. Yes Interested Party dan.warren@djwassociates.com (541) 929-4639


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Determine which ESA, and waterway permits, and NEPA compliance are needed A: 165. Determine which ESA, and waterway permits, and NEPA compliance are needed and obtain. 07/01/2010 07/01/2010
Funding Package - Submit draft to COTR B: 119. Project Administration 03/01/2011 03/01/2011
Inform and educate the CCT membership, and other regional partners C: 99. Inform and educate the CCT membership and general public. 05/31/2011 05/31/2011
Develop standard operating procedures for gear, fish handling and distribution, and data management D: 156. Develop standard operating procedures for gear, fish handling and distribution, and data management 05/31/2011
Evaluate a variety of live-capture gears at discrete locations. E: 157. Evaluate a variety of live-capture gears at discrete locations 12/31/2010 09/30/2010
Planning and design of a weir as a live-capture selective fishing gear in the Okanogan River F: 175. Planning and design of a weir as a live-capture selective fishing gear in the Okanogan River 05/31/2011 05/31/2011
Upgrade existing structures for salmon processing G: 98. Salmon Processing Building(s) upgrades 05/31/2011 05/31/2011
Design Fish Preservation Building in Nespelem H: 175. Design Fish Preservation Building in Nespelem 04/18/2011
Final Annual report for the period 6/1/09 to 5/31/10 submitted to BPA COTR J: 132. Submit Annual Report for the period 6/1/09 to 5/31/10 07/31/2011
100% design, cost estimates & construction specifications for fishing platforms complete K: 175. Produce Design & Specifications for Colville Fishing Platforms 04/30/2011 05/31/2011
Completed fishing platforms for the Colville Tribes L: 98. Construction of Colville Fishing Platforms 07/31/2011 07/31/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 2 instances of WE 98 Other
  • 3 instances of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 98 Other
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 98 Other
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Determine which ESA, and waterway permits, and NEPA compliance are needed and obtain. 06/01/2010
B 119 Project Administration 06/01/2010
C 99 Inform and educate the CCT membership and general public. 06/01/2010
D 156 Develop standard operating procedures for gear, fish handling and distribution, and data management 06/01/2010
E 157 Evaluate a variety of live-capture gears at discrete locations 07/07/2011
F 175 Planning and design of a weir as a live-capture selective fishing gear in the Okanogan River 06/01/2010
G 98 Salmon Processing Building(s) upgrades 06/01/2010
H 175 Design Fish Preservation Building in Nespelem 06/01/2010
I 185 Periodic Status Reports for BPA 06/01/2010
J 132 Submit Annual Report for the period 6/1/09 to 5/31/10 06/01/2010
K 175 Produce Design & Specifications for Colville Fishing Platforms 06/01/2010
L 98 Construction of Colville Fishing Platforms 01/11/2011