Contract 61483: 2009-024-00 CAP TWIN RIVERS STURGEON/BURBOT HATCHERY CONSTRUCTION
Project Number:
Title:
Kootenai White Sturgeon/Burbot Aquaculture Planning/Construction
Stage:
Closed
Area:
Province Subbasin %
Mountain Columbia Kootenai 100.00%
Contract Number:
61483
Contract Title:
2009-024-00 CAP TWIN RIVERS STURGEON/BURBOT HATCHERY CONSTRUCTION
Contract Continuation:
Previous: Next:
n/a
Contract Status:
History
Contract Description:
The Kootenai Tribe’s Kootenai River Native Fish Conservation Aquaculture program is designed to address the precipitous decline of two species, Kootenai River white sturgeon (Acipenser transmontanus) and burbot (Lota lota maculosa), that are of immeasurable cultural value to the Kootenai Tribe and that are critical components of the Kootenai River ecosystem.  The purpose of the Kootenai sturgeon aquaculture program is to prevent extinction of this endangered population, preserve the existing gene pool, and continue rebuilding a healthy age class structure using conservation aquaculture techniques with wild native broodstock.  The purpose of the Tribe’s burbot aquaculture program is to reintroduce burbot into the lower Kootenai River and begin rebuilding the population using genetically similar stock from within the subbasin in British Columbia  The new Twin Rivers Hatchery will allow for expansion of the Kootenai sturgeon aquaculture program to increase rearing capacity in order to reduce rearing density, allow for greater segregation and size grading of fish families, and support aquaculture research needs.  The new facility is needed because there is no room for expansion of the program at the existing Tribal Hatchery Facility.  Additionally, the combined use of the two facilities will significantly enhance program flexibility and provide additional fail-safe back up.  The Twin Rivers Hatchery will also house the Tribe’s burbot hatchery program.  Burbot operations at Twin Rivers Hatchery will include broodstock collection and handling, spawning and fertilization, incubation and hatching, rearing, marking, and release.  The new facility will also accommodate burbot aquaculture research needs.  This contract will provide for funding for construction of the Twin Rivers Sturgeon and Burbot Hatchery, while planning and design is funded under Kootenai Tribe's Project 198806400.
Account Type(s):
Capital
Contract Start Date:
06/01/2013
Contract End Date:
09/30/2015
Current Contract Value:
$16,080,844
Expenditures:
$16,080,844

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jan Brady Bonneville Power Administration Yes COR jebrady@bpa.gov (503) 230-4514
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Sue Ireland Kootenai Tribe Yes Supervisor ireland@kootenai.org (208) 267-3620
Solomonn Marsh Bonneville Power Administration Yes Contracting Officer spmarsh@bpa.gov (503) 230-3943
Edna Runyan Kootenai Tribe Yes Contract Manager edna@kootenai.org (208) 267-3620
Virgil Watts III Bonneville Power Administration Yes Technical Contact vlwatts@bpa.gov (503) 230-4625
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Sean Welch Bonneville Power Administration Yes Technical Contact spwelch@bpa.gov (503) 230-7691
Shawn Young Kootenai Tribe Yes Technical Contact young@kootenai.org (208) 597-4490


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Fulfill all administrative tasks with quality products and in a timely manner. A: 119. Project management tasks 09/30/2015 09/30/2015
Secure all required permits B: 165. Environmental Compliance 08/30/2013 09/30/2013
Civil Site Work C: 171. Civil Site Work - Twin Rivers 07/31/2013 06/24/2013
Develop Water, Drainage and Septic System D: 171. Site Utilities - Twin Rivers 09/30/2013 09/05/2013
Construct Twin Rivers Sturgeon and Burbot Hatchery Building E: 171. Hatchery Building - Twin Rivers 03/31/2015 03/31/2015
Construct Vehicle Storage Building F: 171. Vehicle Storage Building - Twin Rivers 11/28/2014 10/30/2014
Construct Residences 1 & 2 G: 171. Residences 1 & 2 - Twin Rivers 08/29/2014 08/15/2014
Construct Influent Sedimentation Basin H: 171. Influent Sedimentation Basin - Twin Rivers 10/30/2014 10/30/2014
Construct Effluent Sedimentation Basin I: 171. Effluent Sedimentation Basin - Twin Rivers 10/15/2014 10/01/2014
Outdoor Rearing Site Prep J: 171. Burbot Outdoor Rearing Site - Twin Rivers 09/30/2014
Kootenai River intake structure K: 171. Kootenai River Intake Structure 11/08/2013 12/10/2013
KR Pump Station L: 171. Kootenai River Pump Station 11/20/2014 11/20/2014
Moyie River Intake Structure M: 171. Moyie River Intake Structure 11/07/2013 11/29/2013
Moyie River Pump Station N: 171. Moyie River Pump Station 11/20/2014 11/20/2014
Boat Ramp Civil Improvements O: 171. Twin Rivers Boat Ramp Area 05/16/2014 05/01/2014
Twin Rivers Site Finishings P: 171. Twin Rivers Site Finishings 08/31/2015 08/31/2015
Twin River Site Electrical Q: 171. Twin Rivers Site Electrical 11/20/2014 06/16/2014
General Conditions R: 171. Construction General Conditions 09/30/2015 09/30/2015
Attach Progress Report in Pisces T: 132. Submit Progress Report for the period (6/2013) to (9/2014) 09/30/2015 09/30/2015
Twin Rivers Completion Items U: 171. Twin Rivers Completion Items 09/30/2015 09/30/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Burbot (Lota lota)
  • 16 instances of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility
Sturgeon, White (A. transmontanus) - Kootenai River DPS (Endangered)
  • 16 instances of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Project management tasks 05/01/2013
B 165 Environmental Compliance 05/01/2013
C 171 Civil Site Work - Twin Rivers 05/15/2013
D 171 Site Utilities - Twin Rivers 05/15/2013
E 171 Hatchery Building - Twin Rivers 05/15/2013
F 171 Vehicle Storage Building - Twin Rivers 05/15/2013
G 171 Residences 1 & 2 - Twin Rivers 05/15/2013
H 171 Influent Sedimentation Basin - Twin Rivers 05/15/2013
I 171 Effluent Sedimentation Basin - Twin Rivers 05/15/2013
J 171 Burbot Outdoor Rearing Site - Twin Rivers 05/15/2013
K 171 Kootenai River Intake Structure 05/15/2013
L 171 Kootenai River Pump Station 05/15/2013
M 171 Moyie River Intake Structure 05/15/2013
N 171 Moyie River Pump Station 05/15/2013
O 171 Twin Rivers Boat Ramp Area 05/15/2013
P 171 Twin Rivers Site Finishings 05/15/2013
Q 171 Twin Rivers Site Electrical 05/15/2013
R 171 Construction General Conditions 05/15/2013
S 185 Periodic Status Reports for BPA 05/15/2013
T 132 Submit Progress Report for the period (6/2013) to (9/2014) 05/15/2013