| Province | Subbasin | % |
|---|---|---|
| Columbia River Estuary | Columbia Estuary | 100.00% |
| Previous: | Next: |
|---|---|
| 60411: 2010-070-00 EXP CHINOOK RIVER ESTUARY RESTORATION |
* Expenditures data includes accruals and are based on data through 31-Oct-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| WDFW provides relevant information to BPA EC Lead. | A: 165. Environmental Compliance Documents | 08/31/2015 | 06/24/2015 | |
| Final Chinook Restoration Plan | B: 122. Complete Final Chinook Estuary Restoration Plan | 08/31/2015 | 06/19/2015 | |
| Public Outreach for the Chinook Estuary Restoration Plan | C: 99. Complete public outreach for the Chinook Estuary Restoration Plan | 08/31/2015 | 08/31/2015 | |
| Collect WSE data, manage tide gates, analyze Chinook River flow & WSE data & collect precip. data | D: 157. Surface water monitoring, data logger analysis, tidegate manipulation, and Ecology flow monitoring | 08/31/2015 | 08/31/2015 | |
| Construction of the Chinook Tidal Restoration Project as designed | E: 29. Sub-contractor to excavate tidal channel blockages at sites A, B, C & other sites, & fill ag ditches | 05/31/2016 | 10/05/2015 | |
| Install fence along new northern WLA boundary | F: 40. An estimated 6,250 ft of fencing will be constructed to fence out cattle around the new acquisition | 08/31/2015 | 06/19/2015 | |
| Construction Management Complete | G: 100. WDFW will hire and manage a sub-contractor to complete project construction | 05/31/2016 | 05/25/2016 | |
| All administrative tasks fulfilled with timely quality products | H: 119. WDFW MOA PM and Assistant will Manage the Chinook Estuary Habitat Construction Project | 05/31/2016 | 05/25/2016 | |
| Level 3 AEMR data-- Pre-construction | I: 157. Collect PRE-Construction AEMR Level 3 data | 08/31/2015 | 08/31/2015 | |
| WDFW Will Attach Chinook Progress Report for contract 60411 in Pisces (1-1-2013 to 3-3-2014) | K: 132. Submit Progress Report for contract 60411, covering the period 1-1-2013 to 3-31-2014 | 08/31/2015 | 08/31/2015 | |
| Chinook Restoration Area Revegetated with Native Trees and Shrubs | L: 47. Purchase and Install native plugs, scrubs and trees at Chinook Estuary Restoration Site | 05/31/2016 | 05/25/2016 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (Oncorhynchus tshawytscha) - All Populations |
|
| Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened) |
|
| Chum (Oncorhynchus keta) - Columbia River ESU (Threatened) |
|
| Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
| Coho (O. kisutch) - Unspecified Population |
|
| Steelhead (Oncorhynchus mykiss) - All Populations |
|
| Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened) |
|
| Lamprey, Pacific (Entosphenus tridentata) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 165 | Environmental Compliance Documents | 04/01/2014 | ||||||
| B | 122 | Complete Final Chinook Estuary Restoration Plan | 04/01/2014 | ||||||
| C | 99 | Complete public outreach for the Chinook Estuary Restoration Plan | 04/01/2014 | ||||||
| D | 157 | Surface water monitoring, data logger analysis, tidegate manipulation, and Ecology flow monitoring | 08/25/2014 | ||||||
| E | 29 | Sub-contractor to excavate tidal channel blockages at sites A, B, C & other sites, & fill ag ditches | 04/28/2014 | ||||||
| F | 40 | An estimated 6,250 ft of fencing will be constructed to fence out cattle around the new acquisition | 12/08/2014 | ||||||
| G | 100 | WDFW will hire and manage a sub-contractor to complete project construction | 04/01/2014 | ||||||
| H | 119 | WDFW MOA PM and Assistant will Manage the Chinook Estuary Habitat Construction Project | 04/01/2014 | ||||||
| I | 157 | Collect PRE-Construction AEMR Level 3 data | 11/17/2014 | ||||||
| J | 185 | Periodic Status Reports for BPA | 02/01/2014 | ||||||
| K | 132 | Submit Progress Report for contract 60411, covering the period 1-1-2013 to 3-31-2014 | 04/01/2014 | ||||||
| L | 47 | Purchase and Install native plugs, scrubs and trees at Chinook Estuary Restoration Site | 04/01/2014 |