Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 53459: 1996-042-00 EXP RESTORE SALMON CR ANADROMOUS FISH
Project Number:
Title:
Restore Salmon Creek Anadromous Fish
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Columbia Cascade Okanogan 100.00%
Contract Number:
53459
Contract Title:
1996-042-00 EXP RESTORE SALMON CR ANADROMOUS FISH
Contract Continuation:
Previous: Next:
48846: 199604200 EXP RESTORE SALMON CR ANAD FISH
  • 57344: 199604200 EXP RESTORE SALMON CR ANAD FISH
Contract Status:
Closed
Contract Description:
Since 1910, water from Salmon Creek has been stored in Conconully Reservoir, which is delivered to orchards and fields within the Okanogan Irrigation District, via ~ 12 miles of Salmon Creek.  In addition, a dam was constructed on Salmon Lake, which augments storage of Conconully Reservoir.   Water from the North Fork of Salmon Creek is diverted into Salmon Lake via a feeder canal.  Both reservoirs are near the town of Conconully, about 17 miles northwest of Okanogan. Two pumping plants supplement the  water supply during water-short years.  Shell Rock Pump Station lifts water from the Okanogan River, and Duck Lake Pumping Plant withdraws water from Duck Lake.

Salmon Creek, a tributary to the Okanogan River, is considered to be one of the most significant opportunities to restore summer steelhead in the Okanogan Basin.  This project reconnects the Okanogan River with approximately 11 miles of habitat conducive for spawning and rearing of summer steelhead.  During controlled water releases in 2003, approximately 25 cfs was required for fish migration downstream of the diversion dam.  During 2008 a "low-flow" channel was constructed downstream of the diversion dam which provided suitable fish passage conditions at approximately 10 cfs.  The low flow channel extended the duration of water available through a 12-year water lease program.  

Evaluation of the migration conditions and the stability of the low-flow channel will be conducted over the next several years.  Minor modifications of the low-flow channel will be implemented concurrent with identification/evaluation.  Large-scale modifications will involve evaluation, design, permitting and heavy-machinery.  The large scale modifications will likely be implemented after the water release for that year.  Coordination and exchange of information with the irrigation district, landowners along Salmon Creek, local government, state fish and wildlife and other natural resource management entities will continue.
Account Type(s):
Expense
Contract Start Date:
08/01/2011
Contract End Date:
07/31/2012
Current Contract Value:
$227,329
Expenditures:
$227,329

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Eleanor Bosman-Clark Colville Confederated Tribes Yes Interested Party eleanor.bosman-clark@colvilletribes.com (509) 422-7418
Chris Fisher Colville Confederated Tribes Yes Contract Manager chris.fisher@colvilletribes.com (509) 422-7427
Billy Gunn Colville Confederated Tribes Yes Administrative Contact billy.gunn@colvilletribes.com (509) 422-7740
Joy Juelson J&J Environmental No Interested Party jjuelson@gmail.com (509) 293-6719
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Terri Mail Colville Confederated Tribes Yes Administrative Contact terri.mail@colvilletribes.com (509) 634-2124
Cindy McCartney Colville Confederated Tribes No Administrative Contact cindy.mccartney@colvilletribes.com (509) 634-2112
Jennifer McKim Colville Confederated Tribes Yes Interested Party jennifer.mckim@colvilletribes.com (509) 422-7418
Kary Nichols Colville Confederated Tribes No Interested Party kary.nichols@colvilletribes.com (509) 422-4782
Michelle O'Malley Bonneville Power Administration No Interested Party mmomalley@bpa.gov (503) 230-5138
Joe Peone Colville Confederated Tribes No Supervisor joe.peone@colvilletribes.com (509) 634-2113
Jenna Peterson Bonneville Power Administration Yes Interested Party jepeterson@bpa.gov (503) 230-3018
David Roberts Bonneville Power Administration Yes COR daroberts@bpa.gov (503) 230-4511
Norma Sanchez Colville Confederated Tribes Yes Administrative Contact norma.sanchez@colvilletribes.com (509) 634-2109
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance Requirements B: 165. Environmental Compliance Requirements 09/15/2011 09/15/2011
Funding Package - Submit draft to COTR C: 119. Develop SOW, Budget for 2012 03/01/2012 03/16/2012
Coordinate annual activities with landowners, local govts., irrigation district, WDFW and UCR D: 191. Coordinate annual activities with landowners, local govts., OID, WDFW and UCRSRB 06/29/2012 06/04/2012
Coordination with National Marine Fisheries Service and Bureau of Reclamation E: 161. Coordination with National Marine Fisheries Service and Bureau of Reclamation 04/30/2012 04/30/2012
Evaluation of fish passage conditions during controlled releases. F: 157. Evaluate fish passage conditions during controlled releases. 07/15/2012 06/04/2012
Low flow channel evaluation and potential modification G: 30. Low flow channel evaluation for potential modification 06/29/2012 06/29/2012
Increase bank stability along Salmon Creek H: 29. Develop a design to stabilize bank, and provide construction oversight for bank stabilization 03/15/2012 03/23/2012
Attach Progress Report in Pisces I: 132. Submit Progress(Annual) Report for the period (8/1/2010) to (7/31/2011) 06/29/2012 03/23/2012
Complete streambank stabilization project downstream of the Knutson's bridge crossing J: 29. Install hardened rock toe downstream of landowner bridge to increase bank stability 03/15/2012 03/23/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 08/01/2011
B 165 Environmental Compliance Requirements 08/01/2011
C 119 Develop SOW, Budget for 2012 08/01/2011
D 191 Coordinate annual activities with landowners, local govts., OID, WDFW and UCRSRB 08/01/2011
E 161 Coordination with National Marine Fisheries Service and Bureau of Reclamation 08/01/2011
F 157 Evaluate fish passage conditions during controlled releases. 08/01/2011
G 30 Low flow channel evaluation for potential modification
H 29 Develop a design to stabilize bank, and provide construction oversight for bank stabilization
I 132 Submit Progress(Annual) Report for the period (8/1/2010) to (7/31/2011) 08/01/2011
J 29 Install hardened rock toe downstream of landowner bridge to increase bank stability 02/27/2012