Close Message
CBFish website will be offline for approximately one hour starting at 5 PM today for maintenance. Thank you for your patience.
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 62346: 1992-010-00 EXP FORT HALL HABITAT RESTORATION
Project Number:
Title:
Fort Hall Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Upper Snake Snake Upper 100.00%
Contract Number:
62346
Contract Title:
1992-010-00 EXP FORT HALL HABITAT RESTORATION
Contract Continuation:
Previous: Next:
58904: 1992-010-00 EXP FORT HALL HABITAT RESTORATION
  • 66366: 1992-010-00 EXP FORT HALL HABITAT RESTORATION
Contract Status:
Closed
Contract Description:
Activities in FY12 focused on continued monitoring of the Spring Creek sites and implementation.  Restoration/ enhancement efforts in FY13 will be focused on streams on the Fort Hall Bottoms per the Fort Hall Bottoms Tributary Assessment. The primary objectives will be the same as in previous years, protect and enhance utilizing rock log deflectors, bank sloping and revegetation and fencing of the project site.  Therefore, restoring the stream bank will decrease channel width thus increasing depth and velocities of stream currents aggrading sediments thus cleaner gravels for spawning habitat and deeper habitat for refuge for larger trout.  These further results in a more dynamic environment as opposed to a habitat that has limited cover and slower water velocities.  Although benthic invertebrates appear to be abundant “trout movement to deeper and faster water may not be related to food alone, such movement could also be explained as cover related.”(Hunter, 1991)  These areas could be described as having large boulders, rubble, depth >1.0 feet, and high velocities.  This project will be very similar to the Yankee Fork Restoration Project also a BPA funded Contract.  The scope will be to utilize a suite of attributes to capture existing conditions of riparian and stream habitat, limiting factors, population dynamics of yct and trout, and include mapping of each stream.  The end product will be a guidance document which will identify priority areas for project implementation on the Bottoms which will also include strategies, types of projects, project sites, and costs estimates associated with each project. The assessment will also be supplemented with LiDAR imaging to further enhance existing conditions of each stream in the assessment. Flight 2 of LiDAR will be conducted during FY13 and will be completed in November FY13. Also, this will further guide through compiled information during the Assessment of limiting factors which will be looked at more closely such as populations of trout and hydrology of the Uppersnake Watershed and how it affects the Bottoms.  

Also, work will  be completed to establish a minimum flow on the lower Portnuef river which will include temperature data, and water chemistry and will include meetings with Tribal Water Resources and Bureau of Indian Affairs. Cost sharing with other Tribal departments for design and engineering for permanent structure weir will be proposed for FY13 as coffer dam for the BIA Michaud Project on lower Portnuef is not adequately structured for fish migration and adequate flow. In addition to the Fort Hall Restoration Project, other awards have been obtained through NRCS to renovate and replace the Clear Creek upper buffalo pasture riparian exclusion fence. Once completed, this project (1992-010-00) will once again propose project implementation for stream enhancement in this area.
Account Type(s):
Expense
Contract Start Date:
09/01/2013
Contract End Date:
08/31/2014
Current Contract Value:
$258,563
Expenditures:
$258,563

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes Yes Supervisor ccolter@sbtribes.com (208) 239-4553
Joe Deherrera Bonneville Power Administration Yes COR jldeherrera@bpa.gov (503) 230-3442
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Jacee Furniss Shoshone-Bannock Tribes No Administrative Contact jfurniss@sbtribes.com (208) 239-4551
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Hunter Osborne Shoshone-Bannock Tribes Yes Technical Contact hosborne@sbtribes.com (208) 239-4564
Gaylene Turnage Shoshone-Bannock Tribes No Administrative Contact gturnage@sbtribes.com (208) 478-3821
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Shannell Ward Shoshone-Bannock Tribes No Administrative Contact shannell.ward@sbtribes.com (208) 478-3821
Pam Waterhouse Shoshone-Bannock Tribes Yes Administrative Contact pwaterhouse@sbtribes.com (208) 478-3819


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Obtain all EC from BPA A: 165. Clearance from BPA 10/03/2013 09/01/2013
Coordination B: 99. Coordination 08/31/2014 08/01/2014
Photos and numbers planted, % survival. C: 47. Protect and Restore Riparian Habitats of the Reservation Streams 12/31/2013 12/02/2013
Fence installed, photo points. D: 40. Install Fence to protect riparian areas and projects 12/31/2013 10/01/2013
Inventory spp. with digital photo and file on desk top computer. E: 190. remove non-native/exotic fish 08/01/2014 08/01/2014
Field data sheets and logged on excel spreadsheets. F: 157. Treatment and control strata in Spring Creek 07/31/2014 07/29/2014
Field data sheets, and entered on computer. G: 157. Treatment and control comparison in Diggie and Big Jimmy Cr. Jimmy Drinks 08/01/2014 07/28/2014
Before/after photos of instream improvements. H: 29. Install Habitat Improvement Structures 07/01/2014 06/30/2014
Fort Hall Bottoms Habitat Assessment and Project Prioritization I: 114. Bottoms habitat Assessment and Project Prioritization 12/31/2013 11/01/2013
Bannock Creek Inventory/Assessment J: 115. Bannock Creek Habitat Inventory Functional Assessment 12/31/2013 10/01/2013
Attach Progress Report in Pisces K: 132. Submit Progress Report for the period 9/1/13 through 8/31/14(fy13) 08/31/2014 11/25/2013
All administrative tasks fulfilled with timely quality products L: 119. Routine administration of contract 08/31/2014 08/28/2014
Submit drawings and/or specifications to BPA N: 175. Lower Portneuf weir design 01/31/2014
Fish and Wildlife Database O: 162. Analyze Data Collected 08/31/2014
Fish and Wildlife Database P: 162. Purpose of Data Collected 08/31/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Yellowstone (O. c. bouvieri)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Clearance from BPA 09/01/2013
B 99 Coordination 09/01/2013
C 47 Protect and Restore Riparian Habitats of the Reservation Streams 07/01/2013
D 40 Install Fence to protect riparian areas and projects 07/01/2013
E 190 remove non-native/exotic fish 07/01/2013
F 157 Treatment and control strata in Spring Creek 07/01/2013
G 157 Treatment and control comparison in Diggie and Big Jimmy Cr. Jimmy Drinks 07/01/2013
H 29 Install Habitat Improvement Structures 07/01/2013
I 114 Bottoms habitat Assessment and Project Prioritization 09/01/2013
J 115 Bannock Creek Habitat Inventory Functional Assessment 07/01/2013
K 132 Submit Progress Report for the period 9/1/13 through 8/31/14(fy13) 09/01/2013
L 119 Routine administration of contract 09/01/2013
M 185 Periodic Status Reports for BPA 09/01/2013
N 175 Lower Portneuf weir design 09/01/2013
O 162 Analyze Data Collected 09/01/2013
P 162 Purpose of Data Collected 09/01/2013