Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 215: 2009-003-00 EXP UPPER COLUMBIA STAFF AND SUBS
Project Number:
Title:
Upper Columbia Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 20.00%
Methow 40.00%
Wenatchee 40.00%
Contract Number:
56662 REL 215
Contract Title:
2009-003-00 EXP UPPER COLUMBIA STAFF AND SUBS
Contract Continuation:
Previous: Next:
56662 REL 191: 2009-003-00 EXP UPPER COLUMBIA HABITAT STAFF & SUBS
Contract Status:
Issued
Contract Description:
This contract will replace Contract 56662 REL 191 to cover YN Fisheries UCHRP staff costs and on-call service subcontract costs over a 2 year time frame.  In addition, all property for the UCHRP will be reported under this contract.  This Contract includes all wages and overhead expenses of Yakama Nation staff working on accounting, budgeting, reporting, restoration project management, and subcontract management during the 2 year time frame.  The initial 2 year contract will only include cost obligations from June 1, 2020 to May 31, 2021.  Cost obligations from June 1, 2021 to March 30, 2022 will be added to this Contract through a CCR in the 2nd quarter of FY21.

The program-wide on-call subcontract work elements provided in this Contract allow the Yakama Nation to more efficiently conduct subcontracting for redundant yet critical site assessment, design, and post construction maintenance activities across our work region, dramatically increasing the efficiency with which the Yakama Nation can produce actual individual restoration projects that yield habitat mitigation credits under the FCRPS BiOP.  Topographic surveys, large wood haul, groundwater testing, native plant revegetation planning, and providing maintenance of vegetation and habitat structures on completed project sites are all restoration related activities that must be completed on all or most restoration project sites, yet these project elements are not the core restoration project elements that actually produce mitigation credits under the FCRPS BiOP.  Given the large number of projects Yakama Nation Fisheries is developing simultaneously, if the program were to break apart these redundant project support activities as separate work elements for each restoration project site, the Yakama Nation Accord contracts would be infinitely more complex and overloaded with redundant WEs and a confusion of related milestones and milestone dates, making it very hard to produce and review CRs and CCRs.  Also, this would likely require the Yakama Nation to request more CCRs more often as these critical yet redundant work elements become needed on individual projects at differing times in the project development and completion process.  Additionally, the Tribal contracting process would be overrun and dramatically slowed down by a need to constantly produce and modify subcontracts for redundant services with the same contractors on different work sites.  These effects would greatly impede the Yakama Nation's ability to produce the quantity of habitat restoration projects within the time frame of the Accords.

This "Staff and Subs" Contract will provide all needed support services for the YN Fisheries UCHRP to continue operations in the Upper Columbia Basin from June 1, 2020 to March 30, 2022.  Detailed work elements for implementation of specific restoration actions that are directly applicable to mitigation credits under the FCRPS BiOP are provided in separate Accord Contracts known as "Habitat Restoration Contracts".

CCR 45578 Update - Cost obligations from June 1, 2021 to May 31, 2022 are being added to this Contract through CCR 45578.  This CCR includes extension of the contract end date to May 31, 2022, inclusion of 2nd year monies for existing staff payroll and subcontractors to continue performance of needed support for on-going restoration projects being implemented under REL 226.
Account Type(s):
Expense
Contract Start Date:
06/01/2020
Contract End Date:
05/31/2022
Current Contract Value:
$6,565,467
Expenditures:
$5,252,373

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Victoria Bohlen Bonneville Power Administration Yes COR vlbohlen@bpa.gov (503) 230-3506
Jason Breidert Yakama Confederated Tribes Yes Technical Contact brej@yakamafish-nsn.gov (509) 860-5351
Chris Butler Yakama Confederated Tribes Yes Technical Contact butlerc@yakamafish-nsn.gov (509) 449-8215
Christopher Clemons Yakama Confederated Tribes Yes Technical Contact clec@yakamafish-nsn.gov (509) 881-5746
Joseph Connor Bonneville Power Administration Yes F&W Approver jwconnor@bpa.gov (503) 230-3172
Annet Dillman Yakama Confederated Tribes No Administrative Contact dila@yakamafish-nsn.gov (509) 865-2255
Minda Donnelly Department of Energy - IGE No Interested Party minda.donnelly@doe.gov (702) 295-0874
Madeleine Eckmann Yakama Confederated Tribes Yes Technical Contact eckm@yakamafish-nsn.gov (509) 449-2091
Tamera Hoptowit Yakama Confederated Tribes No Administrative Contact Hopta@yakamafish-nsn.gov (509) 865-5121x6354
Tana Hoptowit Yakama Confederated Tribes Yes Administrative Contact hopt@yakamafish-nsn.gov (509) 865-5121x6318
Jarred Johnson Yakama Confederated Tribes Yes Technical Contact johj@yakamafish-nsn.gov (509) 881-1462
Jennifer McKenna Bonneville Power Administration No CO Assistant jmmckenna@bpa.gov (503) 314-8915
Crystal Miller Department of Energy - IGE No Interested Party crystal.miller@doe.gov (702) 295-0779
Brandon Rogers Yakama Confederated Tribes Yes Supervisor rogb@yakamafish-nsn.gov (509) 949-4109
Hans Smith Yakama Confederated Tribes Yes Contract Manager h.smith@methownet.com (509) 449-2750
Emily Wiegert Department of Energy - IGE No Interested Party emily.wiegert@doe.gov (123) 456-7890
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Jae Woo Department of Energy - IGE No Interested Party jae.woo@doe.gov (702) 295-0874


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Annual progress report, uploaded to Pisces B: 132. Annual Progress Report for 2020 05/31/2022
Completed Annual Report C: 132. Annual Progress Report for 2021 05/31/2022
Effective implementation management and timely contract administration D: 119. Manage personnel, property and subcontracts for overall UCHRP 05/31/2022 05/31/2022
Collect topographic survey and create hydraulic model E: 114. UC Survey and hydraulic modeling Contract - 2010-58 05/31/2022 05/31/2022
Wetland Surveys and Reports F: 165. UC Wetland Delineation 2010-44 05/31/2022 05/31/2022
Rare Plant Surveys and Report G: 165. UC Rare Plant Surveys 2010-44 05/31/2022 05/31/2022
Coordinate private land access in priority reaches H: 191. Outreach Supporting Habitat Restoration Activities (Methow) 2009-22 05/31/2022 05/31/2022
Landowner Outreach completed I: 191. CCD Landowner Outreach & Coordination - 2010-60 05/31/2022 05/31/2022
Chelan NRD Support/Outreach for Wenatchee Habitat Projects J: 191. Outreach Supporting Habitat Restoration Activities (Wenatchee) CCNRD 2012-98 05/31/2022 05/31/2022
Conduct land pre-acquisition activities to determine suitability of land purchases for the UCHRP. K: 172. UC Lands Acquisition Support 2012-104 05/31/2022 05/31/2022
Conduct Appraisals L: 172. UC Appraisals 2018-197 05/31/2022 05/31/2022
Produce Survey M: 172. UC Professional Land Survey Contract 2015-128 05/31/2022 05/31/2022
Produce Cultural Surveys N: 165. UC Cultural Resource Contract 2014-118 05/31/2022 05/31/2022
Provide Scientific Support for YN UCHRP Projects O: 122. UC On-Call Scientific Support (Review and Recommendation) 2016-159 05/31/2022 05/31/2022
Provide HAZ MAT Inspection P: 165. UC On-Call Haz Mat Review 2016-158 05/31/2022 05/31/2022
Provide Coordination on Restoration Work Proposed by the YN on WDFW Land Q: 122. WDFW MOU Review 2016-157 05/31/2022 05/31/2022
Produce Restoration Designs R: 175. UC Small Project Design - 2010-57 05/31/2022 05/31/2022
Post Implementation Monitoring of Habitat Projects S: 115. UC Post Implementation Field Monitoring 2012-85 05/31/2022 05/31/2022
Engineering Support Services T: 122. On-call Engineering Support Services 2009-17 05/31/2022 05/31/2022
Groundwater pump tests complete U: 148. Install Piezometer Wells and Conduct Groundwater Pump Tests 2010-37 05/31/2022 05/31/2022
LWD Procurement and Hauling V: 29. Large Wood Procurement - 2010-59 05/31/2022 05/31/2022
Large Wood Stockpile Locations Secured by Rental Agreements W: 29. UC Large Wood Storage 2015-131 05/31/2022 05/31/2022
Produce Native Plant Restoration and Soil Bio-Engineering Design, Materials, and Installation X: 47. UC Native Plant Restoration and Soil Bio-Engineering - 2010-62 05/31/2022 05/31/2022
Vegetation Maintenance Y: 198. Methow Subbasin Vegetation Maintenance - 2010-43 05/31/2022 05/31/2022
Vegetation Maintenance Z: 198. Vegetation Maintenance Wenatchee & Entiat 2012-84 05/31/2022 05/31/2022
Conduct Geo-Tech Services AA: 186. UC Sheet Pile Geo-Tech 2012-83 05/31/2022 05/31/2022
On-Call Construction Services AB: 186. UC On-Call Construction Services 2012-82 05/31/2022 05/31/2022
Create and Install Habitat Restoration Signs AC: 188. UC Project Signage 2012-95 05/31/2022 05/31/2022
Inspect and repair wells AD: 82. UC On-Call Well Inspection and Repair 2016-156 05/31/2022 05/31/2022
Hazard Tree Removal AE: 199. UC Hazard Tree Removal 2018-195 05/31/2022 05/31/2022
Create Hog Fuel Stockpiles AF: 47. UC Wood Mulch Production 2019-204 05/31/2022 05/31/2022
Acquisition of Fawn Creek Property AG: 172. Fawn Creek Acquisition 2018-200 02/28/2021 03/31/2021
Acquisition of Chewuch Floodplain Property AH: 172. Chewuch Floodplain Acquisition 2019-202 02/28/2021 03/31/2021
Acquisition of the Scaffold Camp #2 Property AI: 172. Scaffold Camp #2 Acquisition - 2019-211 05/31/2022

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 2 instances of WE 198 Maintain Vegetation
  • 1 instance of WE 199 Remove Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 47 Plant Vegetation
  • 6 instances of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 82 Install Well
  • 1 instance of WE 148 Install Flow Measuring Device
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 198 Maintain Vegetation
  • 1 instance of WE 199 Remove Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 47 Plant Vegetation
  • 6 instances of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 82 Install Well
  • 1 instance of WE 148 Install Flow Measuring Device

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 132 Annual Progress Report for 2020
C 132 Annual Progress Report for 2021
D 119 Manage personnel, property and subcontracts for overall UCHRP
E 114 UC Survey and hydraulic modeling Contract - 2010-58
F 165 UC Wetland Delineation 2010-44
G 165 UC Rare Plant Surveys 2010-44
H 191 Outreach Supporting Habitat Restoration Activities (Methow) 2009-22
I 191 CCD Landowner Outreach & Coordination - 2010-60
J 191 Outreach Supporting Habitat Restoration Activities (Wenatchee) CCNRD 2012-98
K 172 UC Lands Acquisition Support 2012-104
L 172 UC Appraisals 2018-197
M 172 UC Professional Land Survey Contract 2015-128
N 165 UC Cultural Resource Contract 2014-118
O 122 UC On-Call Scientific Support (Review and Recommendation) 2016-159
P 165 UC On-Call Haz Mat Review 2016-158
Q 122 WDFW MOU Review 2016-157
R 175 UC Small Project Design - 2010-57 03/23/2020
S 115 UC Post Implementation Field Monitoring 2012-85 03/23/2020
T 122 On-call Engineering Support Services 2009-17
U 148 Install Piezometer Wells and Conduct Groundwater Pump Tests 2010-37 03/23/2020
V 29 Large Wood Procurement - 2010-59 03/23/2020
W 29 UC Large Wood Storage 2015-131 03/23/2020
X 47 UC Native Plant Restoration and Soil Bio-Engineering - 2010-62 03/23/2020
Y 198 Methow Subbasin Vegetation Maintenance - 2010-43 03/23/2020
Z 198 Vegetation Maintenance Wenatchee & Entiat 2012-84 05/12/2022
AA 186 UC Sheet Pile Geo-Tech 2012-83 03/23/2020
AB 186 UC On-Call Construction Services 2012-82 03/23/2020
AC 188 UC Project Signage 2012-95 03/23/2020
AD 82 UC On-Call Well Inspection and Repair 2016-156 03/23/2020
AE 199 UC Hazard Tree Removal 2018-195 03/23/2020
AF 47 UC Wood Mulch Production 2019-204 03/23/2020
AG 172 Fawn Creek Acquisition 2018-200
AH 172 Chewuch Floodplain Acquisition 2019-202
AI 172 Scaffold Camp #2 Acquisition - 2019-211