| Province | Subbasin | % |
|---|---|---|
| Lower Columbia | Willamette | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Ensure environmental compliance requirements are complete | A: 165. Complete Environmental Compliance Requirements | 03/31/2015 | 03/31/2015 | |
| Willamette Falls Pacific Lamprey Technical Working Group (WFPLTWG) | B: 191. Participate in Willamette Falls Pacific Lamprey Technical Working Group (WFPLTWG) | 03/31/2015 | 03/31/2015 | |
| Install HDX antennae on lamprey ramps | C: 70. Install HDX antennae on lamprey ramps | 10/31/2014 | 06/26/2014 | |
| Install HDX antennae in the old fishway | D: 70. Install HDX antennae in the old fishway | 10/31/2014 | 05/24/2014 | |
| Capture, Mark, Inspect Lamprey and Operate HDX Array(s) at Willamette Falls | E: 157. Collect and examine lamprey to calculate adult escapement | 03/31/2015 | 03/31/2015 | |
| Tag adult lamprey at Willamette Falls | F: 158. HDX tag adult Pacific lamprey at Willamette Falls | 09/30/2014 | 09/19/2014 | |
| Conduct creel surveys | G: 157. Conduct creel surveys | 03/31/2015 | 03/31/2015 | |
| Estimate Lamprey Harvest at Willamette Falls | H: 162. Estimate Harvest | 03/31/2015 | 03/31/2015 | |
| Develop Statistical Model for Annual Lamprey Population Estimates at Willamette Falls | I: 162. Develop Statistical Model for Population Escapement | 03/31/2015 | 03/31/2015 | |
| All administrative tasks fulfilled with timely quality products | J: 119. Manage Project | 11/15/2014 | 11/15/2014 | |
| Submit RM&E Technical Annual Report | K: 132. Submit Progress Report for the period Jan 2014 to Dec 2014 | 03/31/2015 | 08/21/2014 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Lamprey, Pacific (Entosphenus tridentata) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 165 | Complete Environmental Compliance Requirements | 04/01/2014 | ||||||
| B | 191 | Participate in Willamette Falls Pacific Lamprey Technical Working Group (WFPLTWG) | 04/01/2014 | ||||||
| C | 70 | Install HDX antennae on lamprey ramps | 11/15/2013 | ||||||
| D | 70 | Install HDX antennae in the old fishway | 11/15/2013 | ||||||
| E | 157 | Collect and examine lamprey to calculate adult escapement | 11/19/2013 | ||||||
| F | 158 | HDX tag adult Pacific lamprey at Willamette Falls | 11/15/2013 | ||||||
| G | 157 | Conduct creel surveys | 11/15/2013 | ||||||
| H | 162 | Estimate Harvest | 04/01/2014 | ||||||
| I | 162 | Develop Statistical Model for Population Escapement | 04/01/2014 | ||||||
| J | 119 | Manage Project | 04/01/2014 | ||||||
| K | 132 | Submit Progress Report for the period Jan 2014 to Dec 2014 | 04/01/2014 | ||||||
| L | 185 | Periodic Status Reports for BPA | 04/01/2014 |