Contract 61147: 2002-008-00 EXP RECONNECT FLDPLN TO KOOTENAI RIVER
Project Number:
Title:
Reconnect Kootenai River with Historic Floodplain
Stage:
Closed
Area:
Province Subbasin %
Mountain Columbia Kootenai 100.00%
Contract Number:
61147
Contract Title:
2002-008-00 EXP RECONNECT FLDPLN TO KOOTENAI RIVER
Contract Continuation:
Previous: Next:
57841: 2002-008-00 EXP RECONNECT FLDPLN TO KOOTENAI RIVER
  • 65638: 2002-008-00 EXP RECONNECT FLDPLN TO KOOTENAI RIVER
Contract Status:
Closed
Contract Description:
Reconnect Kootenai River with Historic Floodplain (2002-008-00)
Contract Period: 5/1/2013 – 4/30/2014

Natural resources, including flora and fauna, have shaped the culture of the Kootenai Tribe of Idaho (Tribe) for thousands and thousands of years. The aboriginal territories of the Kootenai Tribal peoples (Ktunaxa) were far reaching with traditional hunting, fishing, and gathering activities extending into British Columbia, Western Montana, and all of North Idaho.

Many of the areas and resources traditionally used by the Tribe have been lost; anadromous salmonids no longer journey up the Upper Columbia River and its tributaries, and wapato no longer blooms on the drained wetlands. Even today, the Kootenai white sturgeon (Acipenser transmontanus) and burbot (Lota lota) struggle to exist in the Kootenai River.

It is the goal of the Tribe to promote full mitigation of the impacts suffered by the people of the Kootenai Tribe of Idaho and the fish, water, wildlife, and plant resources which they depended, as a direct and indirect result of the development and operation of the Federal Columbia River Power System (FCRPS). The Reconnect project is but one component of a suite of projects that are conserving, restoring, and managing various aspects of the lower Kootenai River ecosystem. No single activity is sufficient to recover and rebuild fish and wildlife species in the lower Kootenai River subbasin.

This project is tied strongly to the scientific principles of the Northwest Power and Conservation Council (NPCC) Columbia Basin Fish and Wildlife Program (NPPC 2009); ecosystem function and ecological management are keys to the directed project objectives. Moreover, this project framework aims to assess, characterize and address many of the limiting factors and objectives identified in the Kootenai Subbasin Plan (KTOI and MFWP 2004).

The primary goal of the Reconnect Project is to investigate and implement actions that enhance biological, terrestrial and aquatic habitats by reconnecting the Kootenai River with its historic floodplain. The Tribe addresses the loss of floodplain habitats, wetlands, stream channels, and riparian habitat, where restoration actions are currently associated with wildlife mitigation projects that focus on avian and terrestrial populations as well as aquatic species. The Reconnect Project is one component of a complex matrix of projects that are designed to assess, conserve, restore, and manage various aspects of the Kootenai River ecosystem, including the fundamental processes that are necessary for the production of all other ecological systems.

To date, the Reconnect Project has examined the feasibility of reconnecting floodplain habitats with the mainstem Kootenai River and determined it to be feasible and beneficial for the health of the ecosystem. Major project components completed include: the identification and initial feasibility of reconnecting six tributaries to the mainstem Kootenai River; collection and analysis of baseline productivity data in existing floodplain water bodies; the examination of several restoration alternatives for the Ball Creek Ranch site; the completion of Ball Creek reconnection design plans; and the identification of restoration areas for sturgeon refugia. Since 2002, the Project has distributed data to other Bonneville Power Administration (BPA)-funded projects within the Kootenai Subbasin and has provided a variety of data-sharing benefits. For example, the Tribe collected LiDAR data that was later utilized in other BPA-funded projects. In addition, various aspects of hydraulic and hydrologic models were co-created with other projects to simulate water surface elevations, velocities and hydraulic parameters to estimate the extent of floodplain inundation.

The Reconnect project plays a critical role in the assessment and restoration of ecosystem services and ecological functions within the subbasin. The Reconnect project also acts as the feasibility and restoration arm of the Kootenai River Operational Mitigation and Evaluation (BPA# 200201100), and Albeni Falls Wildlife Mitigation Projects (BPA# 199206105).

The proposed biological objectives for 2013 – 2014 include the following:
- Alternatives analysis assessment of Nimz Ranch floodplain restoration;
- Invasive species control treatments;
- Facilitate Reconnect Technical Review Team (TRT);
- Produce GIS-based prioritization tool framework ;
- Initial designs and specifications of Nimz Ranch floodplain restoration based on development of a project prioritization tool;
- Remove Channel Blockage (Earthen Plug) to Enhance Nimz Ranch Wetlands
Account Type(s):
Expense
Contract Start Date:
05/01/2013
Contract End Date:
04/30/2014
Current Contract Value:
$322,422
Expenditures:
$322,422

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
John Barco III Bonneville Power Administration No Interested Party jwbarco@bpa.gov (503) 230-3223
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Sue Ireland Kootenai Tribe Yes Supervisor ireland@kootenai.org (208) 267-3620
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Norm Merz Kootenai Tribe Yes Technical Contact merz@kootenai.org (208) 267-3620x555
Edna Runyan Kootenai Tribe Yes Administrative Contact edna@kootenai.org (208) 267-3620
Scott Soults Kootenai Tribe Yes Contract Manager soults@kootenai.org (208) 267-3620
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Alternatives Analysis Assessment of Nimz Ranch Floodplain Restoration B: 115. Alternatives Analysis Assessment of Nimz Ranch Floodplain Restoration 04/30/2014 04/30/2014
Reconnect Technical Review Team C: 122. Reconnect Technical Review Team 04/30/2014 04/30/2014
Produce GIS-Based Prioritization Tool Plan D: 174. Produce GIS-Based Prioritization Tool Plan 04/30/2014 04/30/2014
Kootenai Watershed Coordination E: 191. Kootenai Watershed Coordination 04/30/2014 04/30/2014
Initial Designs and Specifications of Nimz Ranch Floodplain Restoration F: 175. Initial Designs and Specifications of Nimz Ranch Floodplain Restoration 04/30/2014 04/30/2014
Plan, Design and Coordinate Project w/ Interdepartmental Divisions and Outside Entities G: 189. Plan, Design and Coordinate Project w/ Interdepartmental Divisions and Outside Entities 04/30/2014 04/30/2014
Produce Environmental Compliance Documentation H: 165. Produce Environmental Compliance Documentation and Permitting 04/30/2014 04/30/2014
Oversight and Administer Project Activities I: 119. Oversight and Administer Project Activities 04/30/2014 04/30/2014
Attach Progress Report in Pisces J: 132. Submit Annual Report for part of FY'12 and including a portion of FY'13 08/12/2013 08/12/2013
Manage and Maintain Relational Database K: 160. Manage and Maintain Relational Database 04/30/2014 04/30/2014
Remove Channel Blockage (Earthen Plug) to Enhance Nimz Ranch Wetlands L: 181. Remove Channel Blockage (Earthen Plug) to Enhance Nimz Ranch Wetlands 11/15/2013 11/15/2013
Invasive Species Control Treatments M: 197. Invasive Species Control Treatments 04/30/2014 04/30/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 197 Maintain/Remove Vegetation
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 06/01/2013
B 115 Alternatives Analysis Assessment of Nimz Ranch Floodplain Restoration 06/01/2013
C 122 Reconnect Technical Review Team 06/01/2013
D 174 Produce GIS-Based Prioritization Tool Plan 06/01/2013
E 191 Kootenai Watershed Coordination 06/01/2013
F 175 Initial Designs and Specifications of Nimz Ranch Floodplain Restoration 06/01/2013
G 189 Plan, Design and Coordinate Project w/ Interdepartmental Divisions and Outside Entities 06/01/2013
H 165 Produce Environmental Compliance Documentation and Permitting 06/01/2013
I 119 Oversight and Administer Project Activities 06/01/2013
J 132 Submit Annual Report for part of FY'12 and including a portion of FY'13 06/01/2013
K 160 Manage and Maintain Relational Database 06/01/2013
L 181 Remove Channel Blockage (Earthen Plug) to Enhance Nimz Ranch Wetlands 07/23/2013
M 197 Invasive Species Control Treatments 07/23/2013