| Province | Subbasin | % |
|---|---|---|
| Columbia Plateau | Crab | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Full Name | Organization | Write Permission | Contact Role | Work Phone | |
|---|---|---|---|---|---|
| Sandra Fife | Bonneville Power Administration | Yes | COR | safife@bpa.gov | (503) 230-3678 |
| Richard Finger | Washington Department of Fish and Wildlife (WDFW) | No | Technical Contact | richard.finger@dfw.wa.gov | (509) 754-4624 |
| Greg Fitzgerald | Washington Department of Fish and Wildlife (WDFW) | Yes | Contract Manager | gregory.fitzgerald@dfw.wa.gov | (509) 765-6641 |
| Brenda Heister | Bonneville Power Administration | Yes | Contracting Officer | bsheister@bpa.gov | (503) 230-3531 |
| Janice Jackson | Washington Department of Fish and Wildlife (WDFW) | No | Administrative Contact | janice.jackson@dfw.wa.gov | (360) 902-2444 |
| Peter Lofy | Bonneville Power Administration | Yes | F&W Approver | ptlofy@bpa.gov | (503) 230-4193 |
| Matt Monda | Washington Department of Fish and Wildlife (WDFW) | No | Supervisor | mondamjm@dfw.wa.gov | |
| Jesse Wilson | Bonneville Power Administration | Yes | Env. Compliance Lead | jcwilson@bpa.gov | (503) 230-4506 |
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Attach Annual Progress Report in Pisces | B: 132. Submit Progress Report for the period Feb 2013 to Jan 2014 | 01/31/2015 | ||
| Numbers and species of waterfowl pairs using TD2 waters in the spring. | C: 157. Spring waterfowl pair counts | 07/31/2014 | 09/15/2014 | |
| TD-1 cells tilled | D: 181. Till cells at TD1 | 08/31/2014 | 05/30/2014 | |
| Seed 20 acres of moist soil vegetation at TD-1 project site | E: 47. Moist soil seeding in TD-1 | 08/31/2014 | 08/01/2014 | |
| Monitor and maintain desirable vegetation, control undesirable vegetation at TD-1 | F: 198. Monitor and maintain desirable vegetation, control undesirable vegetation at TD-1 | 11/15/2014 | 11/15/2014 | |
| Monitor and maintain desirable vegetation, control undesirable vegetation at TD-2 | G: 198. Monitor and maintain desirable vegetation, control undesirable vegetation at TD-2 | 11/15/2014 | 09/19/2014 | |
| Environmental Compliance | H: 165. Environmental compliance documentation | 01/31/2015 | 01/31/2015 | |
| Armor dikes at the TD-1 site | I: 186. Inspect and repair water control structures and dikes at TD-1 site | 01/31/2015 | 01/31/2015 | |
| Armor dikes at the TD-2 site | J: 186. Inspect and repair dikes at TD-2 site | 01/31/2015 | 01/31/2015 | |
| Seed and plant plugs into disturbed soil at TD-1 | K: 186. Seed and plant plugs into disturbed soil at TD-1 site | 01/31/2015 | 01/28/2015 | |
| Seed and plant plugs into disturbed soil at TD-2 | L: 186. Seed and plant plugs into disturbed soil at TD-2 site | 01/31/2015 | 01/28/2015 | |
| Water in wetland cells at TD-1 | M: 186. Operate water control structures at TD-1 | 01/31/2015 | 01/31/2015 | |
| Wildlife Area and BPA Administrative duties | N: 119. WDFW and BPA Administrative Requirements | 01/31/2015 | 01/31/2015 | |
| Numbers and species of waterfowl using TD1 and TD2 waters through the fall and winter | O: 157. Fall and winter waterfowl counts | 01/31/2015 | 01/28/2015 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Wildlife |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 185 | Periodic Status Reports for BPA | 02/01/2014 | ||||||
| B | 132 | Submit Progress Report for the period Feb 2013 to Jan 2014 | 02/01/2014 | ||||||
| C | 157 | Spring waterfowl pair counts | 12/31/2013 | ||||||
| D | 181 | Till cells at TD1 | 02/01/2014 | ||||||
| E | 47 | Moist soil seeding in TD-1 | 02/01/2014 | ||||||
| F | 198 | Monitor and maintain desirable vegetation, control undesirable vegetation at TD-1 | 02/01/2014 | ||||||
| G | 198 | Monitor and maintain desirable vegetation, control undesirable vegetation at TD-2 | 02/01/2014 | ||||||
| H | 165 | Environmental compliance documentation | 02/01/2014 | ||||||
| I | 186 | Inspect and repair water control structures and dikes at TD-1 site | 02/01/2014 | ||||||
| J | 186 | Inspect and repair dikes at TD-2 site | 02/01/2014 | ||||||
| K | 186 | Seed and plant plugs into disturbed soil at TD-1 site | 02/01/2014 | ||||||
| L | 186 | Seed and plant plugs into disturbed soil at TD-2 site | 02/01/2014 | ||||||
| M | 186 | Operate water control structures at TD-1 | 02/01/2014 | ||||||
| N | 119 | WDFW and BPA Administrative Requirements | 02/01/2014 | ||||||
| O | 157 | Fall and winter waterfowl counts | 02/01/2014 |