SOW Report
Contract 49723: 2007-231-00 EXP UPA ENTIAT RIPARIAN
Project Number:
Title:
Entiat River Riparian Restoration
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Columbia Cascade Entiat 100.00%
Contract Number:
49723
Contract Title:
2007-231-00 EXP UPA ENTIAT RIPARIAN
Contract Continuation:
Previous: Next:
44290: 2007-231-00 EXP UPA ENTIAT RIPARIAN
Contract Status:
History
Contract Description:
#  Details Concerning CCR-23524:

All proposed projects under 2007-231-00 EXP UPA Entiat Riparian (Contract#44290), were fully developed and implemented in Fall 2010. Project specific monitoring on sites previously planted sites under contract #44290, will identify the success and necessity of various planting techniques incorporated into restoration plans. Additionally, new project locations were identified in late fall 2010 during project (Contract#44290) implementation and Cascadia is currently working with those streamside landowners to develop restoration plans to be implemented in fall 2011.

The re-scheduling of funds is allowing the Cascadia Conservation District to extensively monitor conditions at existing sites through photo, growth and survival, shade, and weed control monitoring. If needed sites will receive physical removal of competing non-native vegetation, selective application of additional soil amendments, certified noxious weed-free wood chip mulch and browse protection. Additional native grass seeding and selective fill planting will also be used to maximize site growing conditions, by utilizing those species that appear well-adapted to local conditions based on monitoring results. The re-scheduling is also allowing for continued work with the landowners identified under current contract #49723 in late fall 2010, to develop and implement restoration plans in the fall 2011. (Note: Contracts # 44290 and 49723 had a two month overlap from 9/30/2010 through 11/30/2011.) Additionally, since this is the final year for the EXP UPA Entiat Riparian programmatic funds will be utilized to conduct an extensive outreach campaign to identify and work with additional streamside landowners for future riparian restoration efforts in the Entiat Watershed. Outreach includes but is not limited to the development and distribution  of an outreach brochure, Cascadia Conservation Quarterly Newsletter articles, Entiat Leader Newsletter articles, as well as directed calls. All efforts are diving by the GeoEngineers 2007, Entiat Riparian Restoration Prioritization Report and interested streamside landowners.


*********************************************************************************************************************************************************************************************************************************************************************************************************************************************

Conduct outreach to streamside landowner in the Entiat watershed in order to identify, select, and secure willing landowner to participate in riparian restoration projects. Once landowner agreements are in place this contract will be amended to include those work elements  and budget necessary to conduct those actual restoration work.

Riparian restoration work will  be accomplished in other portions of the Entiat River as a result of outreach and landowner communication.   While the outreach will begin as early as October 1, 2010 the actual restoration work will take place in the spring or fall of 2011.

Landowner outreach to explain the value of healthy riparian areas will be conducted watershed wide via newsletters, direct mailings and attending community events (Earth Day) as well as one-on-one communication taking place in person and on the phone.  This work will result in landowner agreements being secured with the landowners of the five sites where planting will take place and likely lead to additional sites.  We will also work with school groups to educate them on the functions of riparian areas and to allow them to assist in some planting at the sites.

A portion of this contract will contain a work element to allow maintenance and monitoring of restoration work in previous BPA contracts. Specifically, Tillicum and Indian Creeks, and all fall 2010 sites  Maintenance will include Noxious weed removal will be conducted at these sites via hand pulling,  irrigation systems repairs (Mom & Me Gardens, RM6, and Olin Ranch), replanting of non-survival to maintain 75% survival and success.

Continued project coordination, management and reporting will be done during the contract period so that we remain in compliance with the contract requirements.
Account Type(s):
Expense
Contract Start Date:
09/30/2010
Contract End Date:
11/30/2011
Current Contract Value:
$85,590
Expenditures:
$85,590

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Joseph Connor Bonneville Power Administration Yes COR jwconnor@bpa.gov (503) 230-3172
Douglas Corkran Bonneville Power Administration Yes Env. Compliance Lead dfcorkran@bpa.gov (503) 230-7646
Susan Dretke Cascadia Conservation District No Interested Party susan.dretke@wa.nacdnet.net (509) 664-9348
Peggy Entzel Cascadia Conservation District No Administrative Contact peggye@cascadiacd.org (509) 436-1601
Valerie Hampton Cascadia Conservation District No Administrative Contact valerie.hampton@cascadiacd.org (509) 887-7888x107
Kate Koenig Cascadia Conservation District No Technical Contact kate.koenig@wa.nacdnet.net (509) 664-9355
Amanda Levesque Cascadia Conservation District No Interested Party amanda.levesque@wa.nacdnet.net (509) 664-9313
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Phylisha Olin Cascadia Conservation District Yes Contract Manager phylisha.olin@wa.nacdnet.net (509) 664-9309
Michael Rickel Cascadia Conservation District Yes Supervisor miker@cascadiacd.org (509) 436-1601x103
Mike Sandidge Cascadia Conservation District No Interested Party mike.sandidge@wa.nacdnet.net (509) 664-9345
Jennifer Stolz Bonneville Power Administration Yes Interested Party jpstolz@bpa.gov (503) 230-3233
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Nada Wentz Cascadia Conservation District No Interested Party nada.wentz@wa.nacdnet.net (509) 664-9370


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
#Environmental compliance for riparian maintenance and riparian and fence installation A: 165. #Environmental compliance for riparian maintenance and riparian and fence installation 11/30/2011 04/11/2011
Project Activities Completed. B: 119. #Project Coordination 11/30/2011 11/30/2011
Collect and report monitoring data on Riparian Projects C: 157. #Collect and report monitoring data on Riparian Projects 11/30/2011 11/30/2011
Other Riparian Projects in the Entiat Subbasin identified and selected. D: 114. Secure landowner agreements and begin project planning 11/30/2011 11/30/2011
Landowner willingness and planting sites secured. E: 99. #Outreach to landowners along the Entiat River to secure sites to plant riparian vegetation 11/30/2011 11/30/2011
*Maintenance of vegetation at previously planted sites F: 22. Post-planting: Maintenance on all Riparian Projects 11/30/2011 11/30/2011
Attach Progress Reports in Pisces H: 132. Submit Progress Report for Sept. 18, 2009 to Nov. 30, 2010 01/31/2011 01/31/2011
Attach Progress Report in Pisces I: 132. Submit Progress Report for the period Oct.1, 2010 to Nov. 30, 2011 11/29/2011 11/28/2011
# Construct 2200 linear feet of fence at Medsker Canyon site J: 40. # Construct 2200 linear feet of fence / Medsker Canyon site 11/30/2011
# Construct 1500 linear feet of fence at Tyee Spring 1 site K: 40. # Construct 1500 linear feet of fence / Tyee Spring 1 site 11/30/2011
# Construct 500 linear feet of fence at Tyee Spring 1 site L: 40. # Construct 500 linear feet of fence / Tyee Spring 2 site 11/30/2011
# Construct 500 linear feet of fence at RM 12 site M: 40. # Construct 500 linear feet of fence / RM 12 site 11/30/2011
# Construct 1100 linear feet of fence at Mud Creek site N: 40. # Construct 1100 linear feet of fence / Mud Creek site 11/30/2011 10/27/2011
#Restore 1.5 acres of riparian habitat with native, trees, shrubs, and grasses / Medsker Canyon site O: 47. #Restore 1.5 acres of riparian habitat with native, trees, shrubs, and grasses / Medsker Canyon site 11/30/2011 11/08/2011
#Restore 1.0 acres of riparian habitat with native, trees, shrubs, and grasses / Tyee Springs 1 Site P: 47. #Restore 1.0 acres of riparian habitat with native, trees, shrubs, and grasses / Tyee Springs 1 site 11/30/2011 11/09/2011
#Restore 1.0 acres of riparian habitat with native, trees, shrubs, and grasses / Tyee Springs 1 site Q: 47. #Restore 0.4 acres of riparian habitat with native, trees, shrubs, and grasses / Tyee Springs 2 site 11/30/2011 11/10/2011
#Restore 0.4 acres of riparian habitat with native, trees, shrubs, and grasses / RM 12 site R: 47. #Restore 0.4 acres of riparian habitat with native, trees, shrubs, and grasses / RM 12 site 11/30/2011 11/24/2011
#Restore 0.9 acres of riparian habitat with native, trees, shrubs, and grasses / Mud Creek site S: 47. #Restore 0.9 acres of riparian habitat with native, trees, shrubs, and grasses / Mud Creek site 11/30/2011 11/07/2011
#Restore 0.6 acres of riparian habitat with native, trees, shrubs, and grasses / Confluence site T: 47. #Restore 0.6 acres of riparian habitat with native, trees, shrubs, and grasses / Confluence site 11/30/2011
# Medsker Canyon Restoration Plan U: 174. #Medsker Canyon Restoration Plan 09/15/2011 09/15/2011
#Tyee Spring 1 Restoration Plan V: 174. #Tyee Spring 1 Restoration Plan 09/15/2011 08/10/2011
#Tyee Spring 2 Restoration Plan W: 174. #Tyee Spring 2 Restoration Plan 09/15/2011 08/10/2011
#RM 12 Restoration Plan X: 174. #RM 12 Restoration Plan 09/15/2011 08/26/2011
#Mud Creek Restoration Plan Y: 174. #Mud Creek Restoration Plan 09/15/2011 09/15/2011
#Confluence Restoration Plan Z: 174. #Confluence Restoration Plan 09/15/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 22 Maintain Vegetation
  • 5 instances of WE 40 Install Fence
  • 6 instances of WE 47 Plant Vegetation
  • 6 instances of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 22 Maintain Vegetation
  • 5 instances of WE 40 Install Fence
  • 6 instances of WE 47 Plant Vegetation
  • 6 instances of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 22 Maintain Vegetation
  • 5 instances of WE 40 Install Fence
  • 6 instances of WE 47 Plant Vegetation
  • 6 instances of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 #Environmental compliance for riparian maintenance and riparian and fence installation 09/30/2010
B 119 #Project Coordination 09/16/2010
C 157 #Collect and report monitoring data on Riparian Projects 09/30/2010
D 114 Secure landowner agreements and begin project planning 09/16/2010
E 99 #Outreach to landowners along the Entiat River to secure sites to plant riparian vegetation 09/16/2010
F 22 Post-planting: Maintenance on all Riparian Projects 09/30/2010
G 185 Periodic Status Reports for BPA 09/16/2010
H 132 Submit Progress Report for Sept. 18, 2009 to Nov. 30, 2010 09/16/2010
I 132 Submit Progress Report for the period Oct.1, 2010 to Nov. 30, 2011 09/30/2010
J 40 # Construct 2200 linear feet of fence / Medsker Canyon site 09/22/2011
K 40 # Construct 1500 linear feet of fence / Tyee Spring 1 site 09/22/2011
L 40 # Construct 500 linear feet of fence / Tyee Spring 2 site 09/22/2011
M 40 # Construct 500 linear feet of fence / RM 12 site 09/22/2011
N 40 # Construct 1100 linear feet of fence / Mud Creek site 09/22/2011
O 47 #Restore 1.5 acres of riparian habitat with native, trees, shrubs, and grasses / Medsker Canyon site 09/22/2011
P 47 #Restore 1.0 acres of riparian habitat with native, trees, shrubs, and grasses / Tyee Springs 1 site 09/22/2011
Q 47 #Restore 0.4 acres of riparian habitat with native, trees, shrubs, and grasses / Tyee Springs 2 site 09/22/2011
R 47 #Restore 0.4 acres of riparian habitat with native, trees, shrubs, and grasses / RM 12 site 09/22/2011
S 47 #Restore 0.9 acres of riparian habitat with native, trees, shrubs, and grasses / Mud Creek site 09/22/2011
T 47 #Restore 0.6 acres of riparian habitat with native, trees, shrubs, and grasses / Confluence site 09/22/2011
U 174 #Medsker Canyon Restoration Plan 09/30/2010
V 174 #Tyee Spring 1 Restoration Plan 09/30/2010
W 174 #Tyee Spring 2 Restoration Plan 09/30/2010
X 174 #RM 12 Restoration Plan 09/30/2010
Y 174 #Mud Creek Restoration Plan 09/30/2010
Z 174 #Confluence Restoration Plan 09/30/2010