Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 64523: 200890400 EXP SALMON RIVER NUTRIENT ENHANCEMENT
Project Number:
Title:
Salmon River Basin Nutrient Enhancement
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
64523
Contract Title:
200890400 EXP SALMON RIVER NUTRIENT ENHANCEMENT
Contract Continuation:
Previous: Next:
61314: 2008-904-00 EXP SALMON RIVER BASIN NUTRIENT ENHANCEMENT
  • 68648: 2008-904-00 EXP SALMON RIVER NUTRIENT ENHANCEMENT
Contract Status:
Closed
Contract Description:
In 2014-2015, the Salmon River Basin Nutrient Enhancement (SRBNE) project will continue to collect chemical, physical, and biological data to evaluate the efficacy of natural (i.e., spawning Chinook salmon) and artificial (i.e., Chinook salmon carcasses and carcass analogs) nutrient additions designed to increase freshwater habitat productivity for stream-dwelling salmonids in the upper Salmon River Basin.  The 2014 field season will focus on evaluations in the Yankee Fork Salmon River (YFSR) watershed.  The project is a continuation of an initial 4 year experimental design consisting of three years of treatment (2010, 2011, and 2012), followed by 1 year of post-treatment (2013) data collections.  Specific project objectives for the 2014-2015 contract period include the quantification and assessment of: streamwater nutrient concentrations; nutrient limitation; macroinvertebrate density, biomass, and community composition; river metabolism measures (gross primary production and community respiration), nitrogen and carbon stable isotope analyses (biofilm, macroinverterates, and fish); and aquatic food web connections in treatment streams receiving natural and artificial nutrient additions (n=3) and a control stream (n=1) that does not receive nutrient additions.  Experimental design issues, data collection methodology, field data collections, and data and statistical analyses of measured response variables will be planned and conducted in collaboration with other SBT projects involved in on-going habitat and fisheries related work in the YFSR watershed.  Water sample nutrient concentrations will be analyzed by Mark Palmer (High Sierra Water Lab, Inc.); macroinvertebrate sorting and identification (including abundance and biomass estimates) will be conducted by Robert Wisseman (Aquatic Biology Associates, Inc.); and nitrogen and carbon stable isotope measures will be analyzed by Dr. Bruce Finney (Idaho State University stable isotope lab).
Account Type(s):
Expense
Contract Start Date:
05/01/2014
Contract End Date:
04/30/2015
Current Contract Value:
$306,941
Expenditures:
$306,941

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes Yes Supervisor ccolter@sbtribes.com (208) 239-4553
Joe Deherrera Bonneville Power Administration Yes COR jldeherrera@bpa.gov (503) 230-3442
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Jacee Furniss Shoshone-Bannock Tribes No Administrative Contact jfurniss@sbtribes.com (208) 239-4551
Andre Kohler Shoshone-Bannock Tribes Yes Technical Contact akohler@sbtribes.com (208) 239-4566
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Gaylene Turnage Shoshone-Bannock Tribes No Administrative Contact gturnage@sbtribes.com (208) 478-3821
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Shannell Ward Shoshone-Bannock Tribes No Administrative Contact shannell.ward@sbtribes.com (208) 478-3821


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental compliance A: 165. Produce Contract Environmental Compliance and Permitting Documentation 04/30/2015 03/31/2015
Baseline, treatment, and post-treatment period data collections, analyses, and reporting summaries B: 157. Collect Chemical, Physical, and Biological Data in Study Streams 03/15/2015 03/15/2015
Chemical, physical, and biological variable data analyses C: 162. Chemical, Physical, and Biological Data Evaluations 03/31/2015 03/31/2015
Dissemination of SRBNE related raw and/or summary data and results D: 161. Facilitate the dissemination of summary data and results 04/30/2015 03/31/2015
All administrative tasks fulfilled with timely quality products E: 119. Contract Management and Administration 04/15/2015 03/31/2015
Attach Progress Report in Pisces G: 132. Submit Progress Report for the period 1 May, 2014 to 30 April, 2015 04/15/2015 04/15/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce Contract Environmental Compliance and Permitting Documentation 05/01/2014
B 157 Collect Chemical, Physical, and Biological Data in Study Streams 05/01/2014
C 162 Chemical, Physical, and Biological Data Evaluations 05/01/2014
D 161 Facilitate the dissemination of summary data and results 05/01/2014
E 119 Contract Management and Administration 05/01/2014
F 185 Periodic Status Reports for BPA 05/01/2014
G 132 Submit Progress Report for the period 1 May, 2014 to 30 April, 2015 05/01/2014