| Province | Subbasin | % |
|---|---|---|
| Columbia Cascade | Entiat | 5.00% |
| Methow | 35.00% | |
| Okanogan | 25.00% | |
| Wenatchee | 35.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Full Name | Organization | Write Permission | Contact Role | Work Phone | |
|---|---|---|---|---|---|
| Brenda Aguirre | Bonneville Power Administration | Yes | Env. Compliance Lead | baguirre@bpa.gov | (503) 230-5928 |
| John Arterburn | Colville Confederated Tribes | Yes | Interested Party | john.arterburn@colvilletribes.com | (509) 422-7424 |
| Roy Beaty | Bonneville Power Administration | Yes | F&W Approver | rebeaty@bpa.gov | (503) 230-5213 |
| Joseph Connor | Bonneville Power Administration | Yes | COR | jwconnor@bpa.gov | (503) 230-3172 |
| Brenda Heister | Bonneville Power Administration | Yes | Contracting Officer | bsheister@bpa.gov | (503) 230-3531 |
| Todd Miller | Washington Department of Fish and Wildlife (WDFW) | Yes | Contract Manager | todd.miller@dfw.wa.gov | (509) 382-1710 |
| Andrew Murdoch | Washington Department of Fish and Wildlife (WDFW) | Yes | Supervisor | andrew.murdoch@dfw.wa.gov | (509) 664-3148x15 |
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| EC documents obtained for this contract and for FY11 CR-187498 | A: 165. Provide EC documentation to BPA | 06/30/2012 | 06/30/2012 | |
| Project managed. Draft contracting package including the SOW, LIB, & PI submitted to COTR. | B: 119. Manage and administer project | 06/30/2012 | 06/30/2012 | |
| Estimated number of hatchery and wild steelhead at Priest Rapids Dam | C: 157. Upper Columbia steelhead stock assessment | 12/31/2011 | 12/31/2011 | |
| Develop statistical model to estimate steelhead run escapement | D: 156. Develop statistical model to estimate steelhead run escapement | 06/30/2012 | 06/30/2012 | |
| Install PIT tag arrays | E: 70. Install permanent in-stream PIT tag arrays in preselected locations | 06/30/2012 | 06/30/2012 | |
| PIT tag recapture data | F: 159. Upload PIT tag data to PTAGIS database | 06/30/2012 | 06/30/2012 | |
| Number of hatchery and wild steelhead. | G: 157. Estimate the number of hatchery and wild steelhead | 06/30/2012 | 06/30/2012 | |
| Temporary PIT tag antennas | H: 70. Install temporary PIT tag arrays in preselected locations | 06/30/2012 | 06/30/2012 | |
| Number of steelhead that spawned outside of survey area | I: 157. Estimate number of steelhead spawning outside of survey area | 06/30/2012 | 06/30/2012 | |
| Estimates of observer efficiency | J: 157. Estimate spring Chinook redd observer efficiency | 06/30/2012 | 06/30/2012 | |
| Estimates of observer efficiency | K: 157. Estimate steelhead redd observer efficiency | 06/30/2012 | 06/30/2012 | |
| FY10 Annual Report for Contract Numbers 47950 (WDFW) and 48256 (CCT) | M: 132. Submit Progress Report for the period (July 2010) to (June 2011) | 06/30/2012 | 06/30/2012 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
| Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 165 | Provide EC documentation to BPA | 07/01/2011 | ||||||
| B | 119 | Manage and administer project | 07/01/2011 | ||||||
| C | 157 | Upper Columbia steelhead stock assessment | 07/01/2011 | ||||||
| D | 156 | Develop statistical model to estimate steelhead run escapement | 07/01/2011 | ||||||
| E | 70 | Install permanent in-stream PIT tag arrays in preselected locations | 07/01/2011 | ||||||
| F | 159 | Upload PIT tag data to PTAGIS database | 07/01/2011 | ||||||
| G | 157 | Estimate the number of hatchery and wild steelhead | 07/01/2011 | ||||||
| H | 70 | Install temporary PIT tag arrays in preselected locations | 07/01/2011 | ||||||
| I | 157 | Estimate number of steelhead spawning outside of survey area | 07/01/2011 | ||||||
| J | 157 | Estimate spring Chinook redd observer efficiency | 07/01/2011 | ||||||
| K | 157 | Estimate steelhead redd observer efficiency | 07/01/2011 | ||||||
| L | 185 | Periodic Status Reports for BPA | 07/01/2011 | ||||||
| M | 132 | Submit Progress Report for the period (July 2010) to (June 2011) | 07/01/2011 |