Contract 49232: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED-IDFG
Project Number:
Title:
Lower Clearwater and Potlatch Watersheds Habitat Improvements
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
49232
Contract Title:
2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED-IDFG
Contract Continuation:
Previous: Next:
43702: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED-IDFG-MOA
  • 55756: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED MOA/IDFG
Contract Status:
Closed
Contract Description:
This project is intended to implement habitat restoration activities in the Potlatch River Basin as identified in The Accord. The 377,776-acre Potlatch River watershed is located in north-central Idaho and is the largest tributary in the lower Clearwater River.  The Potlatch River is critical to wild Snake River steelhead.  This project seeks to restore wild Snake River Steelhead to a robust, self-sustaining population within the Potlatch River through coordinated implementation of best management practices on private timber, agricultural and range lands, coordination of interagency watershed planning efforts, and continuation of watershed monitoring and evaluation. This proposal is consistent with the NWPCC Fish and Wildlife Program’s goal to develop habitat-based programs designed to rebuild healthy, naturally producing fish and wildlife populations by protecting, mitigating, and restoring habitats. This project is consistent with the objectives and strategies of the Clearwater Subbasin Management Plan.

This project is intended to implement the Potlatch River Watershed Management Plan. The Plan has identified and prioritized limiting factors and restoration strategies critical to steelhead spawning and rearing within each subwatershed. Priority tributaries for restoration work include:  East and West Fork Potlatch River, Big Bear, Little Bear,  Pine, Cedar, and Corral creeks. The mainstem Potlatch River is also a priority restoration area. Projects will address limiting factors including removing migration barriers, increasing instream habitat complexity, reducing stream temperature and sediment load,  increasing base flows, and reducing high spring run conditions.  Implementation efforts will include but are not limited to repair, removal or replacement of old culverts and bridges, stream and floodplain reconnection, installation of large woody debris and other instream habitat structures, implementation of erosion/sediment control structures, riparian planting, livestock exclusion fencing, off-site water development, and protection of riparian and floodplain areas through easements or direct purchase.

It is intended that project staff will continue to seek additional non-BPA funds to implement best management practices designed for the improvement of steelhead spawning and rearing habitat.  Project staff will also continue coordination efforts with other watershed planning efforts throughout the region to improve fish habitat.

The primary objectives of this contract include:

- Identify, plan, design, fund and implement best management practices to improve steelhead habitat within the Potlatch River watershed cooperatively with Pacific Coast Salmon Recovery Funds.
- Begin restoration practices on Pine Creek and begin work to remove a migration barrier on Cedar Ridge Road over Pine Creek
- Begin Phase I work on the East Fork Potlatch River and East Fork Corral Creek.
Account Type(s):
Expense
Contract Start Date:
09/01/2010
Contract End Date:
12/31/2011
Current Contract Value:
$173,866
Expenditures:
$173,866

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Funding Package - Submit draft to COTR A: 119. Project management and administration 11/15/2011 11/15/2011
Environmental Compliance and Consultation Review B: 165. Environmental Compliance and Consultation Review 07/29/2011 07/29/2011
Two new habitat restoration site identified C: 114. Identify and prioritize future projects 12/30/2011 10/28/2011
Public Outreach and Education D: 99. Public Outreach and Education 12/30/2011 12/30/2011
Restoring channel to natural conditions E: 30. Pine Creek Channel Restoration 12/30/2011 12/30/2011
Increase Instream Habitat Complexity F: 29. Pine Creek Channel Restoration 12/30/2011 11/15/2011
Completed Bid Package & Contractor Hired G: 188. Pine Creek Channel Restoration and Bridge 12/30/2011 07/29/2011
Pine Creek Bridge Barrier Removed H: 85. Pine Creek Bridge on Cedar Ridge Road 12/30/2011 12/16/2011
Pine Creek re-planted I: 47. Pine Creek Revegetation 12/30/2011 10/30/2011
Shea Meadow Restoration Plan J: 174. Shea Meadows Restoration Plan 12/30/2011
Temperature loggers in the Potlatch River and select tributaries K: 157. Temperature loggers 08/31/2011 11/15/2011
Annual Completion Report L: 132. Annual report for Contract 43702 11/19/2010 11/19/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Project management and administration 07/01/2010
B 165 Environmental Compliance and Consultation Review 07/01/2010
C 114 Identify and prioritize future projects 07/01/2010
D 99 Public Outreach and Education 07/01/2010
E 30 Pine Creek Channel Restoration
F 29 Pine Creek Channel Restoration
G 188 Pine Creek Channel Restoration and Bridge
H 85 Pine Creek Bridge on Cedar Ridge Road
I 47 Pine Creek Revegetation
J 174 Shea Meadows Restoration Plan 07/01/2010
K 157 Temperature loggers 07/01/2010
L 132 Annual report for Contract 43702 07/01/2010
M 185 Periodic Status Reports for BPA 07/01/2010
N 132 Progress report 09/01/2010