Contract 62573: 2010-077-00 EXP TUCANNON (AREA 15) BUILD - CHANNEL COMPLEXITY
Project Number:
Title:
Tucannon River Programmatic Habitat Project
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Tucannon 100.00%
Contract Number:
62573
Contract Title:
2010-077-00 EXP TUCANNON (AREA 15) BUILD - CHANNEL COMPLEXITY
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
Project spans two contract periods over a 24 - 30 month duration covering design (Year-1) and the subsequent construction of restoration design features (implementation in Year-2).

This contract is to complete the Implementation Phase (Year 2):  
  -- any subsequent design modifications that may be required (following review), or as an adaptation in response to changes in channel geomorphology or site conditions (since completion of the design phase)
  -- permitting
  -- environmental and cultural resource clearances, and
  -- implementation of the design (construction of improved habitat features, in-channel structures, and other actions to restore ecological function).

Summary:  Enhancing and restoring instream habitat in this project area will be accomplished through a variety of treatment actions in the main channel, along the banks, and within the floodplain. These treatments include construction of instream habitat features such as engineered log jams (ELJs), removal of infrastructure such as spoils material and artificial embankment, and the installation of riparian plantings.  The principal benefits of project implementation will be restoration of historic spring Chinook spawning, rearing, and migration corridor habitats.  The associated treatment of riparian areas is expected to induce naturally occurring repair, restoration, and recovery of both floodplain and riparian zone function and processes.

Design Focus:  Emphasis is on increasing in-channel complexity through the placement of LWD to promote the reduction of channel confinement.  A description of the project area with respect to existing natural processes and habitat conditions is provided in the Design Report, along with the specific physical and biological objectives that the proposed restoration features are expected to address and achieve.  In addition, the project’s contribution to the overall watershed-scale restoration plan is described.  Construction considerations, implementation cost estimates, and best management practices are included for the treatment actions proposed in the restoration plan and Design Report for Area 15.

Expected Implementation Actions (from the 90% Design Report):  Protect the existing spring channel in the right floodplain. Install ELJs and other LWD to initiate side channel development through the left floodplain, which was recently converted to public land.  Remove levees and spoils and modify existing wood and rock structures to improve their habitat benefits and reduce impediments to natural processes.  (Re)plant adjacent floodplain and riparian areas; re-vegetate and restore disturbed construction access sites and materials or equipment staging areas.  

Potential Challenges:  Some trees and other existing vegetation may be disturbed in the process of gaining access to and placing the LWD structures, and removing or breaching the levee or other areas of artificial berm-embankment or spoils deposition.  Project actions in the upstream end of the project area from RM 37.00 to 36.35 will involve cooperation of adjacent landowners.  Because this project area is located just upstream of a residential area, LWD will likely require stabilization, especially in the lower reach, under extreme high-flow conditions to prevent it from mobilizing.
_____________________________________________________________________

Design Phase (provided here for context):  The Year-1 contract (#58975) encompassed:
- a final assessment, design report, and project design,
- any subsequent design modifications (following review), and
- the initiation of permitting requirements, and environmental and cultural resources clearances, if possible.

Background:  Under prior contracts, BPA and Salmon Recovery Funding Board (SRFB) and Columbia Conservation District (CCD) coordinated the development of a habitat restoration plan for the Tucannon River.  Initial focus was on Spring Chinook spawning and rearing core reaches, Reaches 6-10, RM-20 upstream to RM-50 (Anchor QEA, 2011).  The District has continued to work in cooperation with the Snake River Salmon Recovery Board (SRSRB) and Walla Walla Community College (WWCC) to complete the restoration assessment and plan from RM-20 downstream to RM-1.95, River Reaches 2-5 (Anchor QEA, 2011, 2012).  These Conceptual plans prioritized projects into three Tiers (1-3) based on the projected effects of implementation as a benefit to Snake River spring Chinook and Steelhead, cost-efficiency relative to those benefits and the feasibility of construction.  

Walla Walla Community College (WWCC) and the SRSRB received state Salmon Recovery Funding Board (SRFB) money to advance priority Tier-1 projects (from the Conceptual Restoration Plan) to a 30% design-stage during the 2012 field season.  The Area-15 project, identified as aTier-1 priority project in the restoration plan, was designed to a 30% level, as part of the grant held by the SRSRB.  The 30% Design Plan for Project Area 15 began to describe the purpose, function, design, and construction of restoration treatments proposed for implementation in this river segment.  Between September 2012 and into the summer of 2013 the Snake River Salmon Recovery Board (SRSRB) staff and implementation partners advanced the development of the restoration designs to a near-final (90%) Plan and Report, pursuant to the prior-year design contract;

Status:  The prior contract will produce the engineering design report, construction specifications, and estimate of probable costs required to permit and implement the Project Area-15 Tucannon River project.  Contract staff also began to initiate and coordinate permitting requirements and environmental clearances in anticipation of design implementation and project construction in the summer of 2014.  Cultural Resource protection investigations associated with planned materials staging areas, equipment mobilization, and work-site access in particular have required immediate attention and deliberate scheduling to initiate compliance actions such as surveys, and other requirements, in order for clearances to be timely during the expected construction period.  
_________________________________________________________

Future Management Considerations

Background:  The Tucannon River basin is located in Southeast Washington State in Columbia and Garfield counties.  The system-wide restoration objective for the Tucannon River is to improve habitat conditions for Endangered Species Act (ESA) listed species (Snake River Spring Chinook and Steelhead) for all life history stages.  It is expected that improved habitat conditions will lead to an increase in the abundance of listed species returning to the river.  Increasing abundance will lead to de-listing of the species, which is the overall recovery goal for the system.  Previous efforts (CCD 2004; SRSRB 2006) have identified the habitat-limiting factors associated with the decline of ESA-listed populations.

Geomorphic Implications:  LWD placement throughout the stream reach will force pools and hydraulic variability in the plane-bed channel sections, decrease instream velocities, and provide additional hydraulic complexity in the deep, incised sections. Placing ELJs in strategic locations along the left bank will promote side channel development through the former Russell property, developing a more complex channel network. Throughout the LWD placement areas, the structures will promote retention of additional LWD and bed-load that will promote building up the bed elevation over time and increasing floodplain connectivity. Removing the levee at RM-36.4 will ease channel confinement and allow for better floodplain connectivity during high flows.

Biological Benefits:  Adding complexity to the project area via LWD will address habitat limiting factors in the mainstem by diversifying the channel and initiating side channel development. In the short term, the pools that form at the structures will increase the available area for holding in the project area. The hydraulic diversity created by the structures will provide high-flow refuge and low-flow cover for juveniles. The structures also sort bed-load sediment, leading to the formation of spawning areas. In the long term, ELJs will promote channel complexity by splitting flow and encouraging the natural processes that drive the formation of habitat elements such as pools and side channels. The availability of diverse habitats will increase the carrying capacity for juvenile salmonids and increase the number of pools for holding adults. Levee removal and modifying the existing revetment structures will increase floodplain connectivity and the ability for the channel to migrate throughout the valley. In the long term, increased floodplain connectivity will lead to better riparian conditions that drive many ecosystem processes that are beneficial to both aquatic and non-aquatic species.
Account Type(s):
Expense
Contract Start Date:
09/16/2013
Contract End Date:
12/31/2014
Current Contract Value:
$616,917
Expenditures:
$616,917

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Terry Bruegman Columbia Conservation District (SWCD) No Supervisor tb-ccd@daytonwa.net (509) 382-4273x102
Kris Buelow Snake River Salmon Recovery Board Yes Technical Contact kris@snakeriverboard.org (509) 392-3858
Daniel Gambetta Bonneville Power Administration Yes Env. Compliance Lead dagambetta@bpa.gov (503) 230-3493
Andre L'Heureux Bonneville Power Administration Yes COR allheureux@bpa.gov (503) 230-4482
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Steve Martin Snake River Salmon Recovery Board Yes Supervisor steve@snakeriverboard.org (509) 386-4748
Debra Nordheim Columbia Conservation District (SWCD) Yes Contract Manager dn-ccd@daytonwa.net (509) 382-4273x101
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Sean Welch Bonneville Power Administration Yes Technical Contact spwelch@bpa.gov (503) 230-7691


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Effective implementation management, and timely contract administration A: 119. Manage and Administer Project 12/31/2014 12/31/2014
Environmental and Cultural Resource compliance assistance and clearance documentation B: 165. Environmental and cultural resource clearance and permitting 12/31/2014 09/09/2014
Review and adjustment to design report; produce revised/final construction or site plan. C: 175. Design Specifications and Engineering (Completion & Adjustments): Area 15 06/30/2014 06/30/2014
Placement Log Structures in Stream D: 29. Channel Complexity 08/31/2014 08/29/2014
Side Channel Development E: 30. Perennial and Ephemeral Side Channel Development 09/30/2014 08/29/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage and Administer Project 09/16/2013
B 165 Environmental and cultural resource clearance and permitting 09/16/2013
C 175 Design Specifications and Engineering (Completion & Adjustments): Area 15 08/07/2013
D 29 Channel Complexity 06/28/2014
E 30 Perennial and Ephemeral Side Channel Development 06/28/2014
F 132 Report encompassed in yearly Programmatic reporting for Tucannon (#2010-077-00) 09/16/2013
G 185 Periodic Status Reports for BPA 09/01/2013