| Province | Subbasin | % |
|---|---|---|
| Columbia Cascade | Entiat | 25.00% |
| Methow | 25.00% | |
| Okanogan | 25.00% | |
| Wenatchee | 25.00% |
| Previous: | Next: |
|---|---|
| 58733: 2010-001-00 EXP LOWER ENTIAT RM 1.9 CHANNEL DESIGN |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Environmental Compliance Support | A: 165. Environmental Compliance | 03/13/2015 | 03/12/2015 | |
| All administrative tasks fulfilled with timely quality products | B: 119. Project Management | 03/13/2015 | 03/12/2015 | |
| Landowner and Stakeholder Coordination | C: 191. Landowner and Stakeholder Coordination | 03/13/2015 | 03/12/2015 | |
| Harrison Complexity | D: 29. Harrison Complexity (River right structures) | 12/31/2014 | 12/31/2014 | |
| Harrison Side Channel Enhancement | E: 30. Harrison Side Channel Enhancement RM 4 | 12/31/2014 | 12/31/2014 | |
| Harrison Levee Removal Mainstem | F: 180. Harrison Levee Removal mainstem | 12/31/2014 | 12/31/2014 | |
| Harrison Levee Removal side channel | G: 180. Harrison Levee Removal side channel | 12/31/2014 | 12/31/2014 | |
| Foreman Side Channel Enhancement RM 1.65 | H: 30. Foreman Side Channel Enhancement RM 1.65 | 12/31/2014 | 12/31/2014 | |
| Construction Management Complete | J: 100. Harrison and Foreman Construction Management | 03/13/2015 | 03/12/2015 | |
| % Riparian revegetation | M: 47. % Riparian Revegetation | 11/14/2014 | 11/14/2014 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
| Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 165 | Environmental Compliance | 03/14/2014 | ||||||
| B | 119 | Project Management | 03/14/2014 | ||||||
| C | 191 | Landowner and Stakeholder Coordination | 01/01/2014 | ||||||
| D | 29 | Harrison Complexity (River right structures) | 05/23/2014 | ||||||
| E | 30 | Harrison Side Channel Enhancement RM 4 | 05/23/2014 | ||||||
| F | 180 | Harrison Levee Removal mainstem | 05/23/2014 | ||||||
| G | 180 | Harrison Levee Removal side channel | 05/23/2014 | ||||||
| H | 30 | Foreman Side Channel Enhancement RM 1.65 | 05/23/2014 | ||||||
| I | 30 | Foreman Side Channel Enhancement RM 1.71 | 05/23/2014 | ||||||
| J | 100 | Harrison and Foreman Construction Management | 01/01/2014 | ||||||
| K | 185 | Periodic Status Reports for BPA | 01/01/2014 | ||||||
| L | 132 | No Report is Required | 03/14/2014 | ||||||
| M | 47 | % Riparian Revegetation | 05/23/2014 |