Contract 54945: 2000-035-00 EXP NPT NEWSOME CREEK WATERSHED RESTORATION
Project Number:
Title:
Newsome Creek Watershed Restoration
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
54945
Contract Title:
2000-035-00 EXP NPT NEWSOME CREEK WATERSHED RESTORATION
Contract Continuation:
Previous: Next:
45425: 200003500 EXP NPT NEWSOME CREEK WATERSHED RESTORATION
  • 63168: 2000-035-00 EXP NPT NEWSOME CREEK RESTORATION
Contract Status:
Closed
Contract Description:
Contract History:

Beginning in 2000, this project evolved from the 1996 Newsome Creek Haysfork Gloryhole Project (one of the original Clearwater Early Action projects).  This comprehensive restoration effort focuses on mitigating and restoring limiting factors to fisheries production.  The primary limiting factors are excessive sedimentation into the spawning and rearing areas of streams, and the lack of available habitat and habitat connectivity.  These limiting factors result from forest management activities, specifically road building (watershed has very high road densities), and mining.  

Completed contract work includes the completion of the Newsome Creek Ecosystem Analysis at the Watershed Scale (EAWS), road condition surveys completed for the entire watershed (approximately 220 miles), 23 miles of road decommissioning, 19.5 miles of road improvement, culvert/stream crossing inventories completed for all high priority sites, replacement of the Mare Creek & Mule Creek culverts, Newsome Creek Channel Restoration Feasibility Study, the completed NEPA process for the Newsome Creek Watershed Restoration Project, and completion of the final design for the Newsome Creek channel reconstruction and restoration.  Implementation of the floodplain and channel restoration began in 2011 with Reaches 5 & 4 being completed.

This project has been, and is still currently a part of the Nez Perce National Forest - Nez Perce Tribe Watershed Restoration Partnership.  Since the project’s inception, we have shared project planning, costs, and implementation responsibilities.  


Summary of FY 2012 & FY 2013 Contract Implementation:
                                                                                                                                                                                                                                              
FY 2012 & FY 2013 contract implementation will include the implementation of the Newsome Creek Stream Restoration, Stream Reaches 3 & 2, respectively, as well as improving the structure and function of the Haysfork Gloryhole sediment pond.  A new NEPA effort focused on additional road decommissioning & improvement will occur in FY 2012, with subsequent implementation scheduled for FY 2014.  The associated project implementation/effectiveness monitoring and evaluation of the stream restoration and overall stream habitat, road decommissioning & improvement, and previously replaced culverts will be completed in order to determine the success of the ongoing watershed restoration efforts.
Account Type(s):
Expense
Contract Start Date:
12/01/2011
Contract End Date:
11/30/2013
Current Contract Value:
$1,048,816
Expenditures:
$1,048,816

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Stephanie Bransford Nez Perce Tribe Yes Contract Manager stephanieb@nezperce.org (208) 983-0675
Stephanie Breeden Bonneville Power Administration No Interested Party sfbreeden@bpa.gov (503) 230-5192
Michelle Guay Bonneville Power Administration Yes Env. Compliance Lead mxguay@bpa.gov (503) 230-3459
David Kaplowe Bonneville Power Administration Yes COR djkaplowe@bpa.gov (503) 230-5365
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Heidi McRoberts Nez Perce Tribe No Supervisor heidim@nezperce.org (208) 621-3548
Michelle Roberts US Forest Service (USFS) No Technical Contact mmroberts@fs.fed.us (208) 983-4091
Scott Russell US Forest Service (USFS) No Technical Contact sarussell@fs.fed.us (208) 983-4092
Emmit Taylor, Jr. Nez Perce Tribe No Supervisor emmitt@nezperce.org (208) 621-3544
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance documentation submitted to BPA A: 165. Submit environmental compliance documentation to BPA & Lower Newsome Roads NEPA 11/30/2013 11/25/2013
Stream reach 2 tailings removed and re-graded B: 52. Newsome Creek Floodplain Restoration, Reach 2 11/30/2013 11/14/2013
Stream reach 2 channel reconstruction and restoration C: 30. Newsome Creek Channel Restoration, Reach 2 11/30/2013
Stream reaches 3 & 2 structure installation D: 29. Newsome Creek Structure Installation, Reaches 3 & 2 11/30/2013
Plant propagation for Newsome Creek stream restoration E: 47. Plant Propagation Newsome Stream Restoration 11/30/2013 07/31/2013
Sediment Trap/Pond Repaired F: 55. Haysfork Gloryhole Sediment Trap/Pond Restoration 11/15/2013 11/07/2013
Decommissioned roads data collected G: 157. Removed Roads Data Collection 11/30/2013 09/30/2013
Culvert data collected H: 157. Collect Data on Culverts and Bridges that have been Replaced 11/30/2013 09/30/2013
Stream habitat data collected I: 157. Stream Habitat Data Collection 11/30/2013 11/14/2013
Data analyzed and reports completed J: 162. Condition/Health of Newsome Creek 11/30/2013 11/25/2013
FY 2014 SOW package and FY 2012 & 2013 accrual estimates K: 119. Management, Coordination and Communication 09/13/2013 09/13/2013
Final FY 2011 annual report attached to this contract L: 132. Submit Annual Report for 12/1/10 - 11/30/11 01/31/2012 12/31/2012
Final FY 2012 annual report attached to this contract M: 132. Submit Annual Report for 12/1/11 - 11/30/12 11/30/2012 12/31/2012
Final FY 2013 annual report attached to this contract N: 132. Submit Annual Report for 12/1/12 - 11/30/13 11/30/2013 11/25/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 52 Remove Mine Tailings
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 52 Remove Mine Tailings
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Submit environmental compliance documentation to BPA & Lower Newsome Roads NEPA 12/01/2011
B 52 Newsome Creek Floodplain Restoration, Reach 2 07/06/2011
C 30 Newsome Creek Channel Restoration, Reach 2 07/06/2011
D 29 Newsome Creek Structure Installation, Reaches 3 & 2 07/06/2007
E 47 Plant Propagation Newsome Stream Restoration 07/06/2011
F 55 Haysfork Gloryhole Sediment Trap/Pond Restoration 07/06/2011
G 157 Removed Roads Data Collection 12/01/2011
H 157 Collect Data on Culverts and Bridges that have been Replaced 12/01/2011
I 157 Stream Habitat Data Collection 12/01/2011
J 162 Condition/Health of Newsome Creek 12/01/2011
K 119 Management, Coordination and Communication 12/01/2011
L 132 Submit Annual Report for 12/1/10 - 11/30/11 12/01/2011
M 132 Submit Annual Report for 12/1/11 - 11/30/12 12/01/2011
N 132 Submit Annual Report for 12/1/12 - 11/30/13 12/01/2011
O 185 Periodic Status Reports for BPA 12/01/2011