Contract 58452: 2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
Project Number:
Title:
Snake River Sockeye Captive Propagation
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
58452
Contract Title:
2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
Contract Continuation:
Previous: Next:
54436: 2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
  • 62932: 2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
Contract Status:
Closed
Contract Description:
This contract is to provide Operation and Maintenance funding needed to maintain existing hatchery grounds, residence, and equipment; document construction activities during construction phase of Springfield Hatchery; provide needed telephone, electric, and internet access. Springfield Hatchery Manager salary and required travel costs for Manager and Conservation Hatchery Supervisor are included in this contract.
Account Type(s):
Expense
Contract Start Date:
10/01/2012
Contract End Date:
09/30/2013
Current Contract Value:
$186,361
Expenditures:
$186,361

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Permits/Authorizations Acquired A: 165. Obtain Permits and submit copies to BPA NEPA group 09/30/2013 08/28/2013
Maintain Springfield Fish Hatchery B: 61. Maintenance of grounds and buildings at Springfield Hatchery 09/30/2013 09/06/2013
Provide documentation of construction activities C: 100. Record and Document Construction Activities 09/30/2013 09/05/2013
Prepare Facility Maintenance Plan D: 174. Prepare Written Building and Vehicle Maintenance Schedule 01/21/2013 01/17/2013
Attendance at program essential and SBSTOC meetings. E: 189. Quarterly SBSTOC coordination meeting and program essential meetings. 09/30/2013 09/10/2013
Attach Progress Report in Pisces F: 132. Submit Progress Report for the period (OCT 2011) to (SEP 2012) 07/31/2013
Fulfill all administrative tasks with quality products and in a timely manner. G: 119. Submit FY14 funding package to BPA 09/30/2013 09/30/2013
Test and Verify Water Supply Operational Procedures I: 61. Verify Start-up, Shut down, and Operational Procedures 09/30/2013 09/24/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 2 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Permits and submit copies to BPA NEPA group 10/01/2012
B 61 Maintenance of grounds and buildings at Springfield Hatchery 06/13/2012
C 100 Record and Document Construction Activities 10/01/2012
D 174 Prepare Written Building and Vehicle Maintenance Schedule 10/01/2012
E 189 Quarterly SBSTOC coordination meeting and program essential meetings. 10/01/2012
F 132 Submit Progress Report for the period (OCT 2011) to (SEP 2012) 10/01/2012
G 119 Submit FY14 funding package to BPA 10/01/2012
H 185 Periodic Status Reports for BPA 10/01/2012
I 61 Verify Start-up, Shut down, and Operational Procedures 06/13/2012