Contract 54088: 2007-396-00 EXP WWCCD CR SURVEY FOR N LATERAL PIPELINE
Project Number:
Title:
Walla Walla Basinwide Tributary Passage and Flow
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
54088
Contract Title:
2007-396-00 EXP WWCCD CR SURVEY FOR N LATERAL PIPELINE
Contract Continuation:
Previous: Next:
42762: 200739600 CAP GFID PIPING PROJECT - WWCCD
Contract Status:
Closed
Contract Description:
The Walla Walla Conservation District proposes to construct a pipeline and/or install a lining to reduce water wastage due to seepage and evaporation in the Gardena Farms Irrigation District’s unimproved open ditch conveyance system.  It is anticipated that project construction will be funded by multiple state and federal agencies, including BPA, and completed in 3-4 stages over the course of several years.  

This contract will prepare for project construction by providing cultural resource inventory of approximately 22.9 miles of existing mainline and lateral ditch, which will either be piped or upgraded with a ditch liner plus corridors that could be utilized to realign the new pipeline/ditch.  The inventory will also include 50 pump stations that will be upgraded.  Installation of the pipeline or ditch liner will require either digging a trench and burying pipe or reshaping the existing ditch to install a lining material, which would most likely be concrete.  The alignment of the pipeline would follow the existing ditch for the most part although there would be some reaches where a different alignment is necessary.  Installation of a ditch liner would follow the existing alignment of the ditch.  Any abandoned ditch would be filled in with spoil.  Spoil from past canal maintenance is, for the most part, located in berms adjacent to the ditch.  Where spoil is not adequate to fill the abandoned ditch, material would be trucked in from borrow areas.  Pump stations will require a concrete pad and excavation to connect pumps to the new buried pipeline or lined ditch.  A date for construction has not been set.  This project connects to the Gardena South Lateral pipeline project which was funded in part by BPA and was previously surveyed by EWU personnel in 2009.  

The purpose of this contract is to conduct cultural resource background research and literature review, followed by a cultural resources inventory with limited subsurface testing and historical research (as necessary) in order to assist BPA and other federal funding agencies in complying with Section 106 of the National Historic Preservation Act and state funding agencies in complying with Executive Order 05-05.  Four tasks will be completed and reported on for this contract:
1) Background research, literature review.
2) Intensive pedestrian survey
3) Subsurface testing in high probability areas and/or areas subject to relatively greater intensity of project impacts throughout the project areas of potential effects (APE).
4) Historical research.  Historic irrigation systems will be evaluated for eligibility for inclusion in the National Register of Historic Places (NRHP).  Historical research may be necessary in addition to fieldwork in order to make recommendations of eligibility.
Account Type(s):
Expense
Contract Start Date:
08/01/2011
Contract End Date:
01/31/2012
Current Contract Value:
$35,977
Expenditures:
$35,977

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Audrey Ahmann Walla Walla County Conservation District (SWCD) Yes Contract Manager audrey.ahmann@wwccd.net (509) 522-6340x107
Dawn Boorse Bonneville Power Administration No Env. Compliance Lead drboorse@bpa.gov (503) 230-5678
Brenda Heister Bonneville Power Administration Yes Contracting Officer bsheister@bpa.gov (503) 230-3531
Rick Jones Walla Walla County Conservation District (SWCD) Yes Supervisor rick.jones@wwccd.net (509) 522-6340x110
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Michelle O'Malley Bonneville Power Administration Yes COR mmomalley@bpa.gov (503) 230-5138


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Project management activities complete B: 119. Manage administrative and financial aspects of project 01/31/2012 01/31/2012
Final Cultural Resources report submitted to BPA Resource Survey Cultural resources survey report C: 165. Prepare CR report of findings for submission to BPA for Gardena piping project 12/31/2011 12/31/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 05/23/2011
B 119 Manage administrative and financial aspects of project 09/01/2011
C 165 Prepare CR report of findings for submission to BPA for Gardena piping project 05/23/2011
D 132 Cultural resources survey report will suffice for the annual report 09/01/2011