Contract 54539: 2002-013-01 EXP WATER ENTITY (RPA 151) NWPPC
Project Number:
Title:
Water Entity - CBWTP
Stage:
Implementation
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
54539
Contract Title:
2002-013-01 EXP WATER ENTITY (RPA 151) NWPPC
Contract Continuation:
Previous: Next:
49753: 2002-013-01 EXP WATER ENTITY (RPA 151) NWPPC
  • 58768: 2002-013-01 EXP WATER ENTITY (RPA 151) NWPPC
Contract Status:
Closed
Contract Description:
The primary focus of the CBWTP is to fund water transactions that restore streamflow on ecologically-significant Columbia Basin tributaries.  The CBWTP is administered through a cooperative agreement between BPA and the National Fish and Wildlife Foundation (NFWF).  
Subbasin plans and other habitat assessments throughout the Columbia Basin cite inadequate streamflows as a key factor limiting the productivity of both anadromous and resident fish species.  Water transactions provide an effective and appropriate response to this key limiting factor.  Restored streamflow benefit multiple fish species, particularly Chinook and Steelhead.  
The CBWTP works through ten qualified local entities (QLEs).  The QLEs now include four state water agencies and six nonprofit organizations.  These QLEs receive funds to implement and monitor water transactions in multiple priority watersheds throughout the Columbia Basin.  
Since 2002, the QLEs have completed over 300 water right transactions that have restored over 724,000 acre-feet of flow to key tributary streams in the Columbia Basin.  These transactions have included a number of innovative methods, including split-season leases, source switches, permanent purchases and water produced through significant capital investments in irrigation efficiency projects.  The term of these deals has varied from short-term to permanent.  The CBWTP anticipates that transactions funded during the period FY 2013-2015 will be increasingly long-term and permanent deals providing instream benefits beyond the year of funding.
Account Type(s):
Expense
Contract Start Date:
10/01/2011
Contract End Date:
09/30/2012
Current Contract Value:
$3,862,678
Expenditures:
$3,862,678

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Transaction Complete A: 164. 267d-11(WWT-Teanaway #18 - Consumptive Permanent) 09/30/2012 09/30/2012
Transaction Complete B: 164. 102c-11(Pole Creek 2011) 09/30/2012 09/30/2012
Transaction Complete C: 164. 312-11(Tumalo Feed Canal Piping --Phase 2) 09/30/2012
Transaction Complete D: 164. 315-11(Olson Fifteenmile Purchase) 09/30/2012 09/30/2012
Transaction Complete E: 164. 299-10(Muir & McDonald Tannery) 09/30/2012
Transaction Complete F: 164. 263c-11(Roberts Creek Wilderness Water Permanent Protection) 09/30/2012 09/30/2012
Transaction Complete G: 164. 263b-10(Roberts Creek Wilderness Water) 09/30/2012 09/30/2012
Transaction Complete H: 164. 290-10(WWT Rattlesnake No. 1 - 2010) 09/30/2012 09/30/2012
Transaction Complete I: 164. 301-10(Placid Creek Split Season Forbearance and Lease) 09/30/2012
Transaction Complete J: 164. 159d-10(DWA Bank 2010b) 09/30/2012
Transaction Complete K: 164. 159c-10(DWA Bank 2010) 09/30/2012 09/30/2012
Transaction Complete L: 164. 127d-09 IDWR (Morgan Creek 2009) 09/30/2012 09/30/2012
Transaction Complete M: 164. 214-09 TU-WWP (Beaver Creek - Wenatchee Basin) 09/30/2012
Transaction Complete N: 164. 159b-09 DRC (DWA Bank 2009) 09/30/2012
Transaction Complete O: 164. 04d-09 WWT (Beaver-Frazer #2 - 2009) 09/30/2012
Transaction Complete P: 164. 240-09 DRC (Trout and Mud Springs Creeks IS Lease 2009) 09/30/2012 09/30/2012
Transaction Complete Q: 164. 181-08 TFT (Fifteenmile Lease (Petroff)) 09/30/2012 09/30/2012
Transaction Complete R: 164. 183-08 WWT (Teanaway River No.7 & 6) 09/30/2012 09/30/2012
Transaction Complete S: 164. 78b-08 TFT (Fifteenmile Creek Streamflow) 09/30/2012 09/30/2012
Transaction Complete T: 164. NFWF- Water Transactions TBD 09/30/2012 09/30/2012
Outreach completed U: 99. NFWF - Public Presentations 09/30/2012 09/30/2012
Coordination Completed V: 189. NFWF - Coordination with State Water Resources' Agencies and other Partners 09/30/2012 09/30/2012
Solicitations occurred W: 119. NFWF - Transaction Solicitation 09/30/2012 09/30/2012
Maintenance complete X: 160. NFWF - Website and Database Maintenance 09/30/2012 09/30/2012
Work with contractors complete Y: 119. NFWF - Subcontract Development and Management 09/30/2012 09/30/2012
Coordination Completed Z: 189. NFWF - Qualified Local Entity Coordination and Support 09/30/2012 09/30/2012
Annual and monthly records kept AB: 119. NFWF - Task Invoicing and Record Keeping 09/30/2012 09/30/2012
Transactions Reviewed AC: 122. NFWF - Transaction Review 09/30/2012 09/30/2012
Completed annual report AD: 132. NFWF - Annual Report for FY 11 (Oct 1, 2010 - Sept 30, 2011) 09/30/2012
Transaction procedure modified and maintained AE: 119. NFWF - Transaction Proposals 09/30/2012 09/30/2012
Monitoring Plan Developed AF: 174. NFWF - Develop monitoring and compliance procedures 09/30/2012 09/30/2012
Transactions recommended AG: 119. NFWF - Transaction Recommendation 09/30/2012 09/30/2012
Sites visited AH: 119. NFWF - Site Visits 09/30/2012 09/30/2012
Environmental Compliance AI: 165. NFWF- Environmental Compliance for CBWTP 09/30/2012 09/30/2012
Data collected, captured, created and/or validated AJ: 157. NFWF - Collect / Generate / Validate field Data for Water Transactions 09/30/2012 09/30/2012
Contract updated AK: 119. NFWF - Transaction Updates 09/30/2012 09/30/2012
cost share documented AL: 119. NFWF - Cost Share 09/30/2012 09/30/2012
Coordination Completed AM: 189. NFWF- Qualified Local Entity Meetings and Information exchange 09/30/2012 09/30/2012
Procedures modified AN: 119. NFWF - Procedure Modification 09/30/2012 09/30/2012
Coordination Completed AO: 189. WWT - Regional Coordination 09/30/2012 09/30/2012
Reports Completed AP: 141. WWT - Provide reports to CBWTP 09/30/2012 09/30/2012
Outreach completed AQ: 99. WWT - Provide outreach and education - event/conference speaking 09/30/2012 09/30/2012
CBWTP processes administered AR: 119. WWT - Manage and Administer Projects as part of CBWTP 09/30/2012 09/30/2012
Coordination Completed AS: 191. WWT - Local watershed coordination 09/30/2012 09/30/2012
Recommendations implemented AT: 174. WWT - Strategic Planning 09/30/2012 09/30/2012
Water transactions identified and selected AU: 114. WWT - Identify and Select Water Transactions for FY 12 Development 09/30/2012 09/30/2012
Data collected, captured, created and generated AV: 157. WWT - Collect / Generate / Validate Field Data for Water Transactions 09/30/2012 09/30/2012
Water Transactions Developed AW: 154. WWT - Develop and Negotiate Water Right Transactions 09/30/2012 09/30/2012
Coordinate with QLE's and other developing water transaction AX: 189. TU-WWP - Regional Coordination 09/30/2012 09/30/2012
Provide annual report and monitoring records to NFWF AY: 141. TU-WWP - Provide reports to CBWTP 09/30/2012 09/30/2012
External communication AZ: 99. TU-WWP - Provide outreach and education - event/conference speaking 09/30/2012 09/30/2012
Project management complete BA: 119. TU-WWP - Manage and Administer Projects as part of CBWTP 09/30/2012 09/30/2012
Ensuring coordination with local partners BB: 191. TU-WWP - Local watershed coordination 09/30/2012 09/30/2012
Install flow measuring devices BC: 148. TU-WWP - Install flow measuring devices at each new project stream 09/30/2012 09/30/2012
Comply with all evaluation recommendations BD: 174. TU-WWP - Strategic Planning 09/30/2012 09/30/2012
Water transactions identified and selected BE: 114. TU-WWP - Identify and Select Water Transactions for FY12 Development 09/30/2012 09/30/2012
Water transaction checklist and associate documentation for proposed transactions BF: 154. TU-WWP - Develop water transaction for implementation 09/30/2012 09/30/2012
TU-WWP monitoring plan BG: 157. TU-WWP - Collect/Generate/Validate Field Data for Water Transactions 09/30/2012 09/30/2012
Coordination Completed BH: 189. WDOE - Regional Coordination 09/30/2012 09/30/2012
Recommendations implemented BI: 174. WDOE - Strategic Planning 09/30/2012 09/30/2012
Projects administered BJ: 119. WDOE - Manage and Administer Projects as part of CBWTP 09/30/2012 09/30/2012
Water transactions identified and selected BK: 114. WDOE - Identify and Select Water Transactions for FY 12 Development 09/30/2012 09/30/2012
Data collected, captured, created and generated BL: 157. WDOE - Collect/Generate/Validate Field Data for Water Transactions 09/30/2012 09/30/2012
Reports Completed BM: 141. WDOE - Provide reports to CBWTP 09/30/2012 09/30/2012
Coordination Completed BN: 191. TU-MWP - Local watershed coordination 09/30/2012 09/30/2012
Coordination Completed BO: 189. TU-MWP - Regional Coordination 09/30/2012 09/30/2012
Data collected, captured, created and generated BP: 157. TU-MWP - Collect/Generate/Validate Field Data for Water Transactions 09/30/2012 09/30/2012
Transactions Developed BQ: 154. TU-MWP - Develop water transaction for implementation 09/30/2012 09/30/2012
Gages Installed BR: 148. TU-MWP - Install Flow Measuring Device 09/30/2012
Reports Completed BS: 141. TU-MWP - Provide reports to CBWTP 09/30/2012 09/30/2012
Projects administered BT: 119. TU-MWP - Manage and Administer Projects as part of CBWTP 09/30/2012 09/30/2012
Water transactions identified and selected BU: 114. TU-MWP - Identify and Select Water Transactions for FY 12 Development 09/30/2012 09/30/2012
Outreach completed BV: 99. TU-MWP - Provide outreach and education - event/conference speaking 09/30/2012 09/30/2012
Coordinate with entities in the TFT region BW: 191. TFT - Local watershed coordination 09/30/2012 09/30/2012
Coordinate with entities in the CBWTP region BX: 189. TFT - Regional Coordination 09/30/2012 09/30/2012
Plan produced BY: 174. TFT - Strategic planning 09/30/2012 09/30/2012
Data collected, captured, created and generated BZ: 157. TFT - Collect / Generate / Validate field Data for Water Transactions 09/30/2012 09/30/2012
Water Transactions Proposed and/or Completed CA: 154. TFT - Develop and Negotiate Water Right Transactions 09/30/2012 09/30/2012
Gauge installed CB: 148. TFT - Install flow measuring device 09/30/2012 09/30/2012
Reports Completed CC: 141. TFT - Provide reports to CBWTP 09/30/2012 09/30/2012
Projects administered CD: 119. TFT - Manage and Administer Projects as part of CBWTP 09/30/2012 09/30/2012
FY 12 transactions initiated and/or complete CE: 114. TFT - Identify and Select Water Transactions for FY12 Development 09/30/2012 09/30/2012
Presentations and outreach completed CF: 99. TFT - Provide outreach and education - event/conference speaking 09/30/2012 09/30/2012
Coordination Completed CG: 189. OWRD - Regional Coordination 09/30/2012 09/30/2012
Recommendations implemented CH: 174. OWRD - Strategic Planning 09/30/2012 09/30/2012
Data collected, captured, created and generated CI: 157. OWRD - Collect/Generate/Validate Field Data for Water Transactions 09/30/2012 09/30/2012
Reports Completed CJ: 141. OWRD - Provide reports to CBWTP 09/30/2012 09/30/2012
Projects administered CK: 119. OWRD - Manage and Administer Projects as part of CBWTP 09/30/2012 09/30/2012
Coordinate with entities in the CFC region CL: 191. CFC - Local watershed coordination 09/30/2012 09/30/2012
Coordinate with entities in the CBWTP region CM: 189. CFC - Regional Coordination 09/30/2012 09/30/2012
Targets and plans developed CN: 174. CFC - Strategic Planning 09/30/2012 09/30/2012
Data collected, captured, created and generated CO: 157. CFC - Collect / Generate / Validate Field Data for Water Transactions 09/30/2012 09/30/2012
Water Transactions Proposed and/or Completed CP: 154. CFC - Develop water transactions for implementation 09/30/2012 09/30/2012
Gauges installed CQ: 148. CFC - Install flow measuring device at certain Project Streams 09/30/2012 09/30/2012
Reports Completed CR: 141. CFC - Provide reports to CBWTP 09/30/2012 09/30/2012
Managed and Administered CFC projects as part of the CBWTP CS: 119. CFC - Manage and Administer Project as part of CBWTP 09/30/2012 09/30/2012
Identify and Select Water Transactions for Development CT: 114. CFC - Identify and Select Water Transactions for FY12 Development 09/30/2012 09/30/2012
Presentations and outreach completed CU: 99. CFC - Provide outreach and education - event/conference speaking 09/30/2012 09/30/2012
Coordinate with entities in the IDWR region CV: 191. IDWR - Local watershed coordination 09/30/2012 09/30/2012
Participated in Meetings CW: 189. IDWR - Regional Coordination 09/30/2012 09/30/2012
Collecting, Generating, Validating data during FY '12 complete CX: 157. IDWR - Collect / Generate / Validate Field Data for Water Transactions 09/30/2012 09/30/2012
FY '12 work for water transactions completed CY: 154. IDWR - Develop and Negotiate water transactions 09/30/2012 09/30/2012
Gages Installed CZ: 148. IDWR - Install Flow Measuring Device 09/30/2012 09/30/2012
Reports Completed DA: 141. IDWR - Provide reports to CBWTP 09/30/2012 09/30/2012
Projects administered DB: 119. IDWR - Manage and Administer Projects and par of CBWTP 09/30/2012 09/30/2012
FY '12 transactions initiated and/or complete DC: 114. IDWR - Identify and Select Water Transactions for FY12 Development 09/30/2012 09/30/2012
Coordination Completed DD: 191. DRC - Local watershed coordination 09/30/2012 09/30/2012
Coordination Completed DE: 189. DRC - Regional Coordination 09/30/2012 09/30/2012
Recommendations implemented DF: 174. DRC - Strategic Planning 09/30/2012 09/30/2012
Data collected, captured, created and generated DG: 157. DRC - Collect / Generate / Validate Field Data for Water Transactions 09/30/2012 09/30/2012
Water Transactions researched DH: 154. DRC - Develop and Negotiate Water Right Transactions 09/30/2012 09/30/2012
Reports Completed DI: 141. DRC - Provide reports to CBWTP 09/28/2012 09/30/2012
Projects administered DJ: 119. DRC - Manage and Administer Projects as part of CBWTP 09/30/2012 09/30/2012
Water transactions identified and selected DK: 114. DRC - Identify and Select Water Transactions for FY12 Development 09/30/2012 09/30/2012
Presentations and outreach completed DL: 99. DRC - Provide outreach and education - event/conference speaking 09/30/2012 09/30/2012
Transaction Complete DM: 164. 313-11 DRC (TSID Main Canal Water Purchase) 09/30/2012 09/30/2012
Transaction Complete DN: 164. 267e-11 (WWT-Teanaway #18-Lease) 09/30/2012
Transaction Complete DO: 164. 86d-12 (CFC-Fire Creek 2011 Renewal) 09/30/2012 09/30/2012
Transaction Complete DP: 164. 92f-12 TFT (Lostine 3-Year Minimum Flow 2012) 09/30/2012 09/30/2012
Transaction Complete DQ: 164. 59c-12 (Birkmaier Lease Renewal) 09/30/2012 09/30/2012
Transaction Complete DR: 164. 115c-12 TFT (Voight - Standard Creek Mid-Season Shutoff) 09/30/2012 09/30/2012
Transaction Complete DS: 164. 71i-12 DRC (Annual Water Leasing Program 2012) 09/30/2012 09/30/2012
Transaction Complete DT: 164. 345-12 WATU (API_Entiat) 09/30/2012
Transaction Complete DU: 164. 340-12 IDWR (Bayhorse Creek - 2012) 09/30/2012 09/30/2012
Transaction Complete DV: 164. 194b-12 WATU (Manastash Creek, High Valley/Duncan No. 2) 09/30/2012 09/30/2012
Transaction Complete DW: 164. 351-12 TFT (Chouinard Instream Exchange) 09/30/2012
Transaction Complete DX: 164. 311-12 TFT (Berry Creek: Larson SSL'12) 09/30/2012 09/30/2012
Transaction Complete DY: 164. 319b-12 TFT (Fifteenmile Lease Bank: Kaser Split Season) 09/30/2012 09/30/2012
Transaction Complete DZ: 164. 35c-12 WWT (Teanaway No. 4 - 2012) 09/30/2012 09/30/2012
Transaction Complete EA: 164. 313b-12 DRC (TSID Main Canal Water Purchase) 09/30/2012 09/30/2012
Transaction Complete EB: 164. 359-12 TFT (Fifteenmile Lease Bank: Hanna Split Season) 09/30/2012 09/30/2012
Transaction Complete EC: 164. 360-12 TFT (Fifteenmile Lease Bank: Carnahan Full Season) 09/30/2012 09/30/2012
Transaction Complete ED: 164. 344-12 CFC (Upper Clark Fork River Combined Lease) 09/30/2012 09/30/2012
Transaction Complete EE: 164. 361-12 WATU (Yakima Basin Unnamed Creek, 10 yr. Donation 2011-2021) 09/30/2012
Transaction Complete EF: 164. 17b-12 WWT (Teanaway No. 12-2012) 09/30/2012 09/30/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Deschutes River Summer/Fall ESU
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 1 instance of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 174 Produce Plan
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 4 instances of WE 174 Produce Plan
  • 5 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 16 instances of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 2 instances of WE 174 Produce Plan
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 4 instances of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 148 Install Flow Measuring Device
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 4 instances of WE 174 Produce Plan
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 3 instances of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 2 instances of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Upper Willamette River ESU (Threatened)
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 164 Acquire Water Instream
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 1 instance of WE 164 Acquire Water Instream
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 4 instances of WE 164 Acquire Water Instream
Cutthroat Trout, Coastal (O. c. clarkii) - Southwest Washington/Columbia River ESU
  • 1 instance of WE 164 Acquire Water Instream
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 4 instances of WE 164 Acquire Water Instream
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 3 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 6 instances of WE 174 Produce Plan
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 21 instances of WE 164 Acquire Water Instream
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 2 instances of WE 174 Produce Plan
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 4 instances of WE 164 Acquire Water Instream
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 4 instances of WE 174 Produce Plan
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 4 instances of WE 164 Acquire Water Instream
Steelhead (O. mykiss) - Upper Willamette River DPS (Threatened)
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 164 Acquire Water Instream
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 6 instances of WE 164 Acquire Water Instream
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 2 instances of WE 164 Acquire Water Instream
Trout, Brook (Salvelinus fontinalis)
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
Trout, Bull (S. confluentus) (Threatened)
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 148 Install Flow Measuring Device
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 2 instances of WE 164 Acquire Water Instream
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 1 instance of WE 164 Acquire Water Instream
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 164 Acquire Water Instream

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 164 267d-11(WWT-Teanaway #18 - Consumptive Permanent) 10/01/2011
B 164 102c-11(Pole Creek 2011) 10/01/2011
C 164 312-11(Tumalo Feed Canal Piping --Phase 2) 10/01/2011
D 164 315-11(Olson Fifteenmile Purchase) 10/01/2011
E 164 299-10(Muir & McDonald Tannery) 10/01/2011
F 164 263c-11(Roberts Creek Wilderness Water Permanent Protection) 10/01/2011
G 164 263b-10(Roberts Creek Wilderness Water) 10/01/2011
H 164 290-10(WWT Rattlesnake No. 1 - 2010) 10/01/2011
I 164 301-10(Placid Creek Split Season Forbearance and Lease) 10/01/2011
J 164 159d-10(DWA Bank 2010b) 10/01/2011
K 164 159c-10(DWA Bank 2010) 10/01/2011
L 164 127d-09 IDWR (Morgan Creek 2009) 10/01/2011
M 164 214-09 TU-WWP (Beaver Creek - Wenatchee Basin) 10/01/2011
N 164 159b-09 DRC (DWA Bank 2009) 10/01/2011
O 164 04d-09 WWT (Beaver-Frazer #2 - 2009) 10/01/2011
P 164 240-09 DRC (Trout and Mud Springs Creeks IS Lease 2009) 10/01/2011
Q 164 181-08 TFT (Fifteenmile Lease (Petroff)) 10/01/2011
R 164 183-08 WWT (Teanaway River No.7 & 6) 10/01/2011
S 164 78b-08 TFT (Fifteenmile Creek Streamflow) 10/01/2011
T 164 NFWF- Water Transactions TBD 10/01/2011
U 99 NFWF - Public Presentations 10/01/2011
V 189 NFWF - Coordination with State Water Resources' Agencies and other Partners 10/01/2011
W 119 NFWF - Transaction Solicitation 10/01/2011
X 160 NFWF - Website and Database Maintenance 10/01/2011
Y 119 NFWF - Subcontract Development and Management 10/01/2011
Z 189 NFWF - Qualified Local Entity Coordination and Support 10/01/2011
AA 185 Periodic Status Reports for BPA 10/01/2011
AB 119 NFWF - Task Invoicing and Record Keeping 10/01/2011
AC 122 NFWF - Transaction Review 10/01/2011
AD 132 NFWF - Annual Report for FY 11 (Oct 1, 2010 - Sept 30, 2011) 10/01/2011
AE 119 NFWF - Transaction Proposals 10/01/2011
AF 174 NFWF - Develop monitoring and compliance procedures 10/01/2011
AG 119 NFWF - Transaction Recommendation 10/01/2011
AH 119 NFWF - Site Visits 10/01/2011
AI 165 NFWF- Environmental Compliance for CBWTP 10/01/2011
AJ 157 NFWF - Collect / Generate / Validate field Data for Water Transactions 10/01/2011
AK 119 NFWF - Transaction Updates 10/01/2011
AL 119 NFWF - Cost Share 10/01/2011
AM 189 NFWF- Qualified Local Entity Meetings and Information exchange 10/01/2011
AN 119 NFWF - Procedure Modification 10/01/2011
AO 189 WWT - Regional Coordination 10/01/2011
AP 141 WWT - Provide reports to CBWTP 10/01/2011
AQ 99 WWT - Provide outreach and education - event/conference speaking 10/01/2011
AR 119 WWT - Manage and Administer Projects as part of CBWTP 10/01/2011
AS 191 WWT - Local watershed coordination 10/01/2011
AT 174 WWT - Strategic Planning 10/01/2011
AU 114 WWT - Identify and Select Water Transactions for FY 12 Development 10/01/2011
AV 157 WWT - Collect / Generate / Validate Field Data for Water Transactions 10/01/2011
AW 154 WWT - Develop and Negotiate Water Right Transactions 10/01/2011
AX 189 TU-WWP - Regional Coordination 10/01/2011
AY 141 TU-WWP - Provide reports to CBWTP 10/01/2011
AZ 99 TU-WWP - Provide outreach and education - event/conference speaking 10/01/2011
BA 119 TU-WWP - Manage and Administer Projects as part of CBWTP 10/01/2011
BB 191 TU-WWP - Local watershed coordination 10/01/2011
BC 148 TU-WWP - Install flow measuring devices at each new project stream 10/01/2011
BD 174 TU-WWP - Strategic Planning 10/01/2011
BE 114 TU-WWP - Identify and Select Water Transactions for FY12 Development 10/01/2011
BF 154 TU-WWP - Develop water transaction for implementation 10/01/2011
BG 157 TU-WWP - Collect/Generate/Validate Field Data for Water Transactions 10/01/2011
BH 189 WDOE - Regional Coordination 10/01/2011
BI 174 WDOE - Strategic Planning 10/01/2011
BJ 119 WDOE - Manage and Administer Projects as part of CBWTP 10/01/2011
BK 114 WDOE - Identify and Select Water Transactions for FY 12 Development 10/01/2011
BL 157 WDOE - Collect/Generate/Validate Field Data for Water Transactions 10/01/2011
BM 141 WDOE - Provide reports to CBWTP 10/01/2011
BN 191 TU-MWP - Local watershed coordination 10/01/2011
BO 189 TU-MWP - Regional Coordination 10/01/2011
BP 157 TU-MWP - Collect/Generate/Validate Field Data for Water Transactions 10/01/2011
BQ 154 TU-MWP - Develop water transaction for implementation 10/01/2011
BR 148 TU-MWP - Install Flow Measuring Device 10/01/2011
BS 141 TU-MWP - Provide reports to CBWTP 10/01/2011
BT 119 TU-MWP - Manage and Administer Projects as part of CBWTP 10/01/2011
BU 114 TU-MWP - Identify and Select Water Transactions for FY 12 Development 10/01/2011
BV 99 TU-MWP - Provide outreach and education - event/conference speaking 10/01/2011
BW 191 TFT - Local watershed coordination 10/01/2011
BX 189 TFT - Regional Coordination 10/01/2011
BY 174 TFT - Strategic planning 10/01/2011
BZ 157 TFT - Collect / Generate / Validate field Data for Water Transactions 10/01/2011
CA 154 TFT - Develop and Negotiate Water Right Transactions 10/01/2011
CB 148 TFT - Install flow measuring device 10/01/2011
CC 141 TFT - Provide reports to CBWTP 10/01/2011
CD 119 TFT - Manage and Administer Projects as part of CBWTP 10/01/2011
CE 114 TFT - Identify and Select Water Transactions for FY12 Development 10/01/2011
CF 99 TFT - Provide outreach and education - event/conference speaking 10/01/2011
CG 189 OWRD - Regional Coordination 10/01/2011
CH 174 OWRD - Strategic Planning 10/01/2011
CI 157 OWRD - Collect/Generate/Validate Field Data for Water Transactions 10/01/2011
CJ 141 OWRD - Provide reports to CBWTP 10/01/2011
CK 119 OWRD - Manage and Administer Projects as part of CBWTP 10/01/2011
CL 191 CFC - Local watershed coordination 10/01/2011
CM 189 CFC - Regional Coordination 10/01/2011
CN 174 CFC - Strategic Planning 10/01/2011
CO 157 CFC - Collect / Generate / Validate Field Data for Water Transactions 10/01/2011
CP 154 CFC - Develop water transactions for implementation 10/01/2011
CQ 148 CFC - Install flow measuring device at certain Project Streams 10/01/2011
CR 141 CFC - Provide reports to CBWTP 10/01/2011
CS 119 CFC - Manage and Administer Project as part of CBWTP 10/01/2011
CT 114 CFC - Identify and Select Water Transactions for FY12 Development 10/01/2011
CU 99 CFC - Provide outreach and education - event/conference speaking 10/01/2011
CV 191 IDWR - Local watershed coordination 10/01/2011
CW 189 IDWR - Regional Coordination 10/01/2011
CX 157 IDWR - Collect / Generate / Validate Field Data for Water Transactions 10/01/2011
CY 154 IDWR - Develop and Negotiate water transactions 10/01/2011
CZ 148 IDWR - Install Flow Measuring Device 10/01/2011
DA 141 IDWR - Provide reports to CBWTP 10/01/2011
DB 119 IDWR - Manage and Administer Projects and par of CBWTP 10/01/2011
DC 114 IDWR - Identify and Select Water Transactions for FY12 Development 10/01/2011
DD 191 DRC - Local watershed coordination 10/01/2011
DE 189 DRC - Regional Coordination 10/01/2011
DF 174 DRC - Strategic Planning 10/01/2011
DG 157 DRC - Collect / Generate / Validate Field Data for Water Transactions 10/01/2011
DH 154 DRC - Develop and Negotiate Water Right Transactions 10/01/2011
DI 141 DRC - Provide reports to CBWTP 10/01/2011
DJ 119 DRC - Manage and Administer Projects as part of CBWTP 10/01/2011
DK 114 DRC - Identify and Select Water Transactions for FY12 Development 10/01/2011
DL 99 DRC - Provide outreach and education - event/conference speaking 10/01/2011
DM 164 313-11 DRC (TSID Main Canal Water Purchase) 09/06/2012
DN 164 267e-11 (WWT-Teanaway #18-Lease) 09/06/2012
DO 164 86d-12 (CFC-Fire Creek 2011 Renewal) 09/06/2012
DP 164 92f-12 TFT (Lostine 3-Year Minimum Flow 2012) 09/06/2012
DQ 164 59c-12 (Birkmaier Lease Renewal) 09/06/2012
DR 164 115c-12 TFT (Voight - Standard Creek Mid-Season Shutoff) 09/06/2012
DS 164 71i-12 DRC (Annual Water Leasing Program 2012) 09/06/2012
DT 164 345-12 WATU (API_Entiat) 09/06/2012
DU 164 340-12 IDWR (Bayhorse Creek - 2012) 09/06/2012
DV 164 194b-12 WATU (Manastash Creek, High Valley/Duncan No. 2) 09/06/2012
DW 164 351-12 TFT (Chouinard Instream Exchange) 09/06/2012
DX 164 311-12 TFT (Berry Creek: Larson SSL'12) 09/06/2012
DY 164 319b-12 TFT (Fifteenmile Lease Bank: Kaser Split Season) 09/06/2012
DZ 164 35c-12 WWT (Teanaway No. 4 - 2012) 09/06/2012
EA 164 313b-12 DRC (TSID Main Canal Water Purchase) 09/06/2012
EB 164 359-12 TFT (Fifteenmile Lease Bank: Hanna Split Season) 09/06/2012
EC 164 360-12 TFT (Fifteenmile Lease Bank: Carnahan Full Season) 09/06/2012
ED 164 344-12 CFC (Upper Clark Fork River Combined Lease) 09/06/2012
EE 164 361-12 WATU (Yakima Basin Unnamed Creek, 10 yr. Donation 2011-2021) 09/06/2012
EF 164 17b-12 WWT (Teanaway No. 12-2012) 09/06/2012