| Province | Subbasin | % |
|---|---|---|
| Columbia Plateau | Crab | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Environmental Compliance | B: 165. Environmental compliance documentation | 02/01/2011 | 02/01/2011 | |
| Water Use Documentation | C: 181. Coordinate with BOR and Quincy Irrigation District | 09/30/2011 | 09/30/2011 | |
| Armor dikes at the TD-1 site | D: 186. Inspect, repair, physical enhancements and dikes at TD-1 site | 01/31/2012 | 01/31/2012 | |
| Armor dikes at the TD-2 site | E: 186. Inspect and repair dikes at TD-2 site | 01/31/2012 | 01/31/2012 | |
| Seed disturbed soil at TD-1 | F: 186. Seed disturbed soil at TD-1 site | 01/31/2012 | 01/24/2012 | |
| Seed disturbed soil at TD-2 | G: 186. Seed disturbed soil at TD-2 site | 01/31/2012 | 01/30/2012 | |
| TD-1 cells tilled | H: 22. Till cells at TD-1 | 08/31/2011 | 08/12/2011 | |
| Seed 30 acres of moist soil vegetation at TD-1 project site | I: 47. Moist soil seeding in TD-1 | 08/15/2011 | 08/26/2011 | |
| Monitor and maintain moist soil vegetation stand at TD-1 project site | J: 22. Monitor and maintain desirable vegetation | 09/30/2011 | 09/30/2011 | |
| Control of undesirable/invasive vegetation at TD-1 | K: 53. Control undesirable vegetation at TD-1 | 12/30/2011 | 12/30/2011 | |
| Control of undesirable/invasive vegetation at TD-2 project site | L: 53. Control undesirable vegetation at TD-2 | 12/30/2011 | 12/30/2011 | |
| Water in wetland cells at TD-1 | M: 186. Operate water control structures at TD-1 | 01/31/2012 | 01/31/2012 | |
| BPA required administrative duties | N: 119. BPA Administrative requirements | 01/31/2012 | 01/09/2012 | |
| Wildlife Area Administrative duties | O: 119. WDFW Administrative Requirements | 01/31/2012 | 01/31/2012 | |
| Attach Annual Progress Report in Pisces | P: 132. Submit Progress Report for the period Feb 2011 to Jan 2012 | 01/31/2012 | 01/31/2012 | |
| Attach 10-year Progress Report in Pisces | Q: 132. Submit Progress Report for period Nov 2001 to Oct 2011 | 01/31/2012 | 01/31/2012 | |
| Numbers and species of waterfowl using TD1 and TD2 waters through the fall and winter | R: 157. Fall and winter waterfowl counts | 01/31/2012 | 01/06/2012 | |
| Numbers and species of waterfowl pairs using TD2 waters in the spring. | S: 157. Spring waterfowl pair counts | 05/31/2011 | 05/31/2011 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Wildlife |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 185 | Periodic Status Reports for BPA | 02/01/2011 | ||||||
| B | 165 | Environmental compliance documentation | 02/01/2011 | ||||||
| C | 181 | Coordinate with BOR and Quincy Irrigation District | 02/01/2011 | ||||||
| D | 186 | Inspect, repair, physical enhancements and dikes at TD-1 site | 02/01/2011 | ||||||
| E | 186 | Inspect and repair dikes at TD-2 site | 02/01/2011 | ||||||
| F | 186 | Seed disturbed soil at TD-1 site | 02/01/2011 | ||||||
| G | 186 | Seed disturbed soil at TD-2 site | 02/01/2011 | ||||||
| H | 22 | Till cells at TD-1 | 02/01/2011 | ||||||
| I | 47 | Moist soil seeding in TD-1 | 02/01/2011 | ||||||
| J | 22 | Monitor and maintain desirable vegetation | 02/01/2011 | ||||||
| K | 53 | Control undesirable vegetation at TD-1 | 02/01/2011 | ||||||
| L | 53 | Control undesirable vegetation at TD-2 | 02/01/2011 | ||||||
| M | 186 | Operate water control structures at TD-1 | 02/01/2011 | ||||||
| N | 119 | BPA Administrative requirements | 02/01/2011 | ||||||
| O | 119 | WDFW Administrative Requirements | 02/01/2011 | ||||||
| P | 132 | Submit Progress Report for the period Feb 2011 to Jan 2012 | 02/01/2011 | ||||||
| Q | 132 | Submit Progress Report for period Nov 2001 to Oct 2011 | 02/01/2011 | ||||||
| R | 157 | Fall and winter waterfowl counts | 02/01/2011 | ||||||
| S | 157 | Spring waterfowl pair counts | 02/01/2011 |