Province | Subbasin | % |
---|---|---|
Blue Mountain | Grande Ronde | 100.00% |
Previous: | Next: |
---|---|
n/a |
* Expenditures data includes accruals and are based on data through 29-Feb-2024.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Mary Estes | Grande Ronde Model Watershed Foundation | No | Administrative Contact | mary@grmw.org | (541) 663-0570 |
Daniel Gambetta | Bonneville Power Administration | No | Env. Compliance Lead | dagambetta@bpa.gov | (503) 230-3493 |
Tracy Hauser | Bonneville Power Administration | Yes | COR | tlhauser@bpa.gov | (503) 230-4296 |
Coby Menton | Grande Ronde Model Watershed Foundation | Yes | Contract Manager | rcoby@grmw.org | (541) 426-0389 |
Jeff Oveson | Grande Ronde Model Watershed Foundation | No | Supervisor | jeff@grmw.org | (541) 663-0570 |
David Roberts | Bonneville Power Administration | Yes | F&W Approver | daroberts@bpa.gov | (503) 230-4511 |
Jesse Steele | Grande Ronde Model Watershed Foundation | No | Interested Party | jesse@grmw.org | (541) 663-0570 |
Connar Stone | Grande Ronde Model Watershed Foundation | No | Interested Party | connar@grmw.org | (541) 663-0570 |
Kristi Van Leuven | Bonneville Power Administration | Yes | Contracting Officer | kjvleuven@bpa.gov | (503) 230-3605 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Complete |
---|---|---|---|---|
Project permits and environmental compliance documents and authorizations. | A: 165. Environmental Compliance for City of Lostine Diversion Structure Replacement Project. | 05/30/2012 | 05/30/2012 | |
Diversion replacement design package | B: 175. Field Survey and Final Design Package for City of Lostine Diversion Structure Project. | 03/01/2012 | 03/01/2012 | |
City of Lostine Diversion Structure replaced. | C: 84. Replace existing diversion on the Lostine River | 12/31/2012 | 12/31/2012 | |
Lostine River regraded to accommodate fish passage | D: 184. Regrade Lostine River Channel Below Point of Diversion | 12/31/2012 | 12/31/2012 | |
Woody material added to the Lostine River Channel channel. | E: 29. Install large woody material in Lostine River Channel | 12/31/2012 | 12/31/2012 | |
Project Management | F: 119. Project Management and Administration | 02/28/2013 | 02/28/2013 | |
Attach Progress Report in Pisces | G: 132. Completion Report March 2012 - February 2013 | 01/14/2013 | 02/12/2013 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Environmental Compliance for City of Lostine Diversion Structure Replacement Project. | 03/01/2012 | ||||||
B | 175 | Field Survey and Final Design Package for City of Lostine Diversion Structure Project. | 03/01/2012 | ||||||
C | 84 | Replace existing diversion on the Lostine River | 05/21/2012 | ||||||
D | 184 | Regrade Lostine River Channel Below Point of Diversion | 05/21/2012 | ||||||
E | 29 | Install large woody material in Lostine River Channel | 05/21/2012 | ||||||
F | 119 | Project Management and Administration | 03/01/2012 | ||||||
G | 132 | Completion Report March 2012 - February 2013 | 03/01/2012 | ||||||
H | 185 | Periodic Status Reports for BPA | 03/01/2012 |