Close Message
CBFish website will be offline for several hours starting at 5 PM today for maintenance. Thank you for your patience.
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 64059: 1995-001-00 EXP KALISPEL RESIDENT FISH HABITAT
Project Number:
Title:
Kalispel Tribe Resident Fish Program
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
64059
Contract Title:
1995-001-00 EXP KALISPEL RESIDENT FISH HABITAT
Contract Continuation:
Previous: Next:
60519: 1995-001-00 EXP KALISPEL RESIDENT FISH HABITAT
  • 68231: 1995-001-00 EXP KALISPEL RESIDENT FISH HABITAT
Contract Status:
Closed
Contract Description:
BACKGROUND

Aquatic habitat degradation/alteration and widespread stocking of non-native species in the Pend Oreille subbasin have resulted in aquatic communities that differ from pre-development native communities. Native fish (specifically westslope cutthroat and bull trout) have been displaced by non-native species and by alteration and degradation of habitat. Dams on the Pend Oreille River prevent fish passage and create habitat more suitable for warmwater species.  The Kalispel Natural Resources Department (Department)  initiated stream habitat and fish assessments in 1995. Based on assessment findings, tributary restoration projects started in1996. In 2002, overall fish densities in restored tributary sites had increased 47%; however, nonnative species, such as eastern brook trout, brown trout, and rainbow trout accounted for much of the increase. Therefore, tributary restoration efforts began to focus more on nonnative species removal in headwater streams and large scale bank restoration in the lower portions of watersheds where channel stability is impaired.  Non-native brook trout removal has been conducted in the Upper West Branch LeClerc Creek watershed in Washington since 2002.  From 2002 to 2008, over 15,000 brook trout were removed from streams in the Upper West Branch LeClerc Creek watershed.  In 2009, brook trout removals were included in the new Kalispel/BPA Nonnative Fish Suppression Project (Project No. 2007-149-00).   With nonnative removals now included in the Nonnative Suppression Project, the Resident Fish Habitat project is now able to focus on stream and riparian habitat improvements in Washington and Idaho, including the Goose Creek Channel Restoration Project (Project) within Big Meadows.

In summary, activities aimed at recovering native westslope cutthroat and bull trout being undertaken by the Department  include:

1. Performing baseline stream habitat and fish population assessments to determine current distribution and abundance and identifying core watersheds for focused recovery efforts;
2. Working to protect existing native populations and functioning habitat through participation in regional policy setting groups and consultation with area land, fish, and wildlife management agencies and property owners;
3. Pursuing funding from various sources and partners and partnering with other agencies in watershed restoration projects;
4. Implementing instream, riparian, and upland restoration projects in core watersheds; and
5. Monitoring restoration projects and adaptively managing plans and actions to maximize conservation outcomes.


GOOSE CREEK CHANNEL RESTORATION PROJECT

The Kalispel Tribe acquired the 773 acre Big Meadows property near Priest Lake, Idaho to mitigate for wildlife habitat losses as part of the construction and operation of Albeni Falls Dam.  Goose Creek bisects Big Meadows prior to its confluence with the Upper West Branch Priest River.  Previous management of the land included channelizing and dredging portions of Goose Creek in an effort to drain the meadow and create better agricultural land.  Baseline habitat assessments conducted in 2009 documented significantly reduced channel length, lateral and vertical instability, reduced habitat quality, and poor riparian vegetation.  Channelization and subsequent downcutting have lowered the groundwater table and converted the formerly wet meadow into upland pasture. The Kalispel Tribe intends to restore aquatic, riparian, and wetland habitats within Big Meadows by restoring an approximately 2.25 mile long portion of Goose Creek to its historic planform and profile.  In order to prevent further invasion of nonnative fish in the Goose Creek watershed, a barrier was constructed in 2011.  Once the Project is completed in 2016,  piscicide treatments will be conducted in the watershed to remove nonnative species.  Big Meadows will be protected in perpetuity by the Kalispel Tribe through a long term conservation management plan. The Project has been broken into five phases based on constructability.   The Kalispel Resident Fish Project-Habitat scope of work for the next three years will be to implement the Project.  To date, $336,608  in cost-share has been contributed to the Project and the Department will continue to pursue additional funding opportunities.  In the event that cost-share funds offset the need for BPA funds, baseline habitat and fish population assessments will be conducted in additional Pend Oreille watershed tributaries.
Account Type(s):
Expense
Contract Start Date:
03/01/2014
Contract End Date:
02/28/2015
Current Contract Value:
$474,640
Expenditures:
$474,640

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Todd Andersen Kalispel Tribe Yes Interested Party tandersen@knrd.org (509) 447-7245
Nick Bean Kalispel Tribe Yes Technical Contact nbean@knrd.org (509) 447-7103
Eric Berntsen Kalispel Tribe Yes Technical Contact eberntsen@kalispeltribe.com (509) 447-7185
Rossana Callejas Bonneville Power Administration No Interested Party rxcallejas@bpa.gov (503) 230-7558
Jason Connor Kalispel Tribe Yes Interested Party jconnor@knrd.org (509) 447-7285
Hannah Dondy-Kaplan Bonneville Power Administration Yes COR hadondy-kaplan@bpa.gov (503) 230-4071
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Joe Maroney Kalispel Tribe Yes Supervisor jmaroney@knrd.org (509) 447-7272
Kendra Maroney Kalispel Tribe No Technical Contact kmaroney@kalispeltribe.com (509) 671-2376
Jason Olson Kalispel Tribe Yes Contract Manager jolson@knrd.org (509) 447-7290
Jolene Seymour Kalispel Tribe Yes Administrative Contact jseymour@kalispeltribe.com (509) 445-1147
Jennifer Snyder Bonneville Power Administration Yes Env. Compliance Lead jasnyder@bpa.gov (503) 230-4187
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Interagency Coordination and Planning A: 114. Interagency Coordination/Planning for Stream Restoration and Native Fish Recovery Actions 02/28/2015 02/17/2015
Project Management and Administration B: 119. Project Management and Administration 02/28/2015 02/17/2015
Completed Environmental Permit Applications and Agency Approvals C: 165. Obtain Required Environmental Permits 07/02/2014 07/02/2014
Completed Report Covering 2013 Field Season D: 132. FY'13 Progress Report 02/28/2015 08/04/2014
Priest Lake Barn Operation E: 98. Priest Lake Barn Upgrades 02/28/2015 02/17/2015
Maintain Previously-Installed Riparian Fencing F: 186. Maintain Previously-Installed Riparian Fencing 07/31/2014 07/31/2014
Goose Creek Channel Restoration Project Construction Erosion and Sediment Control G: 55. Goose Creek Channel Restoration Project Construction Erosion and Sediment Control 10/31/2014 10/31/2014
Remove Phase 1 Channel Plugs and Activate Phase 1 Channel H: 84. Remove Phase 1 Channel Plugs and Activate Phase 1 Channel 08/08/2014 08/08/2014
Remove Floodplain Dike Road Culvert I: 180. Remove Floodplain Dike Road Culvert 08/15/2014 08/15/2014
Resurface Bridge over Fish Passage Barrier J: 186. Resurface Bridge over Fish Passage Barrier 10/31/2014 10/31/2014
Goose Creek Channel Restoration Project Construction-Phases 2,2A, and 2B K: 30. Goose Creek Channel Restoration Project Construction-Phases 2, 2A, and 2B 10/31/2014 10/31/2014
Vegetate Phase 2, 2A, and Phase 2B Construction Areas L: 47. Vegetate Phase 2, 2A, and Phase 2B Construction Areas 10/31/2014 10/31/2014
1000 potted plants. M: 47. Develop and Maintain Conservation Nursery 10/31/2014 10/31/2014
Produce Educational Material Regarding the Goose Creek Restoration Project N: 188. Produce Educational Material Regarding the Goose Creek Restoration Project 10/31/2014 10/31/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Westslope (O. c. lewisi)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 98 Other
  • 1 instance of WE 114 Identify and Select Projects
Trout, Bull (S. confluentus) (Threatened)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 98 Other
  • 1 instance of WE 114 Identify and Select Projects

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 114 Interagency Coordination/Planning for Stream Restoration and Native Fish Recovery Actions 03/01/2014
B 119 Project Management and Administration 03/01/2014
C 165 Obtain Required Environmental Permits 03/01/2014
D 132 FY'13 Progress Report 03/01/2014
E 98 Priest Lake Barn Upgrades 07/11/2014
F 186 Maintain Previously-Installed Riparian Fencing 12/06/2013
G 55 Goose Creek Channel Restoration Project Construction Erosion and Sediment Control 07/24/2014
H 84 Remove Phase 1 Channel Plugs and Activate Phase 1 Channel 07/24/2014
I 180 Remove Floodplain Dike Road Culvert 07/24/2014
J 186 Resurface Bridge over Fish Passage Barrier 12/06/2013
K 30 Goose Creek Channel Restoration Project Construction-Phases 2, 2A, and 2B 07/24/2014
L 47 Vegetate Phase 2, 2A, and Phase 2B Construction Areas 07/24/2014
M 47 Develop and Maintain Conservation Nursery 12/06/2013
N 188 Produce Educational Material Regarding the Goose Creek Restoration Project 12/06/2013
O 185 Periodic Pisces Status Reports 03/01/2014