Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 55843: 1994-018-06 EXP TUCANNON STREAM & RIPARIAN REST
Project Number:
Title:
Tucannon Stream and Riparian Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Tucannon 100.00%
Contract Number:
55843
Contract Title:
1994-018-06 EXP TUCANNON STREAM & RIPARIAN REST
Contract Continuation:
Previous: Next:
50146: 1994-018-06 EXP TUCANNON STREAM & RIPARIAN REST
  • 59663: 1994-018-06 EXP TUCANNON STREAM AND RIPARIAN RESTORATION
Contract Status:
Closed
Contract Description:
Implement habitat protectionn, enhancement and recovery strategies to support Tucannon Subbasin Plan and Snake River Salmon Recovery Plan identified ESA focal, cultural significant and species of interest recovery in the Tucannon Subbasin.  Tucannon Stream and Riparian Protection, Enhancement and Restoration Project, implemented by the Columbia Conservation District , will address riparian recovery/maintenance, flood plain connectivity and instream habitat quantity and diversity, the primary aquatic habitat limiting attributes identified thru EDT analysis and Geomorphic Assessment and Habitat Restoration Study throughout the Tucannon Subbasin.

Riparian recovery/maintenance, flood plain connectivity and instream habitats are critical management objectives addressing the broadest diversity of limiting attributes in identified priority restoration and protection geographic areas will be addressed.  Biological objective diversity, reduced embeddedness, LWD recruitment, primary pools, high flow refuga, riparian recovery and temperature will be addressed with this strategy and benefit ESA and cultural significant focal species, spring and fall Chinook, steelhead and bull trout during their respective key life stages throughout the watershed.  Accumulated restoration/protection geographic areas, Pataha/Marengo thru Mountain Tucannon matches NOAA's  Major Spawning Aggregation designation, (MSA), Pataha/Marengo to Tucannon Mouth and Lower Pataha match NOAA'a Minor Spawning Aggregation designations (mSA).
Instream habitat quantity and diversity project focus is within priority protection/restoration geographic areas which cover the entire watershed due to species and species specific life cycle needs.  Projects, implementing identified strategies, address various biological objectives; sediment reduction, primary pools, flood plain connectivity and LWD recruitment/placement.  Project implementation will provide habitat benefits to spring/fall Chinook, steelhead and bull trout during their respective varied life stage needs throughout the watershed.

Program administration functions include contract reporting requirements, participation and coordination with regional recovery and resource management planning efforts, Snake River Salmon Recovery Plan, Washington Department of Ecology 2514 Watershed and TMDL planning, regional M&E planning and Subbasin Plan evaluation and adaptive management planning, project scoping, planning and implementation management.

Monitoring and evaluation efforts for projects and watershed conditions will be a cooperative approach with contract services with USFS, Pomeroy Ranger District and local WDFW staff.
Account Type(s):
Expense
Contract Start Date:
01/01/2012
Contract End Date:
12/31/2012
Current Contract Value:
$341,462
Expenditures:
$341,462

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Terry Bruegman Columbia Conservation District (SWCD) No Contract Manager tb-ccd@daytonwa.net (509) 382-4273x102
Andre L'Heureux Bonneville Power Administration Yes COR allheureux@bpa.gov (503) 230-4482
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Debra Nordheim Columbia Conservation District (SWCD) Yes Contract Manager dn-ccd@daytonwa.net (509) 382-4273x101
Nicole Rutherford Bonneville Power Administration No Interested Party narutherford@bpa.gov (503) 230-4320
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Projects managed well B: 119. Project implementation 12/31/2012 12/28/2012
List of viable Habitat Enhancement projects for potential implementation C: 114. Develop and/or update potential project lists 09/14/2012 09/14/2012
Meetings, tours, presentations D: 99. Community Involvement in Habitat Restoration 11/30/2012 11/30/2012
Documentation necessary for cultural and ESA compliance E: 165. Project Environmental Compliance 12/31/2012 12/28/2012
Annual Report for FY11 F: 132. Annual Report for Oct. 1, 2010 - Sept. 30, 2011 11/16/2012 11/30/2012
10% conceptual drawings of priority habitat improvement sites G: 175. Priority Habitat improvement designs 10/31/2012 11/30/2012
Sediment data collected & available H: 157. ISCO Sediment Sampling 12/31/2012 12/28/2012
Coordinate Tucannon Watershed Program to improve habitat I: 191. Coordinate Tucannon Watershed Program 12/31/2012 12/28/2012
Vegetate 9.25 acres of trees and shrubs J: 47. Establish Riparian Plant Community - Blow-out/Pond Site 06/21/2012 06/21/2012
Vegetate 3.75 acres of trees and shrubs K: 47. Establish Riparian Plant Community - Dike/Other Site 06/21/2012 06/21/2012
Re-establish Riparian Fence L: 40. Re-establish Riparian Fence 11/15/2012 12/28/2012
Construct riparian fence M: 40. Install New Riparian Fence 07/31/2012 07/31/2012
Vegetate 1.50 acres of trees and shrubs N: 47. Point Bar (elevated cobble) Site 12/20/2012 12/18/2012
Re-contour remaining floodplain point bar elevations (final phase of 2-year dike setback project) O: 180. Point Bar - Re-contour Floodplain Habitat 11/15/2012 11/27/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 40 Install Fence
  • 3 instances of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 2 instances of WE 40 Install Fence
  • 3 instances of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Bull (S. confluentus) (Threatened)
  • 2 instances of WE 40 Install Fence
  • 3 instances of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 10/01/2011
B 119 Project implementation 10/01/2011
C 114 Develop and/or update potential project lists 11/21/2012
D 99 Community Involvement in Habitat Restoration 10/01/2011
E 165 Project Environmental Compliance 10/01/2011
F 132 Annual Report for Oct. 1, 2010 - Sept. 30, 2011 10/01/2011
G 175 Priority Habitat improvement designs 04/11/2012
H 157 ISCO Sediment Sampling 02/08/2012
I 191 Coordinate Tucannon Watershed Program 10/01/2011
J 47 Establish Riparian Plant Community - Blow-out/Pond Site 04/11/2012
K 47 Establish Riparian Plant Community - Dike/Other Site 04/11/2012
L 40 Re-establish Riparian Fence 02/08/2012
M 40 Install New Riparian Fence 04/11/2012
N 47 Point Bar (elevated cobble) Site 04/11/2012
O 180 Point Bar - Re-contour Floodplain Habitat 04/11/2012