Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 62045: 1992-059-00 EXP AMAZON BASIN/EUGENE WETLANDS
Project Number:
Title:
Amazon Basin/West Eugene Wetlands
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Lower Columbia Willamette 100.00%
Contract Number:
62045
Contract Title:
1992-059-00 EXP AMAZON BASIN/EUGENE WETLANDS
Contract Continuation:
Previous: Next:
57562: 1992-059-00 EXP AMAZON BASIN/WEST EUGENE WETLANDS
Contract Status:
History
Contract Description:
Project Goal:
The Willow Creek Mitigation and Management Project has been designed to provide protection and improvement of wildlife habitat for mitigation of habitat loss as outlined in the Northwest Planning Council's 1994 Fish and Wildlife Program.  These efforts would partially fulfill BPA's obligations to protect, mitigate, and enhance wildlife habitat affected by the development of federal hydroelectric projects in the Columbia River Basin, including the Willamette River Drainage.

Background:
The Willow Creek Wildlife Mitigation Project Environmental Assessment (EA) was developed in 1995 to guide the management of the Willow Creek Natural Area for wildlife mitigation purposes.  Prior to completing the EA, a habitat assessment was conducted of the Willow Creek site to document habitat units baseline conditions for the following target species: Beaver, Black-capped Chickadee, Red-tailed Hawk, Valley Quail, Western Meadowlark, Yellow Warbler, and Western Pond Turtle.  The EA also describes five management alternatives and quantifies the increase in habitat units for the target species that would occur under each alternative.  The alternative that was selected for implementation was designed to maximize wildlife and biodiversity values on the site.  This would be accomplished by restoring, enhancing, or maintaining sufficiently large areas of a variety of habitats occurring on the site.

Location of Project:
The Willow Creek Natural Area is located in the Amazon Creek watershed in and adjacent to the City of Eugene, Lane County, Oregon.  With the recent addition of the Cuddeback, Alvord and Rathbone parcels, an area of 492 acres is currently protected at Willow Creek through the BPA wildlife mitigation program.  However, the Willow Creek Natural Area comprises one portion of a larger wetland system in the West Eugene area that is protected through a partnership between The Nature Conservancy, the City of Eugene, and the Eugene District Bureau of Land Management.  This larger wetland system includes over 1700 acres of protected wetlands as well as adjacent upland habitats that have been acquired by BLM and the City of Eugene.

Relationships to Other Projects:
Willow Creek is within the West Eugene Wetlands, a site that supports the largest remaining wet prairie in the Willamette Valley and has been identified as an important conservation area by the Oregon Biodiversity Project (1998), the Oregon Habitat Joint Venture (draft 2004), The Nature Conservancy (2004), and Oregon Department of Fish and Wildlife (2005).  The West Eugene Wetlands are a globally significant site for the conservation of biological diversity and important community natural area, open space and education resource in Eugene, Oregon. The West Eugene Wetlands Plan (1992) is being implemented by an interagency partnership including the Bureau of Land Management, the City of Eugene, The Nature Conservancy, the Oregon Youth Conservation Corps, the McKenzie River Trust, US. Fish and Wildlife Service, Army Corps of Engineers and the Willamette Resources & Education Network.  These agencies work together to manage wetland resources in a landscape context over the entire project area.  These partners are helping to build an interconnected network of wetlands and riparian corridors that help to strengthen the viability of habitats and wildlife populations over the entire system.  

In particular Willow Creek work complements other existing BPA funded Wildlife mitigation projects in the Willamette including:  the Burlington Bottoms Wildlife Mitigation Project (#199107800) and Willamette Basin Mitigation (#199206800).  For example, the Mt. Pisgah site, which is located about 11 miles east of the Willow Creek site, supports some similar habitats and target species (such as wetlands and riparian habitats supporting species such as the western pond turtle).  Mt. Pisgah also provides some similar opportunities for wildlife habitat enhancement, such as removal of invasive non-native species such as Scot's broom.
Account Type(s):
Expense
Contract Start Date:
04/01/2013
Contract End Date:
03/31/2014
Current Contract Value:
$94,080
Expenditures:
$94,080

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Dan Bell Nature Conservancy Yes Interested Party dbell@tnc.org (503) 802-8129
Matt Benotsch Nature Conservancy Yes Contract Manager mbenotsch@tnc.org (541) 915-3687
Michelle Guay Bonneville Power Administration Yes Env. Compliance Lead mxguay@bpa.gov (503) 230-3459
Jean Jancaitis Nature Conservancy Yes Supervisor jjancaitis@tnc.org (541) 343-1010
Theresa Koloszar Nature Conservancy Yes Administrative Contact tkoloszar@tnc.org (503) 802-8100
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Jason Nuckols Nature Conservancy Yes Interested Party jnuckols@tnc.org (541) 343-1010x301
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Dorothy Welch Bonneville Power Administration Yes COR dwwelch@bpa.gov (503) 230-5479


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Grow Fender's blue butterfly nectar and host plant materials A: 47. Develop and plant native plant materials 03/31/2014 03/31/2014
Complete removal/treatments of non-native vegetation (including prescribed fire) B: 197. Removal/treatments of non-native vegetation (including prescribed fire) 03/31/2014 03/31/2014
Manage unauthorized public access C: 26. Manage unauthorized public access 03/31/2014 03/31/2014
Complete maintenance D: 186. Monitor and maintain fences and signage 03/31/2014 03/31/2014
Debris clean-up and removal E: 27. Debris clean-up and removal 03/31/2014 03/31/2014
ESA mandated inventories F: 115. Ongoing inventories of target ESA listed species 03/31/2014 03/31/2014
Complete Prescribed Fire Plans G: 174. Complete Prescribed Fire Plans 07/19/2013 07/19/2013
Attach Progress Report in Pisces I: 132. Produce Annual Report 03/31/2014 03/31/2014
Complete environmental compliance requirements J: 165. Produce Environmental Compliance Documentation 03/31/2014 03/31/2014
Complete project administration K: 119. Manage and Administer Projects 03/31/2014 03/31/2014
Produce Long-term Maintenance Plan L: 193. Produce Long-term Maintenance Plan 03/28/2014 03/28/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 197 Maintain/Remove Vegetation
  • 1 instance of WE 193 Produce Land Management Plan
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 47 Develop and plant native plant materials 04/01/2013
B 197 Removal/treatments of non-native vegetation (including prescribed fire) 07/15/2013
C 26 Manage unauthorized public access 04/01/2013
D 186 Monitor and maintain fences and signage 04/01/2013
E 27 Debris clean-up and removal 04/01/2013
F 115 Ongoing inventories of target ESA listed species 04/01/2013
G 174 Complete Prescribed Fire Plans 04/01/2013
H 185 Periodic Status Reports for BPA 04/01/2013
I 132 Produce Annual Report 04/01/2013
J 165 Produce Environmental Compliance Documentation 04/01/2013
K 119 Manage and Administer Projects 04/01/2013
L 193 Produce Long-term Maintenance Plan